Atlanta RefrIgenition Service Quote
ARS Export Supply
V
QUOTE
R
.
"TY
Formerly Atlanta Refrigeration Service VI
\
,
7350 Estate BoYeol, Suite I21C, St. Themes USVI 00802
\.)
Tel: 340.775.9222 Fax:340.775.9122
Jab Location
Little Saint James
Little Saint James
St.
Tel:Mr
Fax:.
Quote Information
We: Jul 30, 2012
ARS Quote ICS: 9828862
Submitted By: Kent Magee
Submitted To:
Original AM Inv":
Original Call Date: 6/15/2012
We Submit Specific and Estimations for the Listed Below:
Equipment Chiller
'Manufacturer: Cramer
Modeler
e
ride:
Description of Work Required:
The following is a quote for the chiller In the library. We are proposing to return to site and remove the old chiller system. We
will install the new airhandler, chiller, reheat system, controls and dampen. The Controls installed will what was provide by
EMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep
on site in case a replacement is needed. The new system will control the humidity of the library and control temperature
property. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site
lull must be provided also for unloading container and getting equipment Into place and ramming the old equipment. Thank
. you for choosing ARS Export Supplyl
Pal tones%
r.:...i ptitn
Canter Complete Chiller System
Oiv
1.0
Total
$48,501.20
Spare Carrier Chiller
1.0 $26,550.00
D0C Controller. Controls and Installation
1.0 $29,348.00
Duct work, Dampers, Materials
1.0
*845.00
All Piping, Valves, Hardware
1.0
$3,680.00
:that
Installation Labor
1.0 $14,500.00
• Important Notes:
Total Materials:
$110,924.20
i Lead time is 10-12 weeks depending on Manufacture lead time on equipment. Once
I epprowd 50% is due before any equipment will be ordered. Once equipment antes,
25% will be due before installation work can begin. Once project Is complete and
I running anal 25% will be due.
Total
Total Misc./Welding:
Total Labor:
$14,500.00
Initial Call:
Shipping/Freight:
$4,500.00
Warranty Information:
Subtotal:
$129,924.20
i Manufacturer parts warranty and 30 day labor warranty on work performed
Tax:
Total:
$129,924.20
FAX SACK SIGNED TO
mitricriaadon
COW Authorization:
ARS Acceptance:
ett.taillog.00mIdoksioteViewhO94328862
1/2
EFTA01110932
Technical Artifacts (7)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Fax
Fax:340.775.9122Phone
340.775.9122Phone
340.775.9222Phone
4328862Phone
9828862Wire Ref
RefrIgenitionWire Ref
RefrigerationForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.