Punch List — per JE directives and Updates as of March 30, 2012Punch List — per JE directives as of December 24, 2011
Case File
efta-efta01107323DOJ Data Set 9OtherPunch List — per JE directives and Updates as of March 30. 2012
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107323
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List — per JE directives and Updates as of March 30. 2012
1. Bug —with proper rug pad for JE bath and original 3 guest room rugs - delivered to Tropical in NJ 3/23, sailing
4/4, EDA STT 4/7
2. Flagpole Bath and Cabana — slipcovers for sofa/cushion on site, piping around arm chairs requested — extra
fabric on LSJ 3/27
3. Five Palms
— Interior stucco — ongoing — require filler section at cabinets
- Electrical -ongoing
- Solar - estimate 3/9
- Floor — material ordered 3/23
- Doors location and fabrication — manufacturer has submitted a quote and shop drawings 3/23
- Lighting schedule
- Concrete top section completed
- Coral stone bull nosing ongoing - modeled after MC — in progress
- Big Slab installation completed (require 4 holes for trees — size required — completed)
- Fire pit work on hold until JE arrives
4. Grotto — steps demolished, starting hammer work and excavation, debris placed at dump site
— Concrete steps ongoing
- Determine shelter height — roof for Grotto shed
- Columns to be laid out by JE
5. Heli Garage — completed
6. Heli Road — saw cutting completed — wall extension in progress — 4/3
7. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it — containment for ISO
Fuel tank — bathroom and room divider —subcontractor for painting require,g
8. Steel Shed - have estimate for building, schedule to be forwarded 3/10
9. Triangle — needs more dirt — additional dirt added
10. Entry Tree Lights - confirmed ground lighting
11. Library Dehumidification — commences week of 12 Mar
12. Solutions for Generators -drawings complete for bid package
- generator room sound proofing, need to confirm schedule
13. Top of hill - CLEAN UP - remove rocks and hydroseed - hydro seeding 3/23
14. Tree Order - x 7 - 12ft and 3 — 15 ft Palms ordered per JE directive 3/23 — sailing 3/30, EDA 3/31
- X 2 15ft Palms to be placed at entrance area
15.11k! - Shields — check with Sarah for date, still pending
- Dock box in production
16. Sunken garden berm - continues — hydro seeded 3/23 — moving equipment to start layout
17. Concrete roads at flagpole — per JE build another ramp - completed
18. Bench placements — continues
19. Engineering clean up - continues
20. New vehicles — two more Polaris bikes (800's) — Larry/Brice
21. Dock decking — discuss pressure treated timber/carpeting
- investigate having movable sections
22. Aquarium photos Library — installed
23. Mars Cottage Roof work remains — completion 3/29
24. Mooring Permit — proceeding with bids to place anchors
25. Electrical quotes — forwarded to JE
- Glidden measured on 3/28 - should have price by next week
26. Rationalize Telephone system — Extension list completed, Voice mail set up at
Beach Office, Kitchen MC, Managers Cottage
EFTA01107323
27. Gates - to hide engineering both at top and bottom of hill
Bill reviewing light weight gates for bottom of hill — JE advises three 8 foot gates - bi-fold design running in
track on the ground - reauire design— contractor on site - measured on 3/30
28. Engineering service road reshaped - continues
29. Dock lighting - barn lights installation completed
30. Guest House at Beach 3 — sited
31. Chillax room — furniture piece required for electrical/media equipment
32. Replacement Transformer Mechanical building — have bid — reviewing shipping — Brice to finalize cost
comparisons — refurbishment versus new
33. Photos for Chillax bath — installed
34. floating Dock — substructure support in place and bolted (covered with wood)
- JE design to handle 2 jet skis
35. Midnight Express —trailer on site, Midnight Express resting in it
36. sundial - completed, awaiting further JE directive
37. Boats — Midnight —sell existing motors —ad placed in both Daily News (3/24-3/31) and Island Trader (3/29)
Purchase x 3 Yamaha 300 motors
-
PRD — sell
-
Calypso - refurbish
38. Sod — quoted with Deal Time (Adelbert Ledee) — on hold per JE
39. Motor court wall extension — completed
40. Hydro seeding— as much as possible especially when it rains
41. Bamboo - order bamboo in Puerto Rico - to put bamboo at least in the sunken garden berm as well as
other areas
EFTA01107324
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishWire Ref
refurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.