Case File
efta-efta01083127DOJ Data Set 9OtherGulfstream
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01083127
Pages
24
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Gulfstream
PRODUCT SUPPORT
PROPOSAL
Prepared for
Presented by
Gulfstream GV Serial Number 572
Torn Baliya
South Aviation, Inc.
Regional Sales Manager, Gulfstream Aerospace
Mr. Fred Machado
EFTA01083127
TABLE OF CONTENTS
PART I. Workscope Description
3
A. Interior Refurbishment
3
B. Avionics / Cabin Electronics
3
C. Mechanical
3
D. Paint
7
PART II. Contingencies and Assumptions of Proposal Offer
8
A. Estimated Leadtime
8
B. Estimated Downtime
8
C. Pricing And Scheduling Terms
8
D. General Contingencies
9
E. Addendum To Proposal And Work Authorization Terms And Conditions.. 10
PART III. Payment Terms and Remittance Instructions
11
PART IV. Executive Summary and Proposal Acceptance
12
EFTA01083128
ID # 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART I. Workscope Description
A. INTERIOR REFURBISHMENT
Not Requested
B. AVIONICS / CABIN ELECTRONICS
Not Requested
C. MECHANICAL
1. Aircraft Records and Condition Survey
1.1 Lite Package - Aircraft Records and Condition Survey (ARCS) - Exhibit 1
$27,000
Included in Lite Package:
•
Aircraft Records Survey (see section below)
•
Aircraft Condition Survey (see section below)
1.2 Basic Package - Aircraft Records and Condition Survey (ARCS) - Exhibit 2
$47,500
Included in Basic Package:
•
Aircraft Records Survey (see section below)
•
Aircraft Condition Survey (see section below)
•
ARCS Test Flight (see section below)
•
APU Borescope Inspection (see exhibit)
•
Left and Right Engine Borescopes and Engine Runs (see exhibit)
1.3 Standard Package - Aircraft Records and Condition Survey (ARCS) - Exhibit 3
$75,000
Included in Standard Package:
•
Aircraft Records Survey (see section below)
•
Aircraft Condition Survey (see section below)
•
ARCS Test Flight (see section below)
•
APU Borescope (see exhibit)
•
Left and Right Engine Borescopes and Engine Runs (see exhibit)
•
Nose and Main Landing Gear and Components - Detailed Inspection (see exhibit)
•
Aircraft Brake Inspection (see section below)
1.4 Premium Package - Aircraft Records and Condition Survey (ARCS) - Exhibit 4
$98,000
Included in Premium Package:
•
Aircraft Records Survey (see section below)
•
Aircraft Condition Survey (see section below)
•
ARCS Test Flight (see section below)
•
APU Borescope (see exhibit)
•
Left and Right Engine Borescopes and Engine Runs (see exhibit)
•
Nose and Main Landing Gear and Components - Detailed Inspection (see exhibit)
•
Aircraft Brake Inspection (see section below)
•
500 Hour / 1 A Inspection Codes (see exhibit)
•
12 Month / 1C Inspection Codes (see exhibit)
•
1000 Hour / 2A Inspection (see exhibit)
Page 3 of 14
This proposal is confidential between Gulfstream and the Customer.
soh
Return to Table of Contents
GAC Rev. February 5.2015
EFTA01083129
ID * 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART I. Workscope Description (Continued)
C. MECHANICAL (CONTINUED)
1. Aircraft Records and Condition Survey (Continued)
Workscope Description
Note: Please refer to the above items when determining which sections apply to the Package selected.
Special Requirements:
•
Review workscope and identify points of contact with both buyer and seller present and have both parties sign the
Hold Harmless Agreement.
•
The party requesting and financially obligated for the Aircraft Records and Condition Survey (usually the Buyer)
must have an authorized representative sign the work order and the Hold Harmless.
•
There will be a representative from all parties involved that will make decisions on all minor corrective actions to
be accomplished during Aircraft Records and Condition Survey. If there is no representative present, no
corrective action can be accomplished until authorized.
•
Upon completion of the Aircraft Records and Condition Survey, the discrepancy list will be provided to the party(s)
responsible for disposition. If a second or third party is involved with rectification of any discrepancies found, the
parties will identify who will be responsible for the corrective actions. At this time, separate work orders will be
opened and responsibilities assigned to each party for the work requested.
•
All parties involved, based on the Service Center workload, at that time will mutually agree to the downtime
schedule for the authorized work.
Aircraft Records Survey includes the following:
•
Review of Maintenance History and Records: A review of all available maintenance records will be accomplished.
The review will include a search for recorded damage history, special inspections accomplished, missing records,
compliance with required inspections, maintenance, and mandatory directives. Any problems with incomplete or
improper maintenance entries, missing certificate numbers or signatures, or disorganized maintenance logs will
be documented in the report. If a complete reconstruction of maintenance records or logbooks is desired, it will be
considered an effort over and above the basic Survey price and schedule and will be performed at time and
material upon approval.
•
Documentation of Non-Applicable Maintenance Bulletins: Gulfstream will update the aircraft records for non-
applicable or previously accomplished directives (ACB, CB & AD) that are not documented in the maintenance
records. A budgetary estimate to research and document non-applicable or previously accomplished bulletins is
$75 per occurrence. Incomplete records may substantially increase this cost.
•
Review of Required Aircraft Documentation: A review of weight and balance, equipment list, and electrical load
analysis will be performed to determine that the known current aircraft configuration is reflected. All data will be
cross-referenced against Major Repair and Alteration FAA Form 377 found and the avionics inventory. Subject
matter and date of Form 337 and any related Supplemental Type Certificates (STC's) numbers will be listed. The
certificate of airworthiness and current registration will be checked to ensure a match to the aircraft.
•
Review of Required Flight Manuals & Supplements: Gulfstream approved flight manuals will be reviewed to
determine revision status and presence of all required approved flight manual supplements. Flight manual
supplements will be cross-checked against STCs.
•
Update of Required Flight Manuals and Supplements: If required, Gulfstream will update any missing or outdated
items in the flight manual supplements section of the flight manual or supplement binder with current data. A
budgetary estimate to research and retrieve missing flight manual supplements is $75 per occurrence. Incomplete
records may substantially increase this cost.
Page 4 of 14
This proposal is confidential between Gulfstream and the Customer.
sd'
Return to Table of Contents
DAC Roy. February 5, 2015
EFTA01083130
( ;u: silvan, GV
ID # 7018884. ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART I. Workscope Description (Continued)
C. MECHANICAL (CONTINUED)
1. Aircraft Records and Condition Survey (Continued)
Aircraft Condition Survey includes the following:
•
Cockpit and Cabin Avionics Equipment - Operational Test: A cockpit avionics ramp check is performed and
involves powering up all major avionics equipment and operationally testing systems, such as navigation,
communication and flight management systems for proper operation. A cabin ramp check is performed and
involves powering up of cabin outfitting components and systems. This test does not include the use of test
equipment or troubleshooting of avionic systems. Results will be fully documented on the work order and
findings will be highlighted in the Survey. As the Survey progresses, discrepancies may be identified. At this
point, discrepancies will be listed on summary sheets and provided to customer. Any Engineering dispositions
will be an additional expense and will be billed, as required.
• Inventory of Avionics and Emergency Equipment: A physical inventory of major avionics equipment will be
accomplished and the results recorded in the report. The avionics inventory is limited to accessible areas
only, additional access will be billed at time and material. This inventory will be cross- referenced against the
equipment list during the documentation review. All cabin and cockpit installed emergency equipment will be
inventoried and recorded in the report.
•
Physical Survey: Is in accordance with attached Gulfstream CMP (Computerized Maintenance Program)
tasks, which provide a detailed view of specified areas of aircraft. The suggested survey workscope is
intended to provide you with a general visual evaluation of selected areas of the aircraft.
•
Cockpit and Cabin Compartment Above Floor Inspection: A general visual Inspection will be performed of
cockpit, cabin, and baggage compartments for mechanical and cosmetic discrepant conditions which are
deemed as unsatisfactory. Interior access will not be required or included for this general visual inspection.
Note: This general visual Inspection does not include NDT of cabin windows.
•
Optional FAA 135 Regulation Log Research: A budgetary estimate to perform a FAA 135 Regulation Log
Research is approximately $3,500. This FAA Part 135 Regulation Log Research is limited to the collection of
pertinent parts tracking documents associated with Life-Limited or otherwise tracked serialized components,
which are currently, installed on the aircraft from the aircraft historical records files supplied by the operator at
time of aircraft input. Note: This research does not imply to include any requirements as to pertain to the
physical condition of the aircraft in regards to FAA Part 135 Compliance.
Aircraft Records and Condition Survey Report:
•
The report is a bound document and is divided into indexed sections. The format facilitates rapid access to
desired information and highlights the major elements of the Survey. All findings and information yielded by
this Survey will be provided in the report and on the related work order upon completion of the Survey. Two
(2) copies of the report will be provided to the purchaser of the Survey and one (1) copy of the discrepancies
noted to the owner (additional report copies are available at $150/each). Copies will not be provided to any
other party including the owner of the aircraft unless expressly authorized in writing by the purchaser of the
Survey.
Page 5 of 14
This proposal is confidential between Gulfstream and the Customer.
seh
Return to Table of Contents
GAG Rev. February 5. 2015
EFTA01083131
ID # 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART I. Workscope Description (Continued)
C. MECHANICAL (CONTINUED)
1. Aircraft Records and Condition Survey (Continued)
ARCS Test Flight:
•
This is an extensive flight test regimen flown by Gulfstream test pilots. The flight test card will be identical to
the one used by Gulfstream's Flight Department to evaluate pre-owned aircraft being considered for purchase
by Gulfstream.
•
ARCS Flight results are fully documented and reported in the work order and the ARCS Survey Report.
•
Gulfstream Test Pilots are not located at all Gulfstream facilities. All pilot travel expenses (if required) and
fees will be the responsibility of the customer per the Gulfstream Labor Rate letter.
•
Included in the item price:
-A-
Pilot Labor (for test flight only)
Preflight Traveler (required prior to Flight Test).
•
Not included in the price and (if required) are estimated at $7,500":
Pilot Labor (for travel only)
Per Diem — Two (2) Pilots for Two (2) Days
Lodging — Two (2) Rooms for One (1) Night
Rental car — One (1) Day)
4 Airfare — Two (2) Round Trip
"Based on U.S. Domestic travel.
•
Fuel for the Flight Test will be billed separately. For budgetary purposes, an estimated 1,800 to 2,300 gallons
of fuel will be required to accomplish the test flight. Actual charges will vary depending on the amount of fuel
on the aircraft at arrival, and fuel prices at the time of service.
