RED-POWER
Phone: 800-746-8273
507-426-7408
DOOR SPECS
SChweind0Oitaim
A-1
SPEC
SHEET
sc ,
THE DOOR LEADER
ss
Order Number:
Building Manufacturer:
Bid Number:
112112-BS
Contact:
Bid Date:
11/21/12
Fax/E-Mall:
Company: Buck Steel
Name:
Customer: Brian
Job Loc: Miami Port
FL
Door Width
Door HeIght
Wedge
Overall Height
Door Style
Truss Type
Hinge Style
Tot W - Inches Tot H - inches
50%0.00"
17'-0.00"
10.25"
17-10.2s"
HYDRAULIC
H External Single Hinges
602"
214.25"
Ill PRELIMINARY SPECS _These are Preliminary Spec Sheets - do not manufacture the building header/columns using these
specs. This is a rough estimate of what the door measurements and weights will be when purchased.
. FINAL SPECS - AS OF Will be provided when the door contract is finalized.
11/21/12
Preliminary - Hydraulic Door Specifications
inches
Feet & Inches
H
A- 600.00"
50= 0.00" Customer's Finished Clear Opening Width.
Al- 605.00"
50L5.00" Placement of the building side columns to accept a Hydraulic Door.
Clear Opening between the building side columns.
AA- 614.00" I 51‘ 200 Total distance to stay back with the building sheeting on the side columns.
B- 204.00" I 17‘ 0.00" Customer's Finished Clear Opening Height - Door in the Open Position.
BB- 210.75"
17=6.75" Distance from the finished floor to the bottom of the Building Header / Stub Column.
Do not have stub columns / continuous header located any lower than this measurement.
C- 214.25" I 17‘ 10.25" Distance from finished floor to the very top of hinge (B+D=C).
D-
10.25" I
10.25" Distance from top of clear height to top of single hinges.
E-
9.00"
9.00" Distance from top of clear height to center of mounting hole for single hinges.
F- 215.25"
171- 11.25" Distance from finished floor to the building sheeting line above the door.
Hold the sheeting to this elevation from the finished floor.
H- 213.00"
17‘ 9.00" Distance from the finished floor to the center of single hinge bolt holes. lk
YOU WILL BOLT THROUGH YOUR HEADER AT THIS HEIGHT -s
Side View
Your Concrete Floor
mete
base
flocr
frame. The door
must be a sold
cc
under me doe.
rests on
LEIMI Peace,
EY Can)
the tape ol the building cobmn a buildng Sne. To pm
a Weather tight seal
Buildrrps
wider the hydraulic door and to keep moisture oul ol Me buildng. have the
Stub Gahm
conaele Ilea extend beyond the opening 8 to 8 inches slcping away Vont
(By others)
Me Curdled. Concrete Floor Must Be Level.
Di
Side Column
9
— SCHWEISS
Provided
Door Frame
Hi
l
t
.
A
B'
Door Frame
Header Tube
Inside of &arm
DOW SEEtiElli
F
C
H
138
B
CLEAR
CI:EWE
and Angle
Trim
Bal
Bulldogs
I
Sde Column
(By Others)
een
/
Bottom Rubber Seal
I
9
a
Gradual slops haw the
CREEP
inside a em bulking
nor) 1
Li
See
Made addhsa
IMI
Top View of Your Hydraulic Door
1,7
Vary
vary
AA
AAR
Al - Plistement of Baking Side Cclurrwa
)••••
IA
A- Clear Door Opening
1...
FRAME
'
HYDRAUUC DOOR
fir
_LEu.11
eu
a.
..
- td --
v
-
Th
_i
•
....
.
g at* o flikalbla
COM ameba
Jaiirmal ir ante SiaVa• Pt Radii x RI
i_,.r-n
Suggeeled &Ming Tam- By ahem
w
Door Frame WAR
_Ii.
