Case File
efta-efta00933949DOJ Data Set 9OtherFrom: Jeffrey Epstein <[email protected]>
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00933949
Pages
3
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Jeffrey Epstein <[email protected]>
To: Rich Cortese
k Steve Hanson <
Cc: Craig Martin <1
Subject: Fwd: Fwd:
Date: Sat, 28 Apr 2012 18:48:09 +0000
As I could not have been more clear with the landscapers. that i wanted to see a small bed of changes on the
ground to assess their capabilites. and under no circurnstantes did i want to see drawings with many differnt
plants. I do not think it is productive to continie the dialogue with them .. I can't spend my time going through in
detail , waiting extra days , more then they promised only to recevie something that is as wrong as wrong can
be .
Forwarded message
From: Jeffrey Epstein <[email protected]>
Date: Sat, Apr 28, 2012 at 2:43 PM
Subject: Re: Fwd:
To: Craig Martin
Cc: Darren Indyke
, Richard Kahn c
a
craig„ I must have miscommunicated something there is no way , no way im spending a quarter of a million
dollars on a garage for tractors. the price is not right, you are again referecning prices that i know nad have told
you are incorrect. why would you again put in a price into a decision that i ve told you is wrong . I ask again,
the builidng is 50k. where is the other 200.. I=ve built three of these..
On Sat, Apr 28, 2012 at 12:31 PM, Craig Martin
wrote:
He sent me the list this morning. It's obviously a lot of equipment. 8 vehicles to move people, 3 tractors etc. I'll
see if i can value engineer/cut list with him.
Some equipment may be rented when needed.
With that said reducing a few fewer pieces would not reduce the size/price of the building that much. To do
that we would need to get rid of more equipment. If we keep everything the building would be good to keep it
in and out of sight.
ltematively we would have to reduce
the number of pieces of equipment further, park some in engineering (current building by dock) , park some in
current shed and some outside.
Also• there is push back on discharging Manuel and the two other guys.
wants "Just cause" so she can fill out the paper work. I suggested she just lay off with everyone else so
it looks cleaner to Labor Dept.
What are your thoughts?
Crag
From: Jeffrey Epstein [email protected]>
To: Craig Martin <
Sent: Saturday, April 28, 2012 11:14 AM
Subject: Fwd:
Forwarded message
From: Brice gordon
EFTA00933949
Date: Sat, Apr 28, 2012 at 10:32 AM
Subject: Re:
To: 'effre e stein <'[email protected]>
Cc:
>, TOM MELNICK
attached proposed equipment list and storage location list
i will bring revised layout to the table at 1pm today to show how this will work
i,m basing this on a larger shed 40 x 100 and extenision to existing shed.
considering two phase development of this area.
see you at 1
On Sat, Apr 28, 2012 at 5:52 AM, jeffrey epstein <[email protected]> wrote:
Furniture plan??
Sent from my iPad
Brice Gordon
Little Saint James
USVI
Phone:
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
EFTA00933950
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00933951
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Related Documents (6)
DOJ Data Set 9OtherUnknown
From: "Steve Hanson"
2p
DOJ Data Set 9OtherUnknown
From: "Steve Hanson" <
3p
DOJ Data Set 9OtherUnknown
From: Craig Martin
2p
DOJ Data Set 9OtherUnknown
From: Jeffrey Epstein <jeevacation®gmail.com>
3p
DOJ Data Set 9OtherUnknown
From: Craig Martin
2p
DOJ Data Set 9OtherUnknown
From: Craig Martin
3p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.