Skip to main content
Skip to content
Case File
efta-efta01013642DOJ Data Set 9Other

From: J <[email protected]>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01013642
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: J <[email protected]> To: Daphne Wallace Cc: Brice , Kyle reavis Subject: Re: Ken - 6 pm - December 13, 2018 Date: Thu, 13 Dec 2018 23:21:29 +0000 >, Richard Kahn look- this is silly , lets get a vanity with sink at home depot in stt or at lowes in palm beach fed exed, install it and move on . thx On Thu, Dec 13, 2018 at 6:54 PM Daphne Wallace < > wrote: Greetings Sir, The first slab is now cut into 3 pieces. These pieces each represent 1 counter-top of a Cabana - per Ken Cabana 1, 2, and 3. Ken told me that in the morning, he will cut the second slab into 3 pieces, and those are the pieces for Cabana 4 and 5. I said to Ken, "you mean Cabanas 1, 2, 3, 4 and the Flagpole?" He wasn't sure - he then said, the Cabanas and the kitchen. Ken explained that he was waiting to hear back on the blade to complete the miter cuts. He told me that he also has to cut narrow strips that will then be joined to the counter-top slab and will finish the edges. I then said, "So, you will cut the hole for the sinks when you get to the island on Saturday?", and Ken told me that this - what I am looking at tonight and tomorrow - is Phase 1 - these are the tops for the cabinets under the window. Phase 2 will be later - when he returns to the island to install these countertops, Ken will take the measurements for the vanity tops, and then he can cut the vanity tops from the slabs. He said when he was last there the vanities were not installed. I told Ken the vanities were installed, have been installed. I asked Ken what time he intended to be at his shop in the morning. He said from 7 am, then he had to leave at 11 for an appointment. He told me when I come by tomorrow afternoon the miter cuts will be completed. I told Ken I will come by in the morning on my way to the office. To summarize: 10:40 am - Ken and assistants unpacking slab number one to place on the work table 12:00 pm - Slab #1 is one the table - Ken is attempting to begin the miter cutting 3:00 pm - Slab #1 miter cutting is a no go - Ken and assistants are a no show 6:00 pm - Slab #1 is cut twice to create 3 equal pieces - I witness Ken make the second cut - (4-5 minutes, while we talked) Respectfully, Daphne EFTA01013642 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01013643

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.