Standard Package Brake Inspection (accomplished on the Aircraft):
•
A detailed visual inspection of the brakes will be accomplished (without disassembly) prior to removal from the
aircraft. This will include inspection of the drive clips and leak checks.
•
The Brake wear indicators will be measured and the remaining wear will be documented in the work order.
•
Following the landing gear corrosion inspection (see CMP exhibit), the brakes will be reinstalled and a complete
functional test performed.
Premium Package Brake Inspection (accomplished at a Gulfstream repair and overhaul facility):
•
The brakes will be removed and sent to a Gulfstream repair and overhaul facility for the following:
Detailed Visual Inspection
Heat Pack Removal and Inspection (Note: Any remaining wear will be documented in the work order.)
Key Slot/Tenon Slot Inspection
••• Torque Tube Inspection
Cylinder Block Teardown and Inspection
Leak Checks
•
Discrepancies will be documented on a work order with determination of the financially responsible party (buyer
or seller), prior to commencement of the work.
•
Upon completion of the inspection, the brakes will be reinstalled and a complete functional test performed.
Page 6 of 14
This proposal is confidential between Gulf stream and the Customer.
sch
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083132
rerun GN,
ID # 7018884, ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART I. Workscope Description (Continued)
C. MECHANICAL (CONTINUED)
1. Aircraft Records and Condition Survey (Continued)
Optional Services:
•
Gulfstream also offers a complete in-house detailing service for your Gulfstream aircraft. Our experienced
team of professionals can perform any detailing service; from a dry wash of the aircraft exterior to
shampooing and stain-treating carpets and furnishings.
•
Exterior services include washing of the aircraft (to include landing gear), waxing the aircraft with Aeroglaze,
buff and polish of leading edge "brite work', and sanding to remove surface corrosion. An application of
Teflon coating is also available to enhance the life of your paint as well as to reduce aircraft exterior cleaning
time and costs.
•
Interior services include sanitizing galley and lavatories, re-corking of drawers, shampooing of carpets, re-
oiling of leather, and an application of soil and stain repellent for the carpet and upholstery.
D. PAINT
Not Requested
Page 7 of 14
This proposal is confidential between Gulfstream and the Customer.
set
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083133
I
ID # 7018884, ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART II. Contingencies and Assumptions of Proposal Offer
Unless expressly stated otherwise in writing, this proposal and the Workscope pricing information included in Part I
Workscope, (-Proposer) is based upon the following contingencies and assumptions associated with the activity and work
required for the work scope defined in Part I Workscope (-Work-). Additional charges for any Customer-approved Work
ultimately performed on Gulfstream GV aircraft, Serial Number 572 (-Aircraft"), which is beyond the scope of this Proposal
will be billed on a time and materials basis, except as otherwise expressly agreed in writing between the parties. The term
Customer shall refer to South Aviation, Inc. ("Customer) in this Proposal.
A. ESTIMATED LEADTIME:
This Proposal provides for leadtimes. Leadtime is an estimate expressed in calendar days to allow for planning and
scheduling of the Aircraft service visit. Leadtimes commence upon Gulfstream's receipt of Customer's signed Proposal
and material callout selections. Leadtimes may be addressed by other relevant contingencies set out in this Proposal.
B. ESTIMATED DOWNTIME:
This Proposal provides for downtime. Any downtime estimates included in this Proposal are based upon Gulfstream's
general understanding of the time required to accomplish the work outlined in this Proposal. Said understanding is in turn
based upon Customer satisfying any leadtime requirements. Estimated downtime may be adjusted depending on the final
induction schedule and mutually agreed facility selected for completion of the Work. For the avoidance of doubt, any
expression of downtime is only provided as an estimate. This estimate is not a contractual commitment by Gulfstream.
Estimated downtime is stated in working days, defined as Monday through Friday, excluding applicable recognized local
holidays. If additional Work is required beyond that specifically identified in this Proposal, then the estimated downtime
may be extended by Gulfstream. Estimated downtime may increase or decrease depending upon the availability of the
mutually agreed facility selected for completion of the Work.
C. PRICING AND SCHEDULING TERMS:
This Proposal is contingent on all Work being accomplished during a single coordinated maintenance visit.
The quoted prices contained herein are valid (i) if the Proposal is signed and returned to Gulfstream within ninety (90)
days of the date of the Proposal, and (ii) the Work is scheduled to be accomplished at a mutually agreeable facility and
time within six (6) months from the date of this Proposal.
Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each
Gulfstream US facility. Proposals for work at any non-US Gulf stream facilities are specific and binding only as to the
facility identified on the Proposal.
Overtime: Gulfstream will not charge overtime for the Work required in this Proposal, unless there are (i) Discovered
Discrepancies as addressed below, (ii) Changes documented on Work Change Requests (WCRs) as described below, or
(iii) Customer requests to accelerate the estimated downtime for any Work. Customer must approve all overtime activity
prior to Gulfstream performing and billing for overtime.
Discovered Discrepancies: Except as specifically identified in PART I Workscope, this Proposal does not include repairs
to the Aircraft resulting from discrepancies in the Aircraft (including without limitation corrosion) discovered during the
performance of the agreed Workscope. All discovered discrepancies will be corrected upon request at additional charge
and with additional downtime. This process is further described in the Changes (VCRs") paragraph.
Page 8 of 14
This proposal is confidential between Gulfstream and the Customer.
sob
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083134
ID It 7018884, ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART II. Contingencies and Assumptions of Proposal Offer (continued)
C. PRICING AND SCHEDULING TERMS (continued)
Changes ("WCRs"): This Proposal is subject to further financial and schedule modification, which will be documented on
work change requests ("WCRs") presented to the Customer for approval, if any of the following occurs:
•
Subsequent to the date of this Proposal, a relevant aviation regulatory authority or OEM (including Gulfstream)
publishes any change in relevant technical documentation which affects the Workscope.
•
Additional billable work, which is not specifically delineated in the Workscope, is required to perform the quoted
Workscope. This additional work may include by way of example relocation of existing aircraft equipment, beyond
that already defined in the Workscope, due to space limitations.
Consumables: There will be a 4.0% charge for consumables, to a maximum of $5,000, on all work orders containing
labor revenue charges. This charge will be calculated based on the total labor revenue man-hours invoiced on the work
order. Only invoices defined as `Road Trip Invoice- will be exempt from this charge.
CFE, Drop Shipments and Handling Fees: Customer furnished parts or equipment ('CFE") and drop shipments made
by the Customer to Gulf stream will be subject to a handling fee of 15% based on current manufacturer list price of the part
or item furnished. The handling fee will not apply to parts originally purchased from Gulfstream. Proof of purchase from
Gulfstream must be shown to waive the handling fee.
Third Party Vendors: Any estimates given for services provided to Gulfstream by outside vendors, whether for repair,
calibration, overhaul, exchange or the like, are subject to adjustment based upon the actual charges billed to Gulfstream
by such outside entity.
Excluded fees, taxes, etc.: All prices stated herein are exclusive of freight, fuel, flight costs, environmental fees, and/or
any applicable taxes.
Exchange Services — Retention of Removed Equipment: Any parts exchanged as part of the Workscope, and related
price adjustments will be governed by Gulfstream's then current parts exchange program. Except as specifically identified
in PART I Workscope, equipment removed as part of the Workscope will become the property of Gulfstream.
PlaneParts©: Except as specifically identified in a PART I Workscope, this Proposal does not take into account any parts
provided at no charge under Gulfstream's PlaneParts© program. To enroll or learn more about the PlaneParts© program
please visit htto://www.gulfstream.com/oroduct-suoport/suoport-services/planeoarts.
D. GENERAL CONTINGENCIES:
Requirement for Customer Furnished Records: This Proposal is based upon the Aircraft being in the configuration,
and containing the equipment, as indicated in Gulfstream CMP records and any records supplied by Customer to support
this Proposal.
This Proposal is also contingent upon the Customer supplying, upon induction or within leadtimes, all avionic, electrical,
system, interior or structural drawings, diagrams, analysis and records, which accurately represent the current condition of
the aircraft ("Customer Records"), as approved by the relevant aviation authority, and which are required by Gulfstream to
conduct the Work.
Any changes which are required to be made by Gulfstream to the Customer Records, or due to the inadequacy of the
Customer Records, in connection with the Work, will be subject to additional charges. These additional charges will be
documented pursuant to the Changes ("WCRs") clause and subject to Customer approval.
Page 9 of 14
This proposal is confidential between Gulfstream and the Customer.
sd'
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083135
I
r
ID # 7018884, ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART II. Contingencies and Assumptions of Proposal Offer (continued)
D. GENERAL CONTINGENCIES: (continued)
General Exceptions: Except as specifically identified in PART I Workscope:
•
Aircraft Preservation: This Proposal does not include any preservation tasks related to the Aircraft, its engines
or systems. Customer is responsible for making certain that all specific preservation tasks related to the Aircraft,
its engines or systems. which are required or may become required while the Aircraft is at Gulfstream's facility for
the Workscope, are identified on the Work Order.
•
Certification Basis: All Work to be accomplished by Gulfstream under the Workscope, assumes the Aircraft is
operated in compliance with FAR Part 91 or the equivalent not-for hire operating rules of the relevant aviation
authority.
•
Non-standard Equipment: Gulfstream is not responsible for vendor to vendor incompatibilities which may be
discovered during the course of the installation.
•
Manuals — Modifications: Changes to the Aircraft's Completion Center Maintenance Handbook (CCMH) or
Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be
requested by the Customer, it may be provided at additional charge. Any changes to the Aircraft's Minimum
Equipment List ("MEL") are the Customer's responsibility and are not included herein.
•
Access, Closure, Removal and Replacement: Access and closure, removal and replacement required to
perform the Workscope are not included as a part of this Proposal.
Touch-Up Paint: For aircraft with standard Gulfstream paint schemes (one (1) base color and two (2) stripes), the sealing
and touch-up (by brush) of panels is included in the Workscope. Aircraft with non-standard paint schemes will be subject
to an additional charge for the additional time required to complete the paint touch-up.
Unused Wiring: Any existing wiring or tubing made obsolete by the Work will be capped and stowed. Wiring or tubing
removal• if requested by the Customer, will be at additional charge.
Termination after acceptance of Proposal: Unless the Customer has specifically directed otherwise, once the Proposal
is signed and returned to Gulfstream, and prior to the Workscope being scheduled in accordance with Section C Pricing
and Scheduling Terms, this Proposal shall be binding upon Gulfstream as to the prices set forth herein. All preliminary
engineering materials and components ordered to support the Workscope, any labor expended, any restock charges
incurred, and any other direct costs supporting the Workscope are chargeable to the Customer if the proposed
Workscope is thereafter canceled by the Customer. If materials or components cannot be returned to their respective
vendor(s), Customer will be billed in full for these items. In such case, the materials and components become the property
of the Customer. If the Work is rescheduled for a later arrival, these charges will be applied to the rescheduled visit, as
appropriate.
