Skip to main content
Skip to content
Case File
efta-efta01049718DOJ Data Set 9Other

From: ann rodriquez

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01049718
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: ann rodriquez To: Jeffrey Epstein <[email protected]> Richard Kahn < Cc: John Christensen < Subject: LSJ/GSJ: Mandatory list (New items, In progress & Completed) Date: Tue, 11 Apr 2017 18:42:11 +0000 Hey Bossman, Would you like to add these 18 other items to the LSJ/GSJ "To do list"? Please advise NEW ITEMS: -Hurricane Drain Staff bath (LSJ) 6 days needed Notes: Septic tank is cracked and causing septic backup into the staff bath. We need to remove the cracked septic tank and install a new septic tank and new lines. -Fencing from Home Depot (GSJ) install across from barge ramp -Clean out Woodshop (LSJ) remove everything, clean out then re-organize -Tennis court fencing -Irrigation lines from Main compound to Ficus and Master drive (GSJ) -Transplant Oleanders from waterfall to GSJ (Chris request) -Bottom paint GSJ boat total (cost $1,500.00) -Gel coat inside of GSJ boat (in house cost of materials $600) -LSJ Tennis Court fencing repairs -Hydroseed MC hillside -LSJ Stone wall from Dock entrance to Tiki plant terrace -LSJ Basket need replanting -Continue lining GSJ roads -Paint RIO building -Cool Signs: Large Private sign for GSJ -Build wall in Solar room on GSJ -Fix broken power line to GSJ swimming pool -Paint GSJ Bike shed green IN PROGRESS: -In progress -GSJ Shed: Sylvester to Build wooden shed for Bossman's Bikes and Maverick across from barge ramp to be completed 4/13 -In progress -Rich & Brice purchase a new truck -time frame 10 days -In progress -F450 new bed with gate asap -no excuses (Pickup date from Baptiste Welding 4/21 -In progress -GSJ Storage area: Plant ficus or anything that grows tall across from Barge ramp. Ficus arriving to GSJ tomorrow 4/11 at 11am -Library: Inside lights are flickering. Ballace arrived Friday 4/7 -Treadmill Motor: on LSJ 3/23. Ready to install today 3/23 or 3/24 JE to advise. New part ordered 4/4 arrival of part 4/10/17 -Pebble Beach: Clean-up & repaint (To begin 4/12) -GSJ Cistern: Backfill cistern and plant trees or flowers around it. (Backfill completed) might put Oleanders around GSJ Cistern -GSJ Cistern: Close the cistern permit immediately if Mr. Rosa is not employed by DPNR (JE to advise) -Deer's: Kill all Deers -Danny V. have Arrows and Shot gun just need a weekend on LSJ -Helipad pour w/lights: to be done in house (Blue Water Bid) -Brice to send Bossman Chillax plan (Blue Water Bid) -Russ Electric: LSJ Generators -LSJ Flagpole: Purchase new carpet (Karyna & Karen) -LSJ: Purchase new outdoor furniture or cushions (Karyna & Karen) COMPLETED: Items to get done asap with no excuses: Start date for everything began today 3/8: -En-pregrest--Flathetl-statusliteed-eemplefiea-date?-3/24-werrt-te-get-sentiblestetter remeve-rest pr..y. en G J. 3/13 Dm..., V. & C. to pull fiber o.. GCJ p. ey. en Ccncrat r part arM,cd on C._,J 3/22 -Inrogrest--2-Mester-Betireenrovaffs-3/-1-3t-Berty-terrewire-fightfar wherrlaupsetiis-eempfetetl-with-the-tivelfs-brMester Shirt Jut, 3/27 LSJ I lotackccp;ng steps EFTA01049718 New items added on 3123: Purehaac Appliai.cet for Chris cottage. Bc;ce al Kart.. purthuo,..1 -Stofte-vreeleat-L-Sd-I3oele.-stemetrOtIftd-heve-Sylve-steH3elme-at-the-Beelt -Pebbie-Beadr.-elearmar seler-friffgeTsetar-fan-ete CO3: Cil,on, nuHielJ;rty CO3: Outside °Ilower-ha .dIe need to ',pl.,- 0O3. Dioken fight C04: f;x Jitiviur door ;,...,;‘1, 1;ber. Jerma;..e n,ed to pur,has, rade/. Cab...et fur C.CJ fade. Ork;.e. wore .at bat, eve. "'here (2x a month) every ls-to.d 15th Maatcr Drive. 4hitc Louya;..v;II,a Heil Cate: Repair a. .d epuo3;te 3;de of I Id; yut, -Satidi-pletare-framest-Frem÷Pairms-te-GS±offtee -Pebbie-Beaelt4nstall-Sefar-Fan -Pebbie-Beaelt4nstall-Sefar-frielge rebblc Beach: Purditt-re baLle a..d chairs I.e... I D,Fut rebblc Beach: R,Thove cu.," t -Gyny-C—heek-and-turrreff-steree-at-ali-times Gym: Checl, and tut.. off NC ;.. yeg. Materfa+k-Renteve-seme-ef-the-ofeentlers-and-pfant-somerthere-e+se-to-see-if-tner MN-Mawr -Me-Lanterfts..-Peilsb-and-Painflettgar-Mi+I-Lenterne-donej MC: raint all .a;I;nys at tl,e Man. -Beath--2:-C-feen-up Beach 3: Clean up -1-6-NGS-J-Palm-Treest-Fertilite-a+l-Painr-Trees -Bental-Gfrteel -eheek-all-wiriritartd-maRe-stenething-is-ftlflftifltron-the-Bentalthair-Karyna-advisetl-elanriy -LSJ Water testing: Master Bedroom, Kitchen, all Cabana's and Flagpole -GSJ Water testing: Master Bedroom, Kitchen & Bedrooms -L-Szl-Potevie-Roomt-Eiteek-for-water-lesks-at-the-Main-Gempotiftel LSJ Pyl,fie;c Room: Nx NC ina-barp LSJ Court yard palma: remove Vt;rcb h fh.. /Much di-th.. 4 palma ;. rtl .8 %NU. Ey a. d -Better-Reads:-Remove-piwer-frem-L-SzHendfilFor-hide -L-SzliG&P.-NO-SMOKINGionly-M-Ghris-house) Ann R. DISCLAIMER: The information contained In this e-mail may be privileged,confidential, and protected from disclosure. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or duplication of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and delete all copies. EFTA01049719

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.