AR . ['Mance to
bath imth the buldng
is
!S• '1,
T
I
I
F, w.
Al
slay
sheeting
ass*
r
112112 1029
v-
skit-
A
.26'
EFTA01083246
S
C
THE DOOR LEADER
s
s
.
I
' •
.
• , • ,,, •, : DOOR
fax: 501-426-/4118
SECS
A-2
SPEC
i i
SHEET
Order Number:
Bid Number:
112112-BS
Bid Date:
11/21/12
Door Width
Door Height
Wedge
Overall Height
Door Style
Trues Type
Hinge Style
Tot W - Inches
Tot H - Inches
50%0.00"
171-0.00"
10.25"
17'-10.25"
HYDRAULIC
H External Single Hinges
602"
214.25"
e PRELIMINARY SPECS _These are Preliminary Spec Sheets - do not
specs. This is a rough estimate of what the
manufacture the building header/columns using these
door measurements and weights will be when purchased.
FINAL SPECS - AS OF Will be provided when the door contract is
11/21/12
finalized.
Preliminary - Design Criteria - Required
Building Code
2009 IBC
Building Code - (Default
Door Information
is 2009 IBC)
Wind Speed
180 mph
3 second gust • (Default is 90 mph)
Wind Exposure
C
Exposure - (Default is C)
Wind Type
Main Wind
Component Wind or Main Wind (MWFRS) • (Component if less than 700sqft.)
Enclosure
Enclosed
Enclosed or Partially Enclosed - (Default is Enclosed)
Topographic Factor - Kzt
1
Must Be Provided by the Engineer of Record- (Default is 1)
Occupancy
Standard
Standard, Essential, or High Occupancy - (Default is Standard)
Building Height
21'
Mean Roof Height or Eave Height for Building with Roof Slope of 10 Degrees or Loss.
Roof Slope
1 : 12
Roof Slope - (Default is 1 : 12)
Door Operational Wind Speed 30 mph
Maximum Wind Speed for Door Operation is:
30 mph
Do not operate door if
Door must be closed with
when wind speed is expected
wind speed exceeds the max
imum
door operating speed.
floor pins and locks engaged when un-attended or
to exceed the maximum door operating speed.
Preliminary - Technical Information
Al-
9
Number of Hinges
For Your Hydraulic Door
A2-
2
Number of Lift Points • Location: (One on each end of the door frame)
A3-
240-1 PH
Electrical System with Up/Stop/Down Switch and Power Unit on the (LI) - Left/Inside
Door Weights
Bl-
13483 lbs Structural Framing Weight
B2-
878 lbs Exterior Sheeting & Trim Weight
(29ga. =0.82 psf. -- 26ga = 0.99 psf.
B3-
Liner Sheeting & Trim Weight
(29ga. = 0.82 psf. -- 26ga = 0.99 psi) /2 II Only Bottom Half
B4-
Insulation Weight
(4" Blanket = 0.5 psf. -- r Blanket = 0.65 psf.)
B5-
Optional - added accessories
B6-
14339 lbs Estimated Total Door Weight
WARNING • Schweiss manufactures the door based on the listed weights above. DO NOT modify the weight of the door.
Preliminary
- Door Reactions
ND DIRECTION
WIND DIRECTION
WI
.4(._
I 0 OR CLOSED
I nen NeleFS
CENTER HINGES
LEEWARD WALL
A
WINDWARD WALL
Column Reactions
ride Column one 1St Hinge
Int•ii0i Hinges
I
el Bon (Ito)
122721flinelt End pus)
OW
A UP
(c,)
(A.)
(A,)
(A.)
(k)
Ay
Dead Load
0
0
986 y
0
1972 y .44( IN
. 12"
OUT >-
WINDWARD WALL
180 MPH WIND LOAD
.
Internal Pressure
3098 4.