Confidentiality: This Proposal and any related documents are strictly confidential between Gulfstream and Customer and
will not, without the prior written consent of the other party, be disclosed by either party, in whole or in part, to any third
party except to such party's accountants, lawyers, and bankers, and Gulfstream's suppliers, provided such third parties
agree to confidentiality as may be necessary for either party to carry out its obligations or enforce its rights pursuant to this
Proposal.
E. ADDENDUM TO PROPOSAL AND WORK AUTHORIZATION TERMS AND CONDITIONS
Page 10 of 14
This proposal is confidential between Gulfstream and the Customer.
SOP,
GAC Rey. February 5, 2015
Return to Table of Contents
EFTA01083136
ID # 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART III. Payment Terms and Remittance Instructions
For Customers with available credit, and except as set forth below, payment terms are net 30 days from date of invoice.
For work estimated to exceed $100.000. Customer agrees to make progress payments on the following schedule: 50% of
the estimated amount prior to commencement of work on the aircraft, and final payment of the remaining 50% 30 days
from date of final invoice. Additional deposits may be required for long-lead or special-purchased parts. which are non-
refundable should the visit be cancelled or work scope change to eliminate those items. If any portion of an invoice is
disputed, the Customer shall nevertheless pay all undisputed amounts per this schedule. Gulf stream shall not be required
to release Customers aircraft to depart if Customers total outstanding balance owed to the Gulfstream parties exceeds
the lesser of $150,000 or Customers available credit limit. All sums past due bear interest at the lessor of 1.5% per
month, or the maximum rate allowable by law, plus reimbursement of attorney fees and other costs of collection. For
Customers without available credit, including those without open credit terms (cash in advance, cash on delivery, etc.),
progress payments will be required as outlined above with remaining outstanding balance payable at departure.
See the Work Authorization terms and conditions for further details on payment terms.
If Applicable, Aircraft Records and Condition Survey ("ARCS"). ARCS fees are payable in advance of the inspection
being performed. Acceptable methods of payment related to ARCS and supporting aircraft sales transactions include
payment via wire transfer/ACH, certified check and Gulfstream accepted credit card. Costs incurred in remediation of
discrepancies documented during the ARCS or required in conjunction with the supporting aircraft sales transaction are
immediately due upon completion of the ARCS and prior to the departure of the aircraft. This section applies to all
customers, including those who have available credit.
Remittance can be made to the following:
Checks:
Gulfstream Aerospace Corporation
(Overnight) Gulfstream Aerospace Corporation (Box #730349)
P.O. Box 730349
c/o JP Morgan Chase Bank, NA
Dallas, TX 75373-0349
Attn: Dallas National Wholesale Lockbox TX1-0029
14800 Frye Road
Ft. Worth, TX 76155
Wire Transfer
Gulfstream Aerospace Corporation
Instructions:
JP Morgan Chase Bank, NA
1 Bank One Plaza
Chicago, IL 60670
Account No. 10-15825
Reference your Five (5) Digit Customer Number (XX-XXX)
Bank
Fedwire Routing No. (ABA)
Identifiers:
S.W.I.F.T CHASUS33
ACH Credit Routing No. (ABA
Note: Please reference the Quote ID Number and one of the following (as applicable):
•
Invoice Number
•
Sales Order Number
•
Job or Work Order Number
•
Aircraft Serial or Registration Number
•
Customer Account Number
Page 11 of 14
This proposal is confidential between Gulfstream and the Customer.
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083137
ID ft 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART IV. Executive Summary and Proposal Acceptance
Please select items in Accept/Decline columns. Once an item is accepted, the amount will auto populate the total. (Please
note that quoted dollars and downtime may vary based on concurrent work with accepted/declined items.)
A. INTERIOR REFURBISHMENT
B. AVIONICS CABIN ELECTRONICS
C. MECHANICAL
(USD)
Accept
(select one)
1.
Aircraft Records and Condition Survey
II
Lite Package - Aircraft Records and Condition Survey (ARCS)
$27.000
i 1.2
Basic Package - Aircraft Records and Condition Survey (ARCS)
$47,500
Standard Package - Aircraft Records and Condition Survey (ARCS)
$75,500
Premium Package - Aircraft Records and Condition Survey (ARCS)
$98,000
D. PAINT
QUOTED WORKSCOPE TOTAL BASED ON CUSTOMER ACCEPTED ITEMS
'Default value is set to SO until Customer selections have been made above.
Page 12 of 14
This proposal is confidential between Gulfstream and the Customer.
seh
Return to Table of Contents
GAC Rev. February 5.2015
EFTA01083138
I ;411sliraiii ( IA
ID * 7018884, ROO
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART IV. Executive Summary and Proposal Acceptance (continued)
Schedule Planning
Estimated Days
Leadtime
Downtime
5 Calendar Days
(For definition, see Part II Section A or click here
10-12 Working Days
(For definition, see Part II Section B or r kh-r-
Ritote Validity
' Pricing contained in this proposal is valid for 90 days from the date of this proposal.
For further details/definition, see Part II Section C or click here)
The Aircraft Records and Condition Survey is limited in scope, and Gulfstream cannot guarantee that this Survey will
uncover all problems that exist with the inspected aircraft. Ultimately, the buyer must rely on their own judgment as to
the aircraft value and the sellers warranty, if any, as to the aircraft's condition.
For budgetary planning purposes, estimated material for the Aircraft Records and Condition Survey CMP packages
(Items 1.2 through 1.4) is approximately $7,000, and it does not include material required for clearing of any
discrepancies.
Page 13 of 14
This proposal is confidential between Gulfstream and the Customer.
soh
Return to Table of Contents
CAC Rev. February 5. 2015
EFTA01083139
t i 'Al 1 1 ( - i\
ID # 7018884, R00
12 lune 2015
Gulfstream GV Serial Number 572
South Aviation, Inc.
PART IV. Executive Summary and Proposal Acceptance (continued)
Upon acceptance of this Proposal, the prices and quotes stated herein (subject to all contingencies or other stated
assumptions) constitute a formal Fixed Price Quote, which is included in Gulfstream's standard Work Authorization
Agreement Terms and Conditions. Your acceptance of all or any portion of this Proposal confirms your acknowledgement
that you have read and express agreement to be bound by these terms.
This Proposal expressly incorporates by reference and is subject to Gulfstream's standard Work Authorization Agreement
Terms and Conditions which are attached hereto as ATTACHMENT A. The Work Authorization. which will include a Work
Order which details all items of Work to be accomplished during the service visit, including those items selected and
documented by Customer from this Proposal, will constitute the agreement between the parties and will supersede this
Proposal when executed by both parties. The Work Authorization will be signed at the Aircraft's induction into the agreed
Gulfstream Service Center.
IN WITNESS WHEREOF, the parties have caused this Proposal to be executed by their duly authorized representatives.
Copies of a fully executed agreement. emailed between the parties will be effective as an original signed agreement.
SOUTH AVIATION, INC.
GULFSTREAM AEROSPACE CORPORATION
("Customer-)
("Gulfstream")
By:
By:
Name:
Name: Tom Baliya
Title:
Title:
Regional Sales Manager, Product Support Sales
12 June 2015
Please complete and return all pages of PART IV via fax (+1
or email ([email protected]).
Page 14 of 14
This proposal is confidential between Gulfstream and the Customer.
seh
Return to Table of Contents
GAC Rey. February 5, 2015
EFTA01083140
ATTACHMENT A
WORK AUTHORIZATION AGREEMENT TERMS AND CONDITIONS
1. AGREEMENT. This Work Authorization Agreement, including documents incorporated by reference, (the
"Agreement") identifies the services and materials (the "Work") to be provided by Gulfstream, its employees,
agents, representatives, and contractors, (collectively "Gulfstream") to the aircraft identified on the first page of this
Agreement (the "Aircraft") plus the associated tenns and conditions of the Agreement. "Customer" means
collectively the customer identified on the first page hereof, and all owners, operators, lessors, lessees and insurers
of the Aircraft. "Gulfstream Parties" means Gulfstream, General Dynamics Corporation and their affiliates,
including the Jet Aviation companies ("Jet Aviation") and all such entities' employees, agents, representatives and
contractors. This Agreement is the parties' entire agreement concerning the Work and replaces prior verbal or
written agreements with respect thereto. This Agreement's terms and conditions (but excluding changes in the
scope of the Work and overtime authorizations) may not be altered except by a writing that expressly references this
Agreement and is signed by authorized representatives of both parties.
2. WORK CHANGES. Customer authorizes Gulfstream to expend labor and materials reasonably appropriate to
the mutually agreed Work. Work changes (including requests for overtime) require mutual agreement of the parties.
Customer's oral changes increasing the scope of the Work or approving overtime are binding (unless otherwise
provided by law). Customer payment of the invoice for any additional Work item is customer acknowledgement
that the additional item was mutually agreed upon as part of the Work.
3. PRICING. Except as otherwise specifically agreed between the parties in writing, all Work (including
engineering services) performed under this Agreement is on a TIME AND MATERIALS BASIS unless expressly
subject to a formal fixed•price quote signed by both Gulfstream and Customer. ESTIMATES OF EXPECTED
HOURS/MATERIAL COSTS ARE NOT QUOTES AND ARE BILLED SOLELY ON A TIME AND
MATERIALS BASIS. For time and materials Work: (a) labor (including engineering services) is billed according
to the rates set forth in the Gulfstream Aircraft Services Rate Letter in effect as of the date the Work is performed;
and (b) materials are billed according to Gulfstream's standard prices in effect on the date the material is used. Any
incremental charge under Gulfstream's Component Exchanged Program will be billed by supplementary invoice.
4. PAYMENT TERMS. For customers with available credit and except as set forth below, payment terms are net
30 days from date of invoice. For Work estimated to exceed $100,000, Customer agrees to make progress payments
on the following schedule: 50% of the estimated amount prior to commencement of Work on the Aircraft, and final
payment of the remaining 50% 30 days from date of final invoice. Additional deposits may be required for long-lead
or special purchased parts, which are not refundable should the visit be cancelled or work scope changed to
eliminate those items. If any portion of an invoice is disputed, then Customer shall nevertheless pay all undisputed
amounts per this schedule. Gulfstream shall not be required to release Customer's Aircraft to depart if Customer's
total outstanding balance owed to the Gulfstream Parties exceeds the lesser of $150,000.00 or Customer's available
credit limit. All sums past due bear interest at the lesser of 1.5% per month, or the maximum rate allowable by law,
plus reimbursement for attorney fees and other costs of collection. For customers without available credit, including
those without open credit terms (Cash in Advance, Cash on Delivery, etc.), progress payments will be required as
outlined above with remaining outstanding balance payable at departure.
