Skip to main content
Skip to content
Case File
efta-efta01019179DOJ Data Set 9Other

From: Nice gordon •tta

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01019179
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Nice gordon •tta To: J <jeevacation®gmail.com> Cc: Rich Kahn LSJ GSJ Subject: LSJ RO Sea Water Intake Pumps Replacement Date: Fri, 19 Oct 2018 13:36:32 +0000 Attachments: LSJ_Gem_Intake_Pumps.pdf; LSJ_SW_Pumpsjpg Good afternoon As discussed attached for your review Proposal from Gemini Sea water Systems to replace existing original RO Sea Water Intake Pumps. Cost for Material and Installation $75,310.00 Photo's of existing original Sea Water Intake Pumps. The Existing Sea Water Intake Pumps are original to the install of the 90k SWRO Plant. This System was designed for 2 x SWRO Plants, only one plant was installed, hence 4 pumps. The Existing Intake System requires only one pump to supply the 90k SWRO Plant The Expanded SWRO Plant will require 2 of the 4 pumps. At this time 2 of the 4 pumps/motors and the priming pump/motor need replacing, therefore we have no redundancy. The attached proposal is for 2 x 15hp motors with S/S fluid ends with VFD's and Priming Station, I pump to supply SWRO, 1 as a redundancy. New piping, valves, S/S strainer baskets are also included in cost 4 week lead-time for Pumps once ordered how do you wish to proceed regards Brice Brice Cordon The Saint James Group USVI Ph: EFTA01019179

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.