426 4
0
852 .4-
0
4 •
• Ax
•
Internal Suction
8168 4t
I 1123 4tI
0
2246 4t
0
137.93"
LEEWARD WALL
42"
Internal Pressure
6619 *
910 te.[
0
1 1820*
0
Internal Suction
1549 es.
213 *I
0
I 426 *
0
-. / Elx )7
''
Column lloactono
'
...^ I.ls lei HM
Interior Hinges
BY
st see Opt)
La from Boon
(B,)
i
(Br)
(AO
12-22(1no)
(IM.)
(Ai
0%)
210.19"
'V
(Ar)
4
,
Dead Load
1987844 6869
11927*
986 *
5963* 1972 I
168.19"
DOWN
WINDWARD WALL
30 MPH MAXIMUM WIND FOR DOOR OPERATIONS
Internal
Door Angle
Pressure 3964 -g 1110 A
20 .4
169 A
39 4
338 a
0° to 90'
*
Internal Suction
2324 4t
851 a 1
76 4- ,
347 A
153 .4-
695 a
LEEWARD WALL
Internal Pressu
2506 *
702
11 *
13 4
23 *
25
-Cx
x . Horizontal
Internal Suction
866 *
243 a
4*
4 4
8*
9
a
y. Vertical
Important Note:
When your hydraulic door is opening or in the fully open position, the door tends to pull away from the building at the hinge line also putting stress
on each building column where the cylinders attach. The building manufacturer / contractor / owner is responsible to insure that the building
structure is capable of handling all the imposed loads. All materials not supplied by Schweiss are the full responsibility of others!!
112112 10:39
EFTA01083247
..,
RED-POWER DOOR
I ,IX. 50/-42674LIti SPECS
schweissdows.com
A-3
SHEET
lo '
SPEC
THE DOOR LEADER
Order Number:
Bid Number:
112112-BS
Bid Date:
11/21/12
Door Width
Door Height
Wedge
Overall Height
Door Style
Truss Type
Hinge Style
Tot W - Inches
Tot H - Inches
50'-0.00"
171-0.00"
10.25"
17'-10.25"
HYDRAULIC
H External
Single Hinges
602"
214.25"
e PRELIMINARY SPECS _These are Preliminary Spec Sheets - do not manufacture the building header/columns using these
specs. This is a rough estimate of what the door measurements and weights will be when purchased.
FINAL SPECS - AS OF -
11/21/12 will be provided when the door contract is finalized.
Minimum Hydraulic Door Header Requirements
1. Maximum Allowable Vertical Deflection L/ 180 Maximum under Dead + Live Load or Dead + Snow Load Combinations.
Vertical Frame Deflection must be held so that the door will open when the full snow load is applied to the building.
2. Deflection Increases from
0"
at Door Side Columns to the maximum allowable deflection at the center of the door.
3. Maximum Allowable Horizontal Frame Drift is H/60 in the plane of the wall containing the door.
Minimum Hydraulic Door Side Column Requirements
4. L/90
(Wind Load) Maximum Allowable Inward or Outward Deflection of Your Buildings Hydraulic Door Side Columns:
5. L/180 (Dead Load of Door)
6.
1/2"
Recommended Minimum Flange Thickness of Your Buildings Hydraulic Door Side Columns:
7.
Ebb's- Side Column Eccenracry "e"
Information for Building Designers
Designing the Door Side Column for Hydraulic Doors.
Eccentricity Diagram
8. The door side column must be designed to withstand the forces
I
AXIAL
from the hydraulic door cylinder as the door opens and in all
positions. Due to the diameter of the cylinder and clearance
required to allow the cylinder to rotate as the door opens, the
altITOWIS
NEM
SIM
ODLWII
A
LOAD
bracket that attaches the cylinder to the door side column causes
+A
10.63"
eccentric loading and torsion on the door side column. The
bracket is offset from the centerline of the door side column on
both the major and minor axis of the door column.