5. TAXES. Customer is responsible for all Federal, State, local and foreign taxes, levies, penalties and tariffs
applicable to the Work performed hereunder, the materials used or transportation (other than taxes on income of
Gulfstream) and Customer shall indemnify and hold Gulfstream harmless with respect thereto.
6. WARRANTY.
6.1 GENERAL Gulfstream warrants that the Work conforms to the pertinent specifications prescribed by the
applicable aircraft/component manufacturer, and that any components or other items supplied hereunder (but
excluding Customer•furnished items) are free from defects in material and workmanship. This warranty extends to
defects discovered within twelve (12) months, or one thousand (1,000) flight hours, whichever comes first, after
completion of the Work; except that the warranty period for any Work performed as warranty work is equal to the
pre-existing unexpired warranty period. Parts qualifying for the "Exclusive Gulfstream Parts Warranty Extension"
Program, or other extended published Gulfstream warranty programs, if any, are entitled to an extended warranty
period pursuant to the terms of such Programs as they exist on the date this Agreement is executed. To the extent
that any Work is being performed as warranty work under a service center warranty originally extended by a
Gulfstream Party to a prior owner or operator of the Aircraft, then this Agreement shall constitute an assignment of
such original warranty to Customer except that the terms and conditions thereof shall be those in this Agreement
(including Sections 7, 8 and all other disclaimers and limitations in this Agreement)..
GAC Rev. Jan. 1.2014
1 of 4
EFTA01083141
6.2 REMEDY. Gulfstream's sole obligation for breach of warranty for Work other than inspection activities, and
Customer's sole remedy, is limited to the repair, replacement or correction (at Gulfstream's reasonable discretion) of
the defective Work. All parts and labor required for disassembly, removal, installation and reassembly of the
defective item are Gulfstream's expense, but only if the Work is performed at a Gulfstream or Jet Aviation facility
authorized to work on the applicable aircraft model. Gulfstream is not responsible for any costs or expenses
associated with transporting the Aircraft or warranted items to any repair facility. Gulfstream's sole obligation for
negligent or otherwise defective inspection activities, including any damage to an Aircraft that results from any
alleged negligent inspection, and Customer's sole remedy, is limited to refund of any payments made by Customer
for that portion of such inspection that was defective.
63
ADDITIONAL REMEDY FOR COLLATERAL AIRCRAFT DAMAGE.
6.3.1
In addition to the warranty remedy provided in Section 6.2, but subject to Section 6.3.2 below, if any
defective Work, or negligence or willful misconduct of a Gulfstream Party related to performance of this Agreement
causes damage to the Aircraft within the warranty period set out in Section 6A, then as Customer's sole remedy
Gulfstream will repair at no charge (as further described below) any such Aircraft damage that is directly and
immediately caused by a Gulfstream Party. Such repairs will be accomplished at a Gulfstream or Jet Aviation
facility authorized to work on the aircraft model, and on the same terms and conditions hereof (excluding payment
obligations) using methods selected by Gulfstream in its reasonable discretion; provided, however, if Gulfstream
reasonably deems the Aircraft to be damaged beyond economical repair, then the sole remedy is for Gulfstream to
pay Customer the Aircraft's pm•damage fair market value and for Gulfstream to receive clear title thereto.
6.3.2
Notwithstanding anything else in this Agreement, Gulfstream's remedy obligations under this Agreement
shall not include Aircraft damage that either (a) allegedly is caused by a negligent inspection where the damage
occurs after completion of the Work or (b) is caused by a Flight Operations Accident (as defined below) even if such
accident is allegedly caused by a Gulfstream Party (including negligence of a Gulfstream employed flight crew
member on the Aircraft). "Flight Operations Accident" means an accident or incident occurring between ramp
movement for flight through takeoff, flight, landing, taxi and parking in which the Aircraft suffers damage from
contact with the earth or other objects.
6.4 TERMINATION OF WARRANTY. The warranties and Gulfstream's obligations for the repair of Aircraft
Damage set forth above in Section 6 are void if either the Aircraft or warranted item have been subjected to
maintenance, overhaul, installation, storage, operation, or use which is improper or not in accordance with the
aircraft/component manufacturer's instructions (including failure to comply with approved operating and
maintenance manuals, instructions or bulletins, or customary maintenance or airmanship practices), or to any
accident or casualty that proximately causes or contributes to the failure or substandard performance of the
warranted item or further damage to the Aircraft.
6.5 CUSTOMER'S OBLIGATIONS. Gulfstream's warranty obligations hereunder are expressly conditioned upon
compliance with all of the following: Customer must provide Gulfstream with written notice within 60 days after the
defect becomes apparent; Customer must return or otherwise dispose of the item at issue as directed by Gulfstream
within 30 days after receipt of Gulfstream's instructions; and Customer shall maintain and make available to
Gulfstream all records (including FDR, CVR and other aircraft recorded data) reasonably related to the maintenance,
use and condition of the item at issue.
7. DISCLAIMERS. THE EXPRESS WARRANTIES IN SECTION 6 OF THIS AGREEMENT ARE
EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES (EXCEPT FOR THE WARRANTY OF TITLE)
AND REPRESENTATIONS, EXPRESS, IMPLIED, OR STATUTORY, INCLUDING WITHOUT LIMITATION
IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS (INCLUDING FITNESS FOR A
PARTICULAR PURPOSE) (COLLECTIVELY "EXCLUDED WARRANTIES"). Except as expressly set forth in
this Agreement, Customer, on behalf of itself and all owners, operators. lessors, lessees, and insurers of the Aircraft,
hereby waives and releases all rights, claims, and remedies (through subrogation or otherwise) with respect to any
and all Excluded Warranties, duties, obligations, and liabilities in tort or contract arising by law or otherwise from
this Agreement or the Work, including: (1) liability for a Gulfstream Party's own negligence or (2) strict liability or
product liability. For the avoidance of doubt, this Section 7 does not modify the rights and obligations of
Gulfstream and Customer (or owner of Aircraft if different from Customer), as expressly stated in any Gulfstream
Aircraft Warranty Agreement between the parties.
8. EXCLUSION OF ALL OTHER DAMAGES.
Notwithstanding anything else in this Agreement, the
Gulfstrcam Parties shall not be liable for punitive, special. incidental or consequential damages that arise from or
relate in any way to this Agreement, or the Aircraft's presence at a Gulfstream Party's facility as a result of this
GAC Rev. Jan. 1.2014
2 of 4
EFTA01083142
Agreement, whether arising out of contract, warranty, tort or by statute or otherwise. Such excluded damages
include damages for loss of use, loss of time, inconvenience, diminution in value or commercial loss. THE
EXCLUSION OF SUCH DAMAGES AS SET FORTH HEREIN SHALL APPLY NOTWITHSTANDING
ANY OTHER PROVISION OF THIS AGREEMENT, SHALL BE DEEMED INDEPENDENT OF ALL
WARRANTIES, AND OTHER PROVISIONS OF THIS AGREEMENT, AND SHALL SURVIVE ANY
FAILURE OF THE ESSENTIAL PURPOSE OF ANY WARRANTY OR LIMITED REMEDY UNDER
THE TERMS OF THIS AGREEMENT.
9. LIABILITY TO THIRD PARTIES. The limitations of liability in these terms and conditions will not be
interpreted to affect in any way a Gulfstream Party's obligations, if any, for third party personal injury, wrongful
death or property damage to other than the Aircraft or its contents.
10. NO BAILMENT. No bailment is created by this Agreement, and Gulfstream shall not act as insurer of the
Aircraft while the Aircraft is present at Gulfstream's facility or otherwise in Gulfstream's custody or control
11. NO DELAY PENALTY. Gulfstream will use reasonable efforts to complete the Work in a timely manner.
Reasonable efforts does not include overtime unless the Customer agrees to bear overtime charges. Notwithstanding
such obligation, Gulfstream shall not under any circumstances be liable for damages, late delivery penalty, fee or the
like should it fail to perform the Work within any period of time specified by the Parties.
12. ACCEPTANCE OF DELIVERY. Gulfstream will tender the Aircraft to Customer for delivery at the facility
where the Work was performed, unless otherwise agreed in writing. Customer shall promptly inspect the Work, and,
upon correction or customer approved deferral of any discrepancies in such Work, Customer shall accept the
Aircraft.
13. TITLE. Title to all materials installed in the Aircraft under this Agreement does not pass until acceptance of the
Work by Customer, through delivery of the Aircraft or as otherwise mutually agreed in writing.
14. EXCESS STORAGE CHARGE. Unless otherwise agreed between the parties in writing, should Customer's
Aircraft remain at Gulfstream's facility following completion of the Work for more than five (5) days, for whatever
reason (including a failure to pay for the Work performed), Gulfstream is authorized by Customer to charge the
prevailing rate for day storage of aircraft as then charged by Fixed Base Operators for aircraft of similar size on the
airport where the Aircraft is stored (but not less than $200.00 per day). Unless otherwise expressly agreed in writing
as part of this Agreement, Gulfstream is under no obligation to provide any maintenance services whatsoever to the
Aircraft while being stored under this provision and any dilapidation of the Aircraft during such storage period shall
be Customer's sole responsibility.
15. SAFETY AND SECURITY. Customer's employees, agents, subcontractors and representatives shall abide by
all applicable Gulfstream policies, procedures and safety protocols when present on Gulfstream's premises.
16. INDEMNITY BY CUSTOMER ENTERING GULFSTREAM'S PREMISES FOR PERSONAL INJURY
AND DAMAGE TO OTHER PROPERTY. Customer assumes the risk of and agrees to indemnify and hold
harmless the Gulfstream Parties from and against any and all liability, damage, loss, cost and expense, including
attorney's fees, on account of any claim, suit or action made or brought against a Gulfstream Party (including claims
brought against a Gulfstream Party because of a Gulfstream Party's own negligence) for the death of or injury to
employees, agents, representatives and subcontractors of Customer, or damage or destruction of property of
Customer, its employees, agents, representatives or subcontractors, (other than damage or destruction of the Aircraft
upon which Work is performed, which is addressed elsewhere under this Agreement) sustained arising from or
related to Customer's presence on the Gulfstream Party's facilities (including its hangars and ramps but excluding a
Gulfstream Party's customer lobby and customer briefing rooms) during the course of the Agreement, except for the
willful misconduct of a Gulfstream Party or its employees acting within the scope of their employment.
