From: Richard Kahn
To: Jeffrey Epstein [email protected]>
Subject: Fwd: ZM Roads and Culverts
Date: Mon, 19 Nov 2018 22:13:30 +0000
Attachments: ZM_Paving_Universal_Revl.pdf; ZM_Universal_Paving.pdf; ZM_MSC_Proposal_11-16-
2017.pdf
Inline-Images: ZM_ME_Roadl.JPG; ZM_ME_Roads2.JPG; ZM_ME_Roads3.JPG; ZM_41_to_Wel14.JPG;
ZM_412o_Wel14:RC.JPG
i reviewed attached correspondence regarding universal paving and there is no clear answer on how price found
them or selected
i did have a note that brice preferred mountain states however they were to busy for us with it 41 and other
work...
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Brice Gordon <
Subject: Fwd: ZM Roads and Culverts
Date: June 10, 2018 at 4:19:56 PM EDT
To: "jeffrey E." [email protected]>
Cc: Rich Kahn <
>, Zorro Ranch <
this time
Forwarded message
From: Brice Gordon <
Date: Fri, Nov 17, 2017 at 12:28 PM
Subject: ZM Roads and Culverts
To: "jeffrey E." <'[email protected]>
Cc: Rich Kahn
Zorro Ranch
Good Morning
attached Photo's and Proposals for your Reference
Roads & Culverts
The low spots on Main Entrance Road to the Ranch have been raised, approx 20", widen to its original width of 15' and 2 Culverts
installed.
EFTA01016179
V ditches of each side have been formed to assist in diverting water away from the surface of the road.
The Road to Well 4 and the Ranch's Water Distribution System has been Raised 12", V ditches formed. This Road could also be used as a
Secondary Ranch Access in the event something happens to block the main Entrance Road.
All Fencing has been repaired.
Compaction/Rolling of the Main Entrance Road and the road to Well 4 will continue next week.
The replacement of culverts at RC, 6 total will also start next week.
Paving Project.
As discussed, Mountain States Construction (MSC) was contacted to obtain a second proposal for Paving Project
MSC are widening the portion of Hwy 41 from Galestio to the just North of the Ranch.
Please if you are planing to visit it would probably be better to land in ABQ as there are 20 to 30 minutes delays due to this construction.
Do you wish Rich and I to proceed with confirming and finalizing proposals?
regards
Brice Cordon
Stanley, NM
Ph:
Begin forwarded message:
From: Brice Gordon <
Subject: Re: ZM Paving Options 2017
Date: July 18, 2017 at 12:28:15 PM EDT
To: Richard Kahn <
Cc: Zorro Ranch <
Rich
attached Paving Proposal from Universal Construction for your review
my apologizes, paving proposal did not attach to original email
regards Brice
On Wed, Jul 12, 2017 at 1:45 PM, Richard Kahn
> wrote:
jee would like to understand numbers better
please have universal provide a more detailed bid then we can call them to discuss
thanks
Richard Kahn
HBRK Associates Inc.
EFTA01016180
On Jun 29, 2017, at 7:08 PM, Brice Gordon <
> wrote:
Rich
Attached Paving Proposals, Universal Construction (6/2017) and Star Paving, (2015) for your reference
Jeffrey requested proposals for
1. Repaving Existing Road Main House
2. Paving of Area between Garages and Pole Barn at Ranch Central
I also include cost for paving from Main Gates, Ranch Central total, Ranch central to Main house
Star Paving proposal was forwarded in 2015.
regards
Brice Cordon
Stanley, NM
Ph
<Zorro Paving Options 2017.xlsx>
Brice Gordon
Stanley, NM
Ph: I
Brice Cordon
Stanley, NM
LSJ-GSJ, USVI
Ph:
EFTA01016181
EFTA01016182
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.