Design the door side columns for:
_
I -23842'i
lbs. J
V
Y
9. Door Column Must Be Designed for inward deflection due to wind
load distributed uniformly along the length of the door column and
for an outward deflection due to the hydraulic cylinder reaction
(door Closed) at the cylinder location.
10. Major axis and minor axis bending are due to the cylinder
LMAJOR
40,
MINOR
Gieir
6.00" A
AXIS
AXIS
1.38"
reactions Bx and By as shown in the adjacent eccentricity diagram.
11. Torsion on the door column due to the eccentricity ('C) of the door
cylinder and bracket are shown in the adjacent eccentricity
COSTOISISOONIIIIIJOIS
SIM Mt Mall
diagram.
12. Axial oad by the building framing on the door side column
TUBE
WADS
(including the dead load of the door).
13. Torsional properties of the door column must be designed for
combined axial compression and torsion according to Chapter H
of AISC 13th Edition.
Deflection Requirements for door side column:
I Si
a
1
42.56"
1
14. Design the door side column for the same deflection requirements
u
as required by the building code for your cladding type.
Torsional Deflection:
15. The torsional deflection of the door side column should be limited
to 3° to allow the door hydraulic cylinder to operate properly.
-
23842
•
Bx lbs.
General Design Notes:
16. The door side columns, header and bracing should be designed
by a registered Professional Engineer.
702
lbs.
702
lbs.
17. Specific building
than those indicated in the
conditions other
Spec Sheets may exist which require further engineering
consideration.
•
v
168.19"
18. Schweiss is not responsible for the size or design of the door
header and side columns for your building. All materials
not supplied by Schweiss are the full responsibility of others.
19. Door Dead Load is applied to the building when the door is open
or closed.
20. It is the building designers responsibility to combine the door
reactions with the appropriate load combinations.
•
1'
112112 10:39
CONCOILTIMOCA
CONCIINIMMI
EFTA01083248
-wr
SC
1
THE DOOR LEADER
SS RED-POWER DOOR
l MC 50/-42G-i4US SPECS A-4
SPEC
scheeissdows.com SHEET
Order Number:
Bid Number:
112112-B5
Bid Date:
11/21/12
Door Width
Door Height
Wedge
Overall Height
Door Style
Musa Type
Hinge Style
Tot W - Inches
Tot H - Inches
50%0.00"
17-0.00"
10.25"
17-10.25"
HYDRAULIC
H External
Single Hinges
602"
214.25"
Attaching Hydraulic Door To Your Building
I Sheeting Above Your Hydraulic Door
Typical I-Beam Building Side Column With Stub Columns
• Boll Through I-Beam Side
- Sheet above door at the height shown below.
de Columns and Stub Columns or Steel Tube Header.
- Provide proper backing to attach sheeting and
• Face of Header and Stub Columns must be Flush with each other.
door top rubber to at this height.
70.50"
R''S
-4 -4( .< .4
72.00"
"--c
16.00"
BY OTHERS
FLASHING/BACKING
Provide Member To
1I
BUILDINGS
_
STUB COLUMNS
Attach Rubber/Sheeting
Above The Door.
1111
on
HEAD22 TUBE
(By Others)
•
BUILCINGS
.
•
•—•
I
:I
TOP RUBBER
STUB caulk
OR
SCHWEISS
PROVIDED
1..
HEADER TUBE
I
BY 071ERS
i
DOOR FRAME
HEADER
AND ANGLE
i
214.25"
F- 215.25"
,
0
v
SCHWEISS
PROVIDED
DOORFRAME
HEADER TUBE
AND ANGLE
i
Note: Hinge bolts provided by Schweiss will be 5/8 x 6 Hex Bolts
unless otherwise specified by customer.
0
'MINS Fbar
V Finished ricer
0
Owners/Contractors and Building Manufacturers:
When working with contractors or construction companies it is your responsibility toj,ass this information on to them. The
Building Manufacturer / Contractor / Owner is responsible to ensure that the building structure is capable of handling all the
imposed loads. All materials not supplied by Schweiss are the full responsibility of others!!