17. ARBITRATION. Any controversy or claim arising out of either this Agreement or Customer's service visit to
Gulfstream shall be governed by the laws of the State of Georgia, without regard for rules concerning conflicts of
law, and settled by one (1) arbitrator (except if the claim is in excess of $2 Million, then by three (3) neutral
arbitrators) under the Commercial Arbitration Rules of the American Arbitration Association ("AAA") in the City
where the work hereunder was performed If the arbitration proceedings shall be conducted before a panel of three
neutral arbitrators, the panel shall be selected using the following process: Within 15 days after the commencement
of arbitration, each party shall select one person meeting the specified qualifications to act as neutral arbitrator, and
GAC Rev. Jan. 1.2014
3 of 4
EFTA01083143
the two thus selected shall select a third neutral arbitrator meeting the specified qualifications within IS days of their
appointment to act as the chair of the arbitration panel. If the arbitrators selected by the parties are unable to or fail
to agree upon the third arbitrator, the third arbitrator shall be selected by the American Arbitration Association. In
an arbitration with a single arbitrator, the parties shall use their best efforts to agree upon an arbitrator(s) within
thirty (30) days after service of the claim, and if agreement is not reached by such date then either party may request
the AAA to appoint an arbitrator(s) in accordance with its rules. The U.N. Convention on Contracts for the
International Sale of Goods (frequently referred to as the "UNCISG") shall not apply.
18. MISCELLANEOUS. If any provision of this Agreement is held invalid under applicable law, such provision
will be ineffective only to the extent of such invalidity without invalidating the remainder of this Agreement. If there
is any conflict between these terms and conditions hereof and any document incorporated herein by reference, then
these terms and conditions shall control unless such document expressly states the contrary. The words "include,"
"including" and variations thereof are not terms of limitation and shall be deemed followed by "without limitation."
Exports or re-exports of commodities, technology and software provided as part of the Work are subject to the U.S.
Export Administration Regulations and diversion contrary to U.S. law is prohibited. Customer shall comply with all
applicable U.S. export laws and regulations.
19. AUTHORIZATION OF AIRCRAFT OWNER/LESSOR/LESSEE. The person signing this Agreement on
behalf of Customer represents, warrants and affirms that he is an AUTHORIZED AGENT OF THE AIRCRAFT
OWNER(S), and, if applicable, lessor(s) and/or lessee(s) with full authority to enter into this Agreement and bind
such owner(s), lessor(s), or lessee(s), with respect to all Work contemplated herein and on behalf of himself and his
employer agrees to indemnify Gulfstream for all losses arising from any breach of this representation and warranty.
Customer Acknowledgement:
GAC Rev. Jan. I. 2014
4of4
EFTA01083144
IDs
7018884.800
Tiered Package • Aircraft Records and Condition Survey
MIMagrarglift
Related Code
Code Description
Included in
Material
Estimate
Lite Package • Aircraft Records and Condition Survey (Exhibit 1)
Check Airworthiness Directives
Check Customer Bulletins
Perform Avionics Inventory
Review Aircraft Status and Records
Cockpit ;Cabin .' Baggage Comport. Above Floor General visual inspection
Avionics • Functional Ramp Test (Inspection
291401
Main Hydraulic System Manifold Differential Pressure Indicator (Left) • Detailed Inspection
291402
Right System Manifold Differential Pressure Indicator • Detailed Inspection
292501
Auxiliary Hydraulic Pump Manifold Differential Pressure Indicator - Detailed Inspection
292502
Power Transfer Unit Manifold Differential Pressure Indicator • Detailed Inspeclion
316206
Configuration Warning Message: Han - Operational Test
321803
Main Landing Gear and Doors (Left) • Zonal Inspection
321804
Main Landing Gear and Doors (Right) • Zonal Inspection
322802
Nose Landing Gear and Doers • Zonal Inspection
324305
Brake Weer Indicator (Left Outboard) • Detailed Inspection
324308
Brake Weer Indicator (Left Inboard) • Detailed Inspection
324307
Brake Weer Indicator (RigN Inboard) • Detailed Inspection
324308
Brake Wear indicator (RigN Outboard) • Detailed Inspection
490001
Auxiliary Power Unit • Functional Test
491005
APO Enclosure FS 767- FS 797 • Zonal Inspection
496001
APU Exhaust Wet -General Visual Inspection
531010
Redone FS .4 thru FS 63 • Zonal Inspection
530205
Birdthike Plate (Leh) • Removal i InsIallation
530206
Birdstrike Plate (Right) • Removal i Installation
531015
Nose Gear Wheel Well FS 40 • FS 119 • Zonal Inspection
531045
Main Gear Wheel Wells FS 576 • FS 632 (Celt) • Zonal Inspection
531046
Main Gear Wheel Wells FS 576 • FS 632 (Right) • Zonal Inspection
531047
Main Gear Wheel Wells FS 576 • FS 632 (Cove Panel Drain Holes) • (Enhanced) Zonal Inspection
531048
Main Gear Wheel Wells FS 576 • FS 632 (Wiring Harness) • (Enhanced) Zonal inspection
531068
External Fuselage • General Visual inspection
531080
Left Electronic Equipment Rack FS 165 • FS 189 • Zonal Inspection
531081
Right Electronic Equipment Rack FS 147 • FS 181 • Zonal Inspection
531095
Alt Fuselage Move Floor FS 758 • FS 974 • Zonal Inspection
541005
Pylons External (Left) • Zonal Inspection
541008
Pylons External (Right) - Zonal Inspection
551003
Horizontal Stabilizer General Skins • General Visual Inspection
553040
Vertical Stabilizer • General Visual Inspection
570005
Wing Upper Surface View from on Wing (Left) • Zonal Inspection
570006
Wing Upper Surface View from on Wing (Right) • Zonal Inspection
570009
Wing Lower Surface (Left) - Zonal Inspection
570010
Wing Lower Surface (Rant)• Zonal Inspection
570013
Upper Wing Extension BL 642 • BL 545 (View from en Wing) (left) • Zonal inspection
570014
Upper Wing Extension BL 542 • BI- 545 (View from on Wing) (Right) • Zonal inspection
570015
Lower Wing Extension BL 542 • BL 545 (View from Ground) (Left) • Zonal inspection
570016
Lower Wino Extension BL 542 • BL 545 (View from Ground) (Right)• Zonal Inspeclion
574015
Wing Leading Edge External BL 44.0 • BL 529 Inboard of Navigation Light (Celt) • Zonal Inspection
574016
Wing Leading Edge External BL 44.0- BL 529 Inboard of Navigation Light (Right) • Zonal Inspection
575001
Wing Trailing Edge (Left) • Zonal inspection
575002
Wing Trailing Edge (Right) - Zonal Inspection
575003
Wing Rear Beam (Left) - Zonal Inspection
575004
Wing Rear Beam (Right) • Zonal Inspection
711316
Poweeplant and Needle Doors Internal (Left) - Zonal Inspection
711316
Powerplant and Needle Doors Internal (Right) • Zonal Inspection
717007
LH Engine Drains System • Detailed Inspection
717008
RH Engine Drains System • Detailed Inspection
Basle Pack
• Aircraft Records and Condition Surve Exhibit
Basic Package is Exhibit 1 Codes plus the following codes:
GV Preflight inspection Checklist IRSOCT • 113 Rev. 23)
492301
Mil Compressor and Turbine Section • Boresco e Inspection
492102
APU Branched Wring Herne::: - Inspection
494206
Igniter Aug Mfg • Removal: Installation
X
494207
Igniter Plug (Right) - Removal /Installation
X
494208
APU Igniter Plug (Leg) - Inspection f Check
494209
APU Igniter Plug (Right) - Inspection/ Check
496102
EGT Sensor No. I (58 FtE220-49.75591 - Removal , Iretallalon
497005
APU Exhaust Gas and Tervoeralwe Sensor - Removal .' Installation
710025
LH Engine Test 0 • Engine Power Assurance Check
710011
LH Engine Rim • PreOperational Checks
710013
LH Engine Riot • Checklist
710028
RH Engine Test 4 • Engine Power Assurance Check
710012
RH Engine Run - Pre-Op:rational Checks
710014
RH Engine Run - Cheddisl
710029
LH Engine Test 6 • Vibration Survey
710030
RH Engine Test 6 • Vibration Survey
723101
LII Lowdresswe Compressor (Fan) Blades • Detailed Inspection
723102
RH Low-pressure Compressor (Fan) Blades • Detailed Inspection
724005
LII HP Turbine Stage 1 Rotor Blades • Baroscope
726006
RH HP Turbine Stage 1 Rotor Blades • Borescepe
724007
L/1 High-pressure Turbine Neale Guide Vanes • Special Detailed inspection
742001
LH Engine banter Plug (No. 1) • Removal ! Installation
742036
LH Engine enter Plug (No. I) • Inspection i Check
742023
LH Ignition Syslern - Operational Check
Page 1 or 6
EFTA01083145
Es
7018884.800
Tiered Package - Aircraft Records and Condition Survey
higggillikritalliga
Related Ciltht
Pncln Dtmorioll001
Included in
Material
Estimate
742003
LH Engine Igniter Plug (No. 2) . Removal / Installation
742007
LH Engine Igniter Plug (No. 2) . InsFection :Check
724006
RH High-pressure Turbine Houle Guide Vanes • Special Detailed Inspection
742002
RH Engine Igniter Plug (No. I1- Removal .' IrMallaben
742006
RH Engine Igniter Plug No. II - Inspection / Check
742024
RH Ignitkin Syslem • Operational Check
742004
RH Engine Igniter Plug (No. 2) - Removal! Installation
742008
RH Engine Igniter Plug INo. 21- Inspection! Check
724009
LH Combustion Liner • Special Detailed Inspection
724010
RH Combustion Liner • Special Detailed Inspection
731023
LH Low-pressure Fuel Finer • Detailed Inspection
731027
LH Low.presstre Fuel Filler • Removal / Installation
X
710015
LH Engine Tesl I - Wet Moll Operation Leak Chedt
731024
RH Low-pressure Fuel Filter • Detailed Inspeclion
