Skip to main content
Skip to content
Case File
efta-efta01032771DOJ Data Set 9Other

From: Lany Visoski <Ma>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01032771
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lany Visoski <Ma> To: Je vacation <jeevacation®gmail.com> Cc: Rich Kahn Subject: Flight Dept Updates Date: Wed, 20 Feb 2019 22:30:18 +0000 Larry Jeffrey, I requested Paint slot dates available for Savannah and a paint color chart to be Fedex to me, Rusty will get back with dates, if you elect to paint„ Eric needs be G550 for interior work, we can't go to paint shop during this time. G550 interior I spoke to Eric and Jay, G5 input March 9th or 11th is fine, (2 weeks downtime), as long as you clarify some items with Eric. 1-subwoofer under Divan 2-are you building the Sound bar under the ledge? If not„ why do you want the SUB Woofer close out under divan. 3-coffee makes steam, is unclear. Eric also informs he needs to compile an invoice, jokingly, he doesn't remember how many Divan mattresses he has fabricated. S76 Interior Down time 4 weeks total, Full veneer included, if all design and materials are in Eric's possession before the Heli arrives., S76 Prebuy I spoke to AAG The earliest input is April 22nd, due to the size of the work scope due, They are trying to see if we could start earlier: 1-12month annual 2-36month 3-100/300/600 hour 4-1250 hour Bearing Change 5-tailrotor Cable change 6-FAR 91:411;13 transponder checks 7-prebuy log book research. I request Prebuy price quote for the above„ ***Also, I will request the Float system bottles be changed since they are due time change April 2019„ there are 4 bottles, at $10k each„ I will make Seller responsible for this expense. GIV 36month inspection drop dead date is April 15th. CPDLC / 36month install downtime 4weeks. G550 Landing gear, Pete is planning to have Hawthorne avaition in Islip accomplish this inspection during Eric Roth's interior installation„ drop dead date for G550 gear is April 15 as well., EFTA01032771 Input GIV for CPDLC install and 36month inspection After G550 comes out of Eric interior install?? Does this schedule work for you? GIV CPDLC after G550 is completed? Sent from my iPhone EFTA01032772

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.