The Customer / Contractor / Building Manufacturer is responsible for ensuring that the correct version of the A-1 thru A-8
Spec Sheets are being used for their door. Schweiss Distributing is Not liable for the Customer / Contractor / Building
Manufacturer using an obsolete version of the A-1 thru A-8 Spec Sheers.
I have read through Spec Sheets A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8 and agree to them.
i's PRELIMINARY SPECS _These are Preliminary Spec Sheets - do not manufacture the building header/columns using these
specs. This is a rough estimate of what the door measurements and weights will be when purchased.
• FINAL SPECS - AS OF Will be provided when the door contract is finalized.
11/21/12
Thank You :
Customer:
Sales Person
PS, Rita
SIGNATURE
112112 10:39
EFTA01083249
R..
l.
Schweiss furnishes the hydraulic door frame.
50'-0.00"
17-0.00"
Door Width
Door Height
Order Number:
Bid Number:
1121124S
Bid Date:
11/21/12
I
14th
Distance
Between
Knees
Hinge
Locations
Hinge Locations for your Hydraulic Door
Field drill the hinge header holes when you are installing the hydraulic door.
Distance from the right side of the clear opening to the center of the holes on each of the single hinges.
Left and Right End Hinges:
15th
Important: Each end hinge of the hydraulic door will overlap the building side column and must
Hinge
Distance
16th
be attached securely to each building side column.
Locations
Between
17th
Hinman
iss RED-POWER DOOR SPECS
P—E5C
Phone: 800-746-8273
Fax: 507-426-7408
schweissdoon- com
EADER
SHEET
18th
13th
19th
12th
20th
11th
21st
72.00'
72.00^
10th
$
N
3
*
al
.
22nd
9th
589.00"
70.50'
23rd
8th
518.50"
72.00'
24th
7th
446.50"
72.00'
25th
Atm ParsarIng From Here ( Edge of Clow Opening)
6th
374.50"
72.00'
;I.
8
ti
3
Overall Height
374.50"
26th
4
v•
5th
302.50"
72.00'
.4
4th
72.00'
302.50"
ir-
230.50"
See ChM Fee
I
23040"
s.
3rd
158.50"
72.00'
Acklnersel
H
158.50"
7.
2nd
86.50"
70.50'
Hop Locators
.4
86.50"
>
1st
16.00"
16.00'
-
3
..<
72.00"
-..4-
72.00" -
-
72.00" -
1••••-
72.00" -
a...a-
70.50" -10a,
....-3
Than No oghl bet Met ilio island
HYDRAULIC
H
0
in
..i
16.00"
in
Wad Wm
Se Seethed
Here
I
':-,=.
:
- -
Conlimous
Sleel Tube
I
/Dow Heaver
-
•
Webbed Bette
Slub COlunIne
I of Hiegel
Will vary
- -
Winn:ors
bat
axiom
wo
.r..."-":"%tS?riM im
cf
Tee HS* Iwo bolts wee
tome Ind ewe Inn/ lode ode
side caLabl. The roman.") Wu
so bon Huge ea woo, or alit
n
l e
A De 10.25"
'
1-
Es 9.00^
i
i
-
I
"
i
I
214.25"
BB
210.75"
215.25"
F
CLEAR
OPENIN
H
213.00"
B
G
tO
a s
x
g
02
3
Hinge Style
r
I
S 91
-I
a
Ot
a
1.1•
tOa
.1 g
a .
g•
r,
7
1
E
y
'man/ now
A - 5W-0.00" CUSTOMERS FIUME') CLEAR °FENNO VaCT4
I.