731028
RH Lew ressure Fuel Filler • Removal! Installation
X
710016
RH Engine Tesl 1 • Wel MotOr Operation Leak Check
790011
LH
Me and Accessory Gearbox
node C
Detectors • Detailed In
lion
X
710017
LH Engine Rim Leak Check Test 2A • LP Fuel Syslem! Oil System
790015
LH Engine Fwd Bearing Chamber Magnetic Chip Detector . Removal / Installation
790017
LH Engine All Bearing Chamber Magnetic Chp Deteclor • Removal! Installation
790019
LH Engine Accessory Gear Box Magnelic Chip Detector • Removal lInsIallation
790012
RH Engine and Accessory Gearbox Magnetk Chip Detectors • Detailed Inspection
X
710018
RH Engine Run Leak Check Test 2A - LP Fuel System/ Oil System
790016
RH Engine Fwd Bearing Chanter Magneto Chip DCICAOr . Removal i Installation
790018
RH Engine AR Bearing Chamber Magnetic Chip Detector - Removal / Installation
790020
RH Engine Accessory Gear Box Magnetic Cap DeCdor - Removal / Inslalalion
792101
LH Oil Pressure Filter • Detailed Insoettlen / Discard
792105
LH Oil System Pressure Filler Element • Removal; Inslallation
X
792102
RH Oil Pressure Alter • Detailed Inspection! Discard
792106
RH Oil System Pressure Plot Element . Removal: Ireallaion
X
Standard Package • Aircraft Records and Gandhian Survey (Exhibil 3)
Standard package is Exhibit 1 and Exhibit 2 Codes plus the following cedes:
321003
Main Landing Gear ComponeMs (Leg) • Detailed Corrosion Inspection
X
121500
Hydraulic System Reservoir ILO) • Servicing
121501
Hydraulic Syslem Reservoir (Righti • Servicing
290001
Hydraulic System Reeding Procedure
290002
Hydraulic System Reed Procedure • Alletmle
321005
Men Landing Gear (Lehi - Lubricalion
321027
Men Gear Trunnion Pin (Len Fernald) • Removal/ Inslalalion
321029
Men Gear Trunnion Pin (Len AM - Removal! Installation
321201
Men Landing Gear Shock Absorber (Left) • Servicing
321217
Men Landing Gear Shock Absorber (Lefil • Removal / Installation
321228
Men Landing Gear Axie Filling Airmen Pin (Left) Corrosion Inhibiting Corncound Application
321235
Men Landing Gear Me Filling and Me Filling Nut (Lek) Corrosion Inhibiting Convourrd Application
321239
Man Landing Gear Shock Absorber Upper and Lower Mach Fins (Left) Corrosion Inhbiling Compered Application
321243
Man Landing Gear Sidebrace Actuator Mach Pins/ Trunnion Area (Led Corrosion Inhibiting Compound Application
321247
Man Landing Gear Uplock Roller Refll Corrosion Inhibiting Cron-pound Application
321251
Man Landing Gear Striker Ann (Lef) Corrosion Irbil:ding Compound Applicaton
321301
Man Landing Gear Me Filling (Leg - Removal! Installation
323006
Lancing Gear Emergency Extension Nitrogen Slowdown Bottle - Servicing
323015
Man Landing Gear Spindle Pin (Lein - Removal! Installation
323021
Men Landing Gear Sidebrace Reg) - Removal / Installation
323900
Landng Gear • Functional Tesl
323901
Landng Gear Emergency Eden ion Operational Tesl
323906
Landng Gear Cycling - Operational Tesl
324003
Men Wheel Assembly (Left Outeoard) - Removal/Installation
324004
Men Wheel Assembly (Left Inboard) - Removal! Inslaltalion
324009
Man Landing Gem Wheel Bearing (LSI Oulboardl • Inspecion / Check
324010
Man Landing Gem Wheel Bearing (Leg Intoardi - Inspection / Check
324017
Wheel and Brakes - Functional Teal
324101
Man Wheel Brake (Leh) - Blaming Procedures
324105
Brake Assembly (Left Outboard): Removal / Installation
324106
Brake Assembly (Left Inboard) . Removal/ Inslalalion
324110
Brake Syslem Temperature Sensor (Lell Outboard) - Removal / Inalallalion
324111
Brake Syslem Ternperakee Sensor (Lell Inboard( • Removal / InstallMien
324124
Parking ;Emergency Brake AC0.111"413,01. Servicing
324144
Man Landing Gear Brake Assembly (Len Outboard) . Detailed Inspection
324145
Men Landing Gear Brake Assembly (Len Inboard) - Deleted Inspection
324153
Brake Rotor Drive Clip (Lell Outboard) - Inspection
324154
Brake Rotor Drive Clip (Lell Inboard! • Inspection
324202
Anbskid - Asclional Teal
324221
Wheel Speed Transact, (Left Outmatch - Removal / Installation
324222
Wheel Speed Transact, (Left Inboard) - Removal/ Inslalatial
321004
Main Landing Gear Componerris (Right) • Defined Corrosion Inspection
X
321006
Man Landing Gear (Right) • Lubricabon
321028
Man Gear Trunnion Pin (Right Forward) - Removal! Installation
32103D
Man Gear Trunnion Pin (Right Afl) - Removal! Installation
_321202
Man Landing Gear Shock. Absorber ggighl) • Servicing
321218
Man Landing Gear Shock Absorber (Right) • Removal I InsIaltalion
321232
Man Landing Gear Me Fitting Airmen Pin (Right) Corrosion Inhibring Confound Application
321236
Man Larding Gear Me Filling and Me Filling Nut (Flight) Corrosion Inhibiting Compound Application
321240
Men Landing Gear Shock Absorber Upper and Lower Alla,' Fins (RigMl Corrosion Inhibiting Compound Application
321244
Man Landing Gear Sidebrace Actuator Mach Pins/ Trunnion Area (Righl) Corrosion Inhibiting Confound AppIcation
321249
Man Landing Gear Uplock Roller (Right) Corrosion Inhibiling Cm/pound Appicalice
Page 2 of
EFTA01083146
CM
7018884.R00
Tiered Package - Aircraft Records and Condition Survey
MIggialifidatt
Related Cede
r'4 newidllei
Included in
Material
Estimate
321252
Man Landing Gear Striker Mn (Right) Corrosion Inhibiting Conpourd Application
321302
Man Landing Gear Axle Filling (Right) - Removal / Inslallation
323016
Man Landing Gear Spindle Pin (Right) - Removal / installation
323022
Man Landing Gear Sidebrace (Right) - Removal I Installation
324005
Man Wheel Assembly (Righl inboard] - Removal! Installation
324006
Man Wheel Assembly (Rionl Outboard). Removal! Installation
324011
Man Landing Gear Wheel Bearing (Right Inboard)- inspection /Check
324012
Man Larding Gear Wheel Bearing (Right Outboard) • Inspection /Check
324102
Man Wheel Brake (Rohn . Bleeding Proceolues
324107
Brake Assembly (Right Inboard] - Removal 1 Installation
324108
Brake Assembly (Right Outboard] • Removal I Installation
324112
Brake System Temperature Sensor (Right Inboard) • Removal I insIaltalion
324113
Brake System Temperature Sensor (Right Cu:board) - Removal / Installation
324146
Man Landing Gear Brake Assembly (Right Inboard) • Detailed Inspection
324147
Man Landing Gear Brake Assembly (Right Outboard] - Detailed Inspection
324155
Brake Baler Drive pip (Right Inboard) - Inspection
324156
Brake Rotor Drive Clip (Right OulboarM - Inspection
324223
Wheel Speed Transdocer (Right Inboard! - Removal! Installation
324224
Wheel Speed Transdocer (Rids Outboard) • Removal !Installation
122003
Nose landing Gear Components • Detailed Corrosion Inspection
X
321255
Nose Landng Gear Shock SDul and Axle Assembly Corrosion Initialing Compound Application
321256
Nose Landng Gear Trunnian Assembly Corrosion Inhibiting Compound Application
321259
Nose Landng Gear Truss Brace Assembly Corrosion InNbiling Compound Application
321260
Nose Landng Gear Upper Tnomion Attach Pins Corrosion Inhibiting Compound Application
321263
Nose Landng Gear Upper Crag Brace Attach Pin Corrosion Inhibiting Compound Application
321264
Nose LandngGear Striker Arms Corrosion inhibting Compound Application
322004
Nose Lancing Gear - Lubrication
322202
Nose Landng Gear Shock SUM - Servicing
324001
Nose Wheel Assembly (Leh) - Removal / installation
324002
Nose Wheel Assembly (Right) • Removal/Installation
324007
Nose Wheel Bearings (Lell) • inspection / Pack
324008
Nose Wheel Bearingsiliht . insoecbon I Pack
325003
Steering - Functional Test
Premium Package - Aircraft Records and Condition Survey (Exhibit 4)
Premium Package is Exhibit 1. Exhibit 2 and Exhibit 3 Codes plus the following codes:
1A! 500 Hour Inspection Codes
121400
LH Air Tate* Starter Oil • Change
X
121401
RH Air Turbine Starter Oil • Change
X
212511
Display Unit Fan Filbert • Inspection
316021
DU No. 1 • Removal: IrMallVion
316022
DU Ne. 2 - Removal! Installation
316023
DU No. 3 - Removal I Installation
316024
DU Ne. 4 • Removal I Instant/ion
316025
DU Ne. 5 • Removal I Instant/ion
316026
DU No. 8. Removal: Installation
215227
Primary I Secondary Heal Exchanger (Left)- Detailed Inspeclian
215228
Primary / Secondary Heal Exchanger (Right) • Detailed Inspection
242111
Integrated Drive Generator (Left) - Detailed Inspection
242109
Integrated Drive Generator (Leff] . Oil Level Check
242141
Integrated Drive Generator Oil Scavenger Filter Dillerenbal Pressure Imitator (Left) • Inspection
242112
Integrated Drive Generator (Right) • Detailed Inspection
242110
Integrated Drive Generator !Right) • Oil Level Check
242142
Integrated Drive Generator Oil Scavenger Filter Dillerenbal Pressure InciCaler (Right) • Inspection
242115
Integrated Drive Generator (Left) • Servicing
242118
Integrated Drive Generator (Right) • Servicing
258282
Personal Breathing Equipment (No. 1) - Debited Inspection
256281
Personal Breathing tot:went No. II • Removal i Installation
258285
Personal Breathing Equipment (No. 2) • Detailed Inspection
256284
Personal Breathing Eq.:rent No. 21- Removal ,Iratallaton
271107
Aileron Actuator Load Relief Bungee Assembly (Left) - Inspection
271108
Micron Actuator Load Relief Bungee Assembly (Right) • Inspection
271307
Aileron Hydraulic Boost Actuator (Leg) • Inspection
271308
Aileron Hydraulic Boost Actuator (Right) • Inspection
273008
Elevator Actuator Load Relief &epee (Left) • Inspection
273009
Elevator Actuator Load Relief Bmgee (Right) • Inspection
273407
Elevator Hydraulic Dual Tandem Actuator (Lift). Inspection
