Skip to main content
Skip to content
Case File
efta-efta01033309DOJ Data Set 9Other

From: Stephanie Remington

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01033309
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Stephanie Remington To: J <[email protected]> Cc: Patrick Cena , William B Hague Wallace Subject: Re: Progress Report_040119_040719 Date: Mon, 08 Apr 2019 18:08:06 +0000 >, Daphne Patrick and Boscoe went to PR to look at the Midship Marine 44 1/2 ft aluminum catamaran. With new engines, possibly the bottom reskinned, and some paint and other cosmetic work, Boscoe and Patrick believe that this could be a very nice crew boat to last for a long time. It had a COI for 54 people. It has a lot of space but is not too big. Patrick says it's the perfect size for what we need. It's a very well built boat. They are researching now the cost of engines, reskinning, etc. in order to have a full report for you while you are here. I am copying Boscoe and Patrick so they can provide more details. Details for engineering doors were confirmed and ordered. We do not yet have a ship date but I will work with Daphne to expedite this information for you. We are expecting the following this week (6 of 7 BOLs arriving today): Chromix for roads, new electric car, big light order, 6 water heaters, Roof kits for Xmas Cove, Gemini shipment, doors for 5 Palms, 2 55 gallon drums of rust bandit, lattice for tiki Stephanie Remington LSJE, LLC On Mon, 8 Apr 2019 at 13:30, J [email protected]> wrote: try to give more info what happened wtih crew boat , when are enginnering doors arrivimg. ? On Mon, Apr 8, 2019 at 1:28 PM Stephanie Remington > wrote: Please note: This is a summary of the last week's focus, not a comprehension of all projects. Carpentry. Lattice frames are complete. Estimated arrival for lattice is 4/9. Set cabinets in tiki. Assisted with hauling fumiture for cabanas. Reassembled all beds for cabanas. Assembled desk in FPP Cabana. Still working on gates for FPP. New latches purchased for lighter gates. Still weatherproofing roof connection between tiki kitchen and main tiki on LSJ. Electrical/Plumbing. Reassembled Cabana 3 sink, vanity, toilet. Ran new trench and conduit for 5 Palms power fiber optic — completed. Inventorying parts for water distribution manifold rebuild on LSJ. This is the first step to redoing all the pumps to remedy the water pressure issues island wide. Installed electrical for new dryer in staff cottage — LSJ. Fine tuned electric and plumbing in all cabanas. Created drain in A/C unit under master to remedy dripping issue on wall. Engineering. Records updates. Plexy glass on cat 325. Prepare concrete car mix. Assist Cash in generator room. Carry fumiture to cabanas. Prepare fuel truck for inspection. Bike maintenance. Clean hammer on trackhoe. Kawasaki cart hand brakes. Troubleshoot door latch on cart. Pressure wash fuel truck. Water to GSJ w new tractor. Ash (rust guy) working on blue and Polaris xp. Paint generator lights. Heavy Equipment. Dug trench for 5 Palms power and fiber repair; work complete. Jackhammered stone at Pebble Beach. Several loads of water to GSJ for new plants and pool. EFTA01033309 Took delivery of 4 loads of topsoil for new planter at main compound. Assisted with unloading BOL shipments. Fuel truck re-registered. Delivered 2000 gallons of diesel - St. Thomas to GSJ. Housekeeping. Cleaned and setup all cabanas, chillax, library (after rug installation), flagpole pool, and master (after cistern work). Landscaping/Masonry. Continuing at Pebble Beach. Assisted with rug install in library. Planting by GSJ tiki. Planting at container building at Christmas Cove will occur once roof is in place as scaffolding will need to be utilized. Marine. Went to PR to assess possible crew boat. Painters. Finished painting interior of all cabanas, chillax and bath. Paint ceiling to floor storage room in tunnel after cleaning guys cleaned. Rust remediation and paint at tower antenna. Following the rust guy and cleaning guys as needed. RO/Maintenance. Oversee cistern cleaning and sealing. Second coat has been applied. Now sealed and will cure for 7 days. Then will be ready for fill. New ozone system for cistern has been purchased and is approximately one week out. Desal maintenance and pools. Contractors on island: Jeffers — Coloring will be delivered to LSJ Monday 4/8. Has been asked repeatedly by Daphne and Mike for a start date. Could use a nudge from Rich. Danny — Continuing work on MC Flower Bed. Kitchen Solvers -- Countertops scheduled for install May 3-6. Paul's Petroleum — will be on island week of April 22 to install high volume diesel nozzle so we can fill our own truck Other Notes: Rust remediation. Rust guy tasked to set cabinets in tiki and address leaking a/c beneath master. Now working on generator room. Very big rust project! Master cistern. Second round of thoroseal complete. Being filled now. Proposal for storm Shutters for RO, Generator, GSJ staff cottage, LSJ staff cottage — submitted to Rich and was approved. All interior and exterior doors for RO, generator buildings ordered. 40X60 replacement building for engineering has been ordered. Construction drawings for GSJ staff cottage have been submitted. Stephanie Remington LSJE, LLC please note The information contained in this communication is confidential, may be attorney-client privileged, may EFTA01033310 constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01033311

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.