i
Al
50'- 5.00"
BETWEEN HOE OOLUMNS
I
i
I
i
CNSIANCe
I
k
-
AA - 51% 2.00" OISMACE TO STAY MD( WITH ME S, CETING
1
EFTA01083250
N
r
RED-POWER
Phone: 900-746-8273 DOOR
Fax. 50/-426-1406 SPECS
schweissdoon- com
A-6
SPEC
SHEET
S
C
1
THE DOOR LEADER
S
S
Order Number:
Bid Number:
112112 BS
Bid Date:
11/21/12
Door Width
Door Height
Wedge
Overall Height
Door Style
Truss Type
Hinge Style
Tot W - Inches Tot H - Inches
50'-
1T-
10.25"
1T-10.25"
HYDRAULJC
H External Single Hinges
602"
214.25"
External Sheeting and Trim Provided By: Customer Responsibility
F —I"
o-,.
H —9.
F —.
,
Lc
..,-
.......
.....
A
c
0
s— B
0
51'
A- Head-Trim
vasealn
so
IS.
B- Base Trim
51'
A
Customers choice on base trim style.
Either style works well.
"K
If provided by Schweiss you will
receive "Base Trim".
`...
ear n
VAS
_
Oly
Length
C- Door Shooting
17
205.75"
D- Tek Screws
546
Fine Thread Tek Screws w/ Washer x 1.1/2" il Insulating
x 3/C If Not Insulating
6.
1
E- Sides of Door Trim
38'
*
r —
P—
—am
Special Sized J-Trin - See Dimensions
Sheeting Height
A
Leave your end wall open or un-sheeted until the door is Installed! If the end wall Is to be fully sheeted
before the door Is completed, do not nail or fasten the bottom of the sheets above the door frame.
Liner Sheeting and Trim Prov. By: Customer Responsibility
Flash For Liner Sheeting = Not Set-Up for Liner sheeting
,A
----->--1
.6.,--- -
F- Head-Trim
I
w06140
Oty
Length
(3- Door Sheeting
—
H- Tek Screws
Fine Thread Tek Screws w/ Washer x 3/4"
Upgrade
You
Schweiss
Only
1.
2.
3.
4.
5.
6.
7.
_112112
may
included
K
IN
K
O
K
K
10a9
Equipment - Customer's Choice
add any accessory o your Hydrualic Bi-Fold Door.
strongly recommends these accessories be used on every door.
Read the Schweiss
with your order if the box is checked
"Safety Information and Operation Manual"
Top Override Jiggle Switches
The Schweiss Hydraulic Doors Safety Information and
Electric Photo Eye Sensors
Operation Manual should be read by anyone involved in the
design, specifications, selection or purchase of an industrial
3 Button Automatic Switch
hydraulic door operator / system.
Door Base Safety Edge
Call Us If You Have Any Questions
Warning Lights and Horn
If you have any questions or comments about your hydraulic
Emergency Back-Alternate Power Couplers
door's safe operation or its design, call us at the numbers
listed at the top of the page and talk to our knowledgeable
12 Volt D.C. Emergency Back-Up Power Unit
staff at the factory.
EFTA01083251
Ei Verifying your building's opening to accept a Schweiss Hydraulic Door.
Before you attempt to install you hydraulic door, the building opening must have been prepared to accept a hydraulic door.
8
6
The measurments below are what Schweiss is expecting your opening to be based on the information that you provided (width and
io
height on the door contract).
It is very important that you double check these measurments along with the square opening to ensure that the door will fit in
your clear opening when it arrives.
Door Width
Door Height
Wedge
Overall Height
Door Style
Truss Type
Hinge Style
Tot W - Inches Tot H - Inches
50'-0.00"
10.25"
17-10.25"
HYDRAULIC
H External
Single Hinges
602"
214.25"
I
Order Number:
Bid Number:
112112-BS
Bid Date:
11/21/12
Distance Between Your Buikings Side Columns.