273408
Elevator Hydraulic Dual Tandem Actuator (Right) - Inspection
276019
Flap Actuator Travel Nut Mehl • Lubrication
275020
Flap Actuator Travel Nut (Right) • Lubrication
281407
Gravity Water / Fuel Drain Valve (Left)- Operational Test
281408
Gravity Water! Fuel Drain Valve (Right) - Operational Test
304105
Windshield Sine. Seal (Left) • Detailed Inspection
304108
Windshield Surface Seal (Right) - Detailed Inspection
318001
Caning Wanting System (Including Audio) • Operational Test
318201
Symbol Generator Switching • Operational Check
318203
MENU Capability to Display Standby Engine InsamneMs • Operational Test
318207
Enhanced Ground Proximity Warning System • Operational Check
318208
Elevator Mistrim / Aileron Roblin Messages • Operational Test
321045
Main Landing Gear and Attachments (Left) • General Visual Inspection
321048
Main Landing Gear and Attachments (Right) • General Visual Inspection
321801
Main Landing Gear Door tinges (Leh) • Lubrication
Page 3 of 6
EFTA01083147
we
7018884.800
Tiered Package - Aircraft Records and Condition Survey
MiliglIBNISI201
EithlkiiCracig
Code Description
Included in
Material
felinele
321802
Main Landing Gear Door 16119/15 (Right) • Lutz...kat:Ion
322006
Nose Landing Gear and Attachments • General Visual Inspection
322901
Nose Landing Gear Door Hinges • Lubrication
328201
Nose Wheel Steering Unit • Lubrication
328202
Nose Wheel Steering Collar Assembly I Slave Gear • Lubrication
334050
Navigation (Position) Light Lens- Detailed Inspection
831012
Exterior Radome Faking Installation • Detailed Inspection
831014
Enhanced Vision System Sapphire Window Installation • Detailed Inspeciion
723103
LH Low-pressure Compressor (Fan) Annulus Fillers • Detailed Inspection
723109
LH Lowpresswe Compressor Inlet Cone - Detailed Inspection
723161
LH LP Compressor Front Blade Retaining Ring - Detailed Inspection
723165
LH Fiord Blade Retaining Ring • Removal / Installation
723801
LH Lowpressure Can-presser Nose Cone- Removal! Inslallalion
723805
LH Lorepressure Compressor (Fan) Mnulus Filler No. 1 - Removal !Installation
723806
LH Lov&presswe Compressor (Fan) Mnulus Filler No. 2 - Removal ., Inslallalion
723807
LH Lovepressure Compressor (Fan) Annulus Filler No. 3 - Removal ., Installation
723808
LH Lorepresswe Compress:, (Fan) Annulus Filler No. 4 - Removal ., Inslallalion
723809
LH Low pressure Con-presser (Fan) Annulus Filler No. 5 - Removal) Installation
723810
LH Lowpressure Compressor (Fan) Annulus Filler No. 6 - Removal / Installation
723811
LH Lowpressure Compressor (Fan) Annulus Filler No. 7 - Removal / Installation
723812
LH Lowpressure Con-presser (Fan) Annulus Filler No. 8 - Removal / Installation
723813
LH Lowpressure Can-presser (Fan) Annulus Filler No. 9 - Removal / Installation
723814
LH Lowpressure Can-presser (Fan) Annulus Filler No. 10 - Removal / Installation
723815
LH Lowpressure Can-presser (Fan) Annulus Filler No. II - Removal / Installation
723816
LH Lowprassure Can-pressor (Fan) Annulus Filler No. 12 - Removal / Installation
723817
LH Lowpressure Can-pressor (Fan) Annulus Filler No. 13 - Removal / Installation
723818
LH Lorepressure Compressor (Fan) Annulus Filler No. 14 - Removal / Installation
723819
LH Lorepressure Compressor (Fan) Annulus Filler No. 15 - Removal / Installation
723820
LH Lovepressure Compressor (Fan) Annulus Filler No. 16 - Removal / Installation
723121
LH_Lorepressure Compressor (Fan) Annulus Filler No. 17 - Removal/Installation
723(122
LH Lowprassure Con-presser (Fan) Annulus Filler No. 18 - Removal/Installation
723823
LH Lowpressure Compressor (Fan) Annulus Filler No. 19 - Removal/Installation
723824
LH Lowpressure Compressor (Fan) Annulus Filler No. 20 - Removal/Installation
723825
LH Lowpressure Can-presser (Fan) Annulus Filler No. 21 - Removal t Installation
723826
LH Lowpressure Can-presser (Fan) Annulus Filler No. 22 - Removal i Installation
723827
LH Lowpressure Can-presser (Fan) Annulus Filler No. 23 - Removal i Installation
723828
LH Lowpresswe Compressor (Fan) Annulus Filler No. 24 - Removal! Installation
723853
LI1 Nose Cone Rotating Fairi
• Removal: Inslallalion
723104
RH Low-pessue Compressor (Fan) Mnulus Fillers • Detailed Inspection
723109 (7231101 . RH Lowpressura Compressor Mel Cone . Detailed Irepeolon
723161 (7231621 RH LP Compass°. From Blade Retaining Ring . Detailed in
ion
723165 (7231661 RH Freed Blade Retaining Ring - Removal / Imullaton
723801 (7238021 RH LtI1WPICSSUM Compressor Nose Cone . Removal/ Inslallalion
723805 (7238291 RH Low.oressure Cancressor Pan) Annulus. File, No. 1 • Removal; Inslallalion
723806 (7238301 RH Low.oressure Compressor IFan) Annulus File, No. 2 • Removal; Inslallalion
723807 (7238311 RH Low.pressure Compressor (Fan) Annulus File, No. 3 • Removal; Inslallalion
723808 (7238321 RH Low.pressure Compressor Pan) Annulus Filer No. 4 - Removal i Inslallalion
723809 (7238331 RH Low.pressure Compressor Wan) Annulus Filer No. 5 - Removal; Inslallalion
723810 (7238341 RH Low.pressure Compressor (Fan) Annulus Filer No. 6 • Removal t Inslallalion
723811 (7238351 RH Low.pressure Compressor (Fan) Annulus Filer No. 7 • Removal / Installation
723812 (723836) RH Lowpressure Compressor (Fan) Annulus Filer No. 8 • Removal / Installation
723813 (7238371 RH Low.pressure Compressor (Fan) Annulus Filer No. 9 • Removal; Inslallalion
723814 (7238381 RH Lowpressura Compressor (Fan) Annulus File, No. 10 • Renal : Installation
723815 (7238391 RH Lowpressura Compressor Wan) Annulus File, No. 11 . Removal: Installation
723816 (7238401 RH Lowpressura Compressor Pan) Annulus Filer No. 12 - Removal .' Installation
723817 (7238411 RH Lowpressura Compressor Pan) Annulus File, No. 13. Removal: Installation
723818 (7238421 IN Low.oressura Compressor Pan) Annulus File, No. 14 - Removal / Installation
723819 (7328431 RH Low.oressura Compressor (Fan) Annulus File, No. 1S. Removal / Installation
723820 (7238441 RH Low.pressure Compressor Pan) Annulus Filer No. 16. Removal / Installation
723821 (7238451 RH Low.pressure Compressor (Fan) Annulus Filer No. 17 - Removal / Irotallation
723822 (7238461 RH Low.pressure Canpressor (Fan) Annulus Filer No. 18. Removal / Iretallatton
723823 (7238471 RH Low.pressure Canpressor (Fan) Annulus Filer No. 19 - Removal / Iretallatton
723824 (7238481 RH Low.pressure Canpressor (Fan) Annulus Filer No. 20 - Removal / Iretallatton
723825 (723849) RH Lowpressura Canpressor (Fan) Annulus Filer No. 21 - Removal / Irotallatton
723826 (7238501 R/I Lowpressura Ccapressor (Fan) Annulus Filer No. 22 - Removal / Ireallaton
723827 (7238511 RH Lowpressura Ccapressor (Fan) Annulus File, No. 23 • Removal / Installation
723828 (7238521 RH Lowpressura Ccapressor Wan) Annulus File, No. 24 - Removal I Installation
723853 (7238541 RH Nose Cone Relating Fairing - Removal/ Inslalalien
726101
LH Accessory Gearbox Engine Oil Tank Flre Blanket • Detailed Inspection
726102
RH Accessory Gearbox Engine Oil Tank Fire Blanket • Detailed Inspection
783337
Primary Lock Actuator and Mechanism (Left) - Inspection
710021
Engine Test 3A 'Leh) - Thrust Reverser Cheek
783338
Primary Lock Actuator and Mechanism (Right) • Inspection
710022
Engine Test 3A tRighl) • Thrust Reverser Check
793001
LH Oil Aber Differential Pressure Indicator • Detailed Inspection
793002
RH Oil Filter Differential Pressure Indicator • Detailed Inspection
688010
BR700-80.900340 • Air Turbine Starter Oil Level
898010
BR70080-900340 • Air Turbine Starter Oil Level
lcuLL2 Month InspecticutCodel
237004
Cockpit Voice Recorder • °corollary,' Test
240121
Emergency Battery Power System (Lett) • Operational Tesl
240122
Emergency Battery Power System (RigM1 • Condone' Test
240123
Emergency Battery Power System (Forward) • Operational Test
240124
Emergency Battery Power System (Aft) - Operational Test
243011
L Main Battery- Capacity Check
Page 4 of 6
EFTA01083148
log
7018884.800
Tiered Package • Aircraft Records and Condition Survey
Mandokautags
Petaled Cade
Pncln Reariotigg
Included in
Material
Estimate
243001
Man Battery (Cell)' Removal I Installation
213012
A Main Battery • Capacity Check
243002
Man Battery (Right) • Removal / Installation
256017
Fire / Crash Axe • Inspection
256028
Smoke Hood (Pilot) • Detailed Inspection
256027
Smoke Hoed (Copilot). Detailed Inspection
256028
Smoke Hoed (Observer) • Detailed Inspection
256043
First Aid Kit (No. 1) • Detailed Inspection
256041
First Aid 101 (No. 1) - Removal .• Installation
256044
First Aid Kit (No. 2) • Detailed Inspection
256042
First Aid 101 (No. 2)
256071
Flashlight (lb. 1) • Operational Test
256061
FlasHight (No. I)
256072
Flashlight (No. 2) • Operational Test
256062
FlasNight (No. 2)
256073
Flashlight (No. 3) • Operational Test
256063
Flashr hi No. 3)
256074
Flashlight lib 4) • Operational Test
256064
Flashlight (No. 4)
256075
Flashlight (No. 5) • Operational Test
256065
FlasHight (No. 51
256161
Medical Kit • Detailed Inspection
256160
Medical kit
256201
Life Vesl(s) • Detailed Inspection
256211
Life Vest (No. 1) • Percival ., Installation
256212
Lila Vest (No. 2). Removal .• Installation
256213
Life Vest (b. 3)' Remaval / Installation
256214
Life Vest (be. 4) - Removal / Installation
256215
Life Vest (No. 5) - Removal 1 Installation
256216
Life Vest (No.. 8) - gem o mai'Installation
256217
Lib Vest (No. 7) - Removal / Installation
256218
Life Vest (No. 8) - Removal / Installation
