Skip to main content
Skip to content
Case File
efta-efta01110932DOJ Data Set 9Other

2119/12

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01110932
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
2119/12 Atlanta RefrIgenition Service Quote ARS Export Supply V QUOTE R . "TY Formerly Atlanta Refrigeration Service VI \ , 7350 Estate BoYeol, Suite I21C, St. Themes USVI 00802 \.) Tel: 340.775.9222 Fax:340.775.9122 Jab Location Little Saint James Little Saint James St. Tel:Mr Fax:. Quote Information We: Jul 30, 2012 ARS Quote ICS: 9828862 Submitted By: Kent Magee Submitted To: Original AM Inv": Original Call Date: 6/15/2012 We Submit Specific and Estimations for the Listed Below: Equipment Chiller 'Manufacturer: Cramer Modeler e ride: Description of Work Required: The following is a quote for the chiller In the library. We are proposing to return to site and remove the old chiller system. We will install the new airhandler, chiller, reheat system, controls and dampen. The Controls installed will what was provide by EMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep on site in case a replacement is needed. The new system will control the humidity of the library and control temperature property. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site lull must be provided also for unloading container and getting equipment Into place and ramming the old equipment. Thank . you for choosing ARS Export Supplyl Pal tones% r.:...i ptitn Canter Complete Chiller System Oiv 1.0 Total $48,501.20 Spare Carrier Chiller 1.0 $26,550.00 D0C Controller. Controls and Installation 1.0 $29,348.00 Duct work, Dampers, Materials 1.0 *845.00 All Piping, Valves, Hardware 1.0 $3,680.00 :that Installation Labor 1.0 $14,500.00 • Important Notes: Total Materials: $110,924.20 i Lead time is 10-12 weeks depending on Manufacture lead time on equipment. Once I epprowd 50% is due before any equipment will be ordered. Once equipment antes, 25% will be due before installation work can begin. Once project Is complete and I running anal 25% will be due. Total Total Misc./Welding: Total Labor: $14,500.00 Initial Call: Shipping/Freight: $4,500.00 Warranty Information: Subtotal: $129,924.20 i Manufacturer parts warranty and 30 day labor warranty on work performed Tax: Total: $129,924.20 FAX SACK SIGNED TO mitricriaadon COW Authorization: ARS Acceptance: ett.taillog.00mIdoksioteViewhO94328862 1/2 EFTA01110932

Technical Artifacts (7)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

FaxFax:340.775.9122
Phone340.775.9122
Phone340.775.9222
Phone4328862
Phone9828862
Wire RefRefrIgenition
Wire RefRefrigeration

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.