Al - Width
50= 5.00" . Width
IMPORTANT:
Both Al and A2 measurements must be exactly
RED-POWER DOOR
Phone: 800-746-8273
Fax: 507-426-7408
A2 - Width
50'- 5.00" . Width
the same and match your spec sheet.
Distance from the Finished Floor to the Bottom of the Buiding Header.
B1 - Height
17= 6.75" . Height
IMPORTANT:
Both B1 and B2 measurements must be exactly
B2 - Height
17'- 6.75" - Height
the same and match your spec sheet.
Verify that the Building Opening is Square.
Cl - Square-Up
gal- 4 68" = Diagonal
IMPORTANT:
Both C1 and C2 measurements must be
C2 - Square-Up S66"
= Diagonal
exactly the same and match your spec sheet.
---
I i i
{ 50 - 5.00"
Al-WIDTH
153c 4.66" I
53'- 4.66"
GI-SOUARE
G2-80UARE
117. 6.75' I
117'- 6.75"
B1-HEIGHT
82-HEIGHT
[ffitafkr_I
—
FLOOR LIME
* Cement floor must be level
* The measurements above represent the rough opening of your building
* All measurements must be inside measurements
EFTA01083252
Measuring your building's opening after cylinder legs are mounted.
With the cylinder legs mounted to the building you need to remeasure the clear opening, you should come up with the measurments
below. If the clear opening is not square, you need to make adjustments to square the cylinder legs vertically and front to back
when completely mounted.
I
50%0.00"
1T-0.00"
Door Width
I
Door Height
Order Number:
Bid Number:
1121124S
Bid Date:
11/21/12
iss RED-POWERDOOR SPECS A-8
SPEC
Phone: 800-746-8273
fax. 501-425 1408
schweissdoon- corn
EADER
SHEET
Ensure that your building Side Column is
square with the face of the building. But
Distance Between Your Cylinder Legs.
Al - Width
50'- 0.00" . Width
IMPORTANT: Both Al and A2 must
most importantly see to it that the
A2 - Width
50'- 0.00" . Width
be exactly the same.
1 8 0
Ci
a
l S.
ic
IIt
cylinder legs are 90 Deg. from the face
of your building.
Distance from the Finished Floor to the Bottom of the Door Header.
81 - Height
17'- 000" . Height
IMPORTANT: Both B1 and B2 must
I4---..„
82 - Height
17'- 0.00" . Height
be exactly the same.
17-10.25"
HYDRAULIC
H
i
i
I
_
p
height
I
fa
90 Deg. Verify that the Door Opening is Square.
STEEL I-BEAM
STEEL TUBE
or WOOD SIDE COL
)i
Cl - Square-Up 52'- 173" . Diagonal IMPORTANT: Both Cl and C2 must
C2 - Square-Up 52'- 9.73" . Diagonal
be exactly the same.
VERY IMPORTANT
The Hydraulic Cylinder Plate will
project into your building Ur at
shown below. Ensure that
there is no obstructions at this
[
\
the
height
scee' ee===
-----------'
I
i
i
Co 5
0
re
I
—I I
1
z
—
if
,
.
n
.,
o
c
ISIOVIDED COON MAIM Nana 11.1 IN DANGLE
50C
0 00 "
ID
.
Al -WIDTH
,
,,
1950"
2c
2c
0
I
I 17'- 0.00"
I ir- 0.00"
I
I
Tot W - Inches
Ill
82-KEDGITT
0
14' .06"
,,
.
10
a
io
9
-I
a
. 5.
re,
1
b5)17_0_,M_I---
f OOR Mt
L,
A2-WIDTH
V
0
-1 " Cement floor must be level
* The measurements above represent the rough opening of your building
* All measurements must be inside measurements
EFTA01083253
Technical Artifacts (9)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
scheeissdows.comDomain
schweissdows.comFax
Fax: 507-426-7408Phone
1987844 6869Phone
426-1406Phone
501-425 1408Phone
507-426-7408Phone
800-746-8273Phone
900-746-8273Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.