Skip to main content
Skip to content
Case File
efta-efta01035134DOJ Data Set 9Other

From: Larry Visoski clia>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01035134
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Visoski clia> To: Je vacation <jeevacation®gmail.com> Subject: Flight time Date: Sat, 23 Mar 2019 12:51:02 +0000 Jeffrey Paris to Doha is 5+55min (+27kt tailwind). G550, the 24 Month inspection is due by March 31st, Pete already accomplished all the 24month items while in Teterboro during the last few trips, the only thing he could not accomplish was the Gear inspection, this has a 15 day grace period, which brings us to April 15th due date for the Gear. GIV, Requires the 36month inspection due by March 31st as well, which gives us until april 15th as well. ***Both are calendar inspections that have a 15 day grace, the aircraft can fly after april 15th, with NO passengers, and requires a FAA Ferry Permit to the fly to the Mx facility for its inspection as last resort, if needed. Hope this helps Thx Larry Sent from my iPad EFTA01035134

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.