256219
Life Vest (No. 9) - Removal / Installation
256220
Life Vesl (No. 101 . Removal/Installation
256221
Life Vesl (No. 111 - Removal/Installation
256222
Life Vesl (No. 121 . Removal/Installation
256223
Life Vesl (No. 13) . Removal/Installation
256224
Life Vesl (No. 14) . Removal ! Installation
256225
Life Vest (No. 15) . Removal/Installation
256226
Lib Vest (No. 16) . Removal/ Installation
256227
Life Vest (No. 171. Removal I Installation
256228
Life Vest (No. 181 - Removal r Installation
256229
Life Vest (No. 19) - Removal r Installation
256230
Lila Vest (No. 201 - Removal r Installation
256231
Life Vest (No. 211 - Removal; Installation
256232
Life Vest (No. 221 . Removal; Installation
256233
Life Vest (No. 23) . Removal/ Installation
256234
Life Vest (No. 24) . Removal/Installation
256235
Life Vest (No. 25) . Removal/Installation
256236
Life Veal (No. 26) . Removal / Installation
256250
Life Veal (Pilot). Removal! Installation
256251
Life Vest (Copilot) - Removal / keIrJlalion
256252
Life Vest (Observer) - Removal I Installation
256253
Life Vest (Crew Member) • Removal! Installation
256202
Life BM(s) (No. 1) • Detailed Inspection
256260
Lib Raft (No. II • Removal! Installation
256203
the Rata) (NO. 2) • Detailed Inspection
256261
Life Raft (No. 21 • Removal ,' Installation
256308
Emergency Locator Transmitter • Operational Test (FAR 91.207)
256301
Emergency Locator Transmitter • Removal! Installation
256311
Emergency Locator Transmitter . Operational Check
282559
Trash Receptacle Enclosure (Credenza)• Detailed Inspection
282560
Trash Receptacle Enclosure (Alt Lavatory) • Detailed Inspection
282561
Trash Receptacle Enclosure (Forward Lavatory) • Detailed Inspection
282562
Trash Receptacle Enclosure (Alt Galley! Annex) • Detailed Inspectica
282563
Trash Receptacle Endows, (Forward Galley I Annex) • Detailed Inspection
282564
Trash Receptacle Enclosure (Crew Refreshment Area) • Detailed Inspection
282585
Trash Receptacle Enelene (VP Cabinet) • Detailed Inspection
262568
Trash Receptacle Emden, (Midcabin Galley) • petaled Inspection
282562
Trash Receptacle Fke Extinguisher Wales (Credenta) • Detailed Inspection
282583
Trash Receptacle Fire Extinguisher Hordes (Alt Lavatory) • Detailed Inspection
262564
Trash Receptacle Fke Extinguisher Regales (Forward Lavatory)• Detailed Inspection
282585
Trash Receptacle Fke Extinguisher Noules (Aft Galley !Annex) • Detailed Inspection
282589
Trash Receptacle Fke Extinguisher Hordes (Forward Galley I Annex) • Detailed Inspection
262587
Trash Receptacle Fke Extinguisher Noules (Crew Refresh/nerd Area) • Detailed Inspection
262588
Trash Receptacle Fke Extinguisher Howes (VIP Cabinet) • Detailed Inspection
nzses
Trash Receptacle Fke Extinguisher Hordes (IMelcabin Gassy) • Detailed Inspection
262801
Portable Helen Fire Extingtisher (Cockpit) • Inspection
262600
Portable Raton Fire Eein
iS1101 Cock
. Removal! Installation
282802
Portable Halal Pm fad
Sher (Cockpit) • Weight Check
262811
Portable Kahan Fire Ertl
Sher (Forward Cabin • Inspection
262610
Portable 'talon Fire EeineLli51101 (Forward Cabin) • Removal; Installation
282812
Portable Raton Foe Extinguisher (Forward Cabin) • Weight Check
282821
Portable Raton Fire Extlnaulther (Alt Cabin) • Inspection
262620
Portable listen Fire CeinelliShel (Alt Cabin( . Removal! Imeallation
282822
Portable Raton Fire Extinguisher (Aft Cabin) • Weight Check
282831
Portable Raton Fire Extinguisher (Alt Lavatory) • Inspection
P5905 e
EFTA01083149
Oa
7018664,800
Tiered Package - Aircraft Records and Condition Survey
MillIdiggIlLcatt
Related Ciatig
reido Gerwrichtigg
Included in
Material
Estimate
262630
Portable 'talon Fire Extinguisher (Alt Lawmen.) • Removal / Installation
262632
Portable Malan Fire Extinguisher (Mt Lavatory) • Weight Check
262642
Portable Kahan Fire Extinguisher (Baggage Compartment} Weight Check
262640
Portable 'talon Fire Extinguisher (Baggage Compartment). Removal: Installation
262641
Portable !talon Fire Extinguisher (Baggage Cornoartmenl) • Inspection
335020
Cabin Emergency Llghtino • Operational Test
144008
IRU No. 1 Fan Filter • Inspection
344011
IRU No. 1 Fan Filler • Removal I Installation
316013
Symbol Generator No. 3 • Removal / Installation
316010
Symbol Generator • Operagenal Check
344009
IRU No. 2 Fan Filter • Inspection
344012
IRU No. 2 Fan Filler - Removal I Installation
242604
R IDG GCU - Removal / Installation
246002
R BPCU • Removal I Installation
242100
Engine AC Gereralion • Cperational Check
344010
IRU No. 3 Fan Filter • Inspection
344013
IRU No. 3 Fan Filler - Removal I Installation
344004
Inertial Reference System • Operational Check
316011
Symbol Generator No. 1 • Removal / Installation
353002
Portable Oxygen Bottle and Mask Assembly (No. I) • Detailed Inspection
353001
Portable Oxygen Bottle (No. I) • Removal / Installation
353007
Portable 0
Bottle and Mask As
No.
• Detailed Ins
lien
353006
Portable Oxygen Bottle (No. 2) . Removal / Installation
182003
Water Sterilizer Finer • Discard
X
361039
Water &entity - Removal I Installation
381029
Water System • Cperational Test
382002
Water Stonlizer Filial - Removal / Installation
621010
Main Entrance Deer • Lubrication
521015
Man Enhance Dear • Cperating Procedures
623005
Baggage Compartment Door • Lubrication
625001
Auxiliary Pressure Bulkhead Door Seal • Detailed Inspection
2A! 1000 New Inspection Codes
271110
Aileron Inter-Column Linkage Disconnect Assemblies • Operational Test
271303
Aileron Harclover Prevention System (Left) • Operational Check
271103
Aileron /' Flight Spoiler Control System - Finctional Test
271141
Aileron Actuator Load itch& Bungee (Loll)' Load Inspection
271304
Aileron Herdover Prevention System (Right) • Operational Check
271142
Aileron Actuator Load Reid Bungee (Right) • Load Inspection
272004
Rudder Torque Tube Bearing • Lubrication
272301
Rudder Ilardever Prevention System • Operational Test
272113
Rudder and Trim Control System - Operational Check
273032
LonaitudinM Control System Friction Check • inspection /Check
273113
Elevator Inter•Column Linkage Disconnect Assembly • Operational Test
273405
Elevator Hardener Prevention System • Operational Test
271143
Elevator Actuator Load Rebel Bungee Meg' - Load Inspection
271144
Elevator Actuator Load Rebel Bungee (Right) - Load Inspection
273005
Elevator Control System • Cperational Test
274106
Emergency Horizontal Stabilizer (Backup Mode) • Operational Test
276201
Ground Spoiler Auto Deploy Rejected Takeoff Mode • Operational Test
278202
Ground Spoiler Manual Retract Mode • Operational Test
493404
APIJ Fuel System Components, Lines and Connections • General Visual Inspection
711003
Intel Cowl Aerodynamic Surfaces (Lett) • Detailed Inspection
711004
Intel Cowl Aerodynamic Surfaces (Right) • Detailed Inspection
711005
Cowl Fasteners and Attachment Features (Lett) • Detailed Inspection
711006
Cowl Fasteners and Attachment Features (Right) • Detailed Inspection
711007
Inlet Cowl Rear Bulkhead External Surfaces (Left) • Detailed Inspection
711008
Inlet Cowl Rear Bulkhead External Surfaces (Right) • Detailed Inspection
711015
Fixed Cowls (Len) • Detailed Inspection
711016
Fixed Cowls (Right) • Detailed Inspection
723311
LH Variable Staler Vane Drive Bracket Belts • Torque Reapplication
711019
Engine Loser Cowl Door (Lefts • Removal I Installation
710019
LH Engine Rio Leak Check Test 28 • Ira Fuel System
723312
RH Variable Stator Vane Drive Bracket Bolts • Torque Reapplication
711020
Engine Lower Cowl Door (Right) - Removal / Installation
710020
RH Engine Run Leak Check Test 28 - HP Fuel System
723401
LH Fan Track! Cold Stream Duct • Detailed Inspection
723402
RH Fan Track: Cold Stream Duct • Detailed Inspection
753025
LH Variable Staler Vane Mechanism • Lubrication
763115
Thrust Reverser Deactivate! Activate (Call) • Procedure
753026
RH Variable Stater Vane Mechanism • Lubrication
703116
Thrust Reverser Deactivate! Activate Oliglal - Procedure
T80005
Thrust Reverser and Exhaust (Leg) • Zonal Inspection
780006
Thrust Reverser and Exhaust (Right) • Zonal Inspection
783009
Thrust Reverser Front Face Torsion Box Front Frame (Left) • Detailed Inspection
783010
Thrust Reverser Front Face Torsion Box Front Frame (Right) • Detailed Inspection
801011
LII Air Turbine Starter Magnetic Chip Collector • Detailed Inspection
801012
RH Air Turbine Starter Magnetic Chip Collector • Detailed Inspection
Page 6 o!6
EFTA01083150
Technical Artifacts (45)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
www.gulfstream.comEmail
[email protected]Flight #
AC0Phone
(7231101Phone
(7231661Phone
1 (7231621Phone
373-0349Phone
7018664Phone
7018884Phone
801 (7238021Phone
805 (7238291Phone
806 (7238301Phone
807 (7238311Phone
808 (7238321Phone
809 (7238331Phone
810 (7238341Phone
811 (7238351Phone
813 (7238371Phone
814 (7238381Phone
815 (7238391Phone
816 (7238401Phone
817 (7238411Phone
818 (7238421Phone
819 (7328431Phone
820 (7238441Phone
821 (7238451Phone
822 (7238461Phone
823 (7238471Phone
824 (7238481Phone
826 (7238501Phone
827 (7238511Phone
828 (7238521Phone
853 (7238541SWIFT/BIC
CHASUS33Wire Ref
REFURBISHMENTWire Ref
ReferenceWire Ref
RefreshmentWire Ref
RefurbishmentWire Ref
Wire TransferWire Ref
referenceWire Ref
referencedWire Ref
referencesWire Ref
reflectedWire Ref
refundableWire Ref
wire transferForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.