Skip to main content
Skip to content
Case File
efta-efta01016960DOJ Data Set 9Other

From: Nice gordon

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01016960
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Nice gordon To: Rich Kahn Cc: J <*eevacation a mail.com>, michael glidden LSJ GSJ , Kyle reavis Subject: LSJ RO Fiber Date: Sun, 11 Nov 2018 16:10:49 +0000 Attachments: LSJ_Conduit_.pdf; Little_St James_Island_-_Fibre_Link_for_RO_plant_Rev_0_11-1- 2018_11.57.16_AM.pdf Hello Rich Attached: AVL Proposal, Supply and Terminate, Fiber Link of between the RO Plant and Sea Water Intake Pumps. Cost:$2753.69 Rogers Electric for Conduit. Cost:$7520.43 plus shipping Estimated Cost: $10,274.12 We are unable to Pull New Fiber in the the Existing Conduit from the Generator Building to Sea Water Intake Pump Controls. The fiber connection allows the RO Plant to communicate to the Sea Water Intake Pumps located outside the Tunnel. The conduit is for the Duct Bank, to be dug from the Generator Building out to the Sea Water Intake building, with a new feeder for GSJ. At this time the Sea Water Intake pumps are being run in Manual Mode. LSJ will Dig, Install conduit and Pull Fiber. Can we proceed with ordering Fiber and Conduit? regards Brice Cordon The Saint James Group USVI Ph EFTA01016960

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.