From: Nice gordon
To: Rich Kahn
Cc: J <*eevacation a mail.com>, michael glidden
LSJ GSJ
, Kyle reavis
Subject: LSJ RO Fiber
Date: Sun, 11 Nov 2018 16:10:49 +0000
Attachments: LSJ_Conduit_.pdf; Little_St James_Island_-_Fibre_Link_for_RO_plant_Rev_0_11-1-
2018_11.57.16_AM.pdf
Hello Rich
Attached:
AVL Proposal, Supply and Terminate, Fiber Link of between the RO Plant and Sea Water Intake Pumps.
Cost:$2753.69
Rogers Electric for Conduit.
Cost:$7520.43 plus shipping
Estimated Cost: $10,274.12
We are unable to Pull New Fiber in the the Existing Conduit from the Generator Building to Sea Water Intake Pump Controls. The fiber
connection allows the RO Plant to communicate to the Sea Water Intake Pumps located outside the Tunnel.
The conduit is for the Duct Bank, to be dug from the Generator Building out to the Sea Water Intake building, with a new feeder for GSJ.
At this time the Sea Water Intake pumps are being run in Manual Mode.
LSJ will Dig, Install conduit and Pull Fiber.
Can we proceed with ordering Fiber and Conduit?
regards
Brice Cordon
The Saint James Group
USVI
Ph
EFTA01016960
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
mail.comForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.