Skip to main content
Skip to content
Case File
efta-efta01016245DOJ Data Set 9Other

From: Kyle reavis

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01016245
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Kyle reavis To: "jeffrey E." <jeevacation®gmail.com> Cc: brice gordon < >, Richard Kahn Subject: Re: Cabana Bathroom Tile Date: Mon, 19 Nov 2018 14:26:42 +0000 Good Morning Mr Epstein, JPK will be wrapping up tile in cabana 1-4 today with the finished fixtures to be screwed in place tomorrow. The tile has gone slow due to the number of cuts they need to do with small showers and 2'x2' tiles. The men have been working non-stop all weekend to make sure they wrap this up for you. Shower doors are still on schedule to be in SST the 23rd. The only area that will be left are the shower door frames which will be removed after the glass is installed in the windows. Please let me know if you have any questions and I apologize for the delay. Very Respectfully, Kyle Reavis On Tue, Nov 13, 2018 at 3:08 PM Kyle reavis Good Afternoon, Please see tile and final sequence of events for cabana bathrooms; > wrote: Cabana 1: 14th - Demo bench, set all floor tiles, plaster ceilings 15th - Tile walls (all day) - Finish tile 16th - Toilet Install / Lighting install Awaiting Shower door delivery (23rd estimated) Window can receive Plexiglas in place of privacy glass to seal showers interim Cabana 2: 14th - set floor tiles , plaster ceilings 15th - Install toilets 16th - tile walls (all day) - Finish Tile 17th - Lighting Install Awaiting Shower door delivery (23rd estimated) Window can receive Plexiglas in place of privacy glass to seal showers in interim Cabana 3: 14th - set floor tiles , plaster ceilings 15th - install Toilets 16th - Lighting Install 17th - Tile Walls - Finish Tile Awaiting Shower door delivery (23rd estimated) Cabana 4: 14th - seal exterior door, plaster ceilings , set floor tiles 15th - Install toilets 18th - Wall tile Install (all day) - Finish 19th - Shower door Install EFTA01016245 Very respectfully, Kyle Reavis EFTA01016246

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.