BORING NUMBER B-1
PAGE 1 OF 1
PROJECT NUMBER 17015.2
Nutting
1310 Neptune Drive
ia Engineers
)
Ttatheted k On Caren•••
FTBoy
eiephone
n. Ion Bea
: ch, Fl., 33426
r
—
CLIENT Labonte Construction
PROJECT NAME 358 El Brill° Way
PROJECT LOCATION 368 El Brill° Way. Palm Beach. Florida
DATE STARTED 8/19/15
COMPLETED 8119115
SURFACE ELEVATION REFERENCE —2' above Road Crown
DRILLING METHOD Standard Penetration Boring
GROUND WATER LEVELS:
LOGGED BY '1
_7,
e_t_t
CHECKED BY C. Gworek
VAT TIME OF DRILLING 5.0 ft
APPROXIMATE LOCATION OF BORING As located on site plan
DEPTH
GRAPHIC
LOG
MATERIAL. DESCRIPTION
&LE TYPE
NUMBER
Blows
0
O
lfZ
• SM. N VALUE A
10
20
30
40
PL
MC
LL
1-41-I
20
40
60
80
13 PINKS CONTENT 090
20
40
60
80
-
-
...
-
-
10
I., t ‘ TOPSOIL 3"
r
AU
11.2.19•!9
21
• •
Gray fine SAND, trace root
Tan fine SAND
AU
2
SS
3
•
A
A
SS
4
13.13.8.8
21
Gray One SAND
S
S
6
5-6-4-5
10
.
le
, -
"Ys
6 I
,n
vi k
LI
Uc g
&own PEAT
SS
a
4-6.5.13
13
•
•
15
,..,::..
•:.
•
Gray One SAND
X T
55
9.11.10.12
21
•
_
.
20
X
SS
8
10.12.12.16
24
Bottom of hole at 20.0 feet.
Nutting EnginesoptFlo643.inc. scants no liability_for tho conmentwithe ind000ndont intennitation of drilliog has by others
EFTA01113413
- LEGEND•
APPROX. TEST LOCATION
N UTTING
Labonte Construction
358 El Brillo Way
APPROXIMATE
E NGINEERS
358 El Brillo Way
TEST LOCATION
GEOTECHNICAL EXPLORATION
FIG. 1
OF FLORIDA. VW.
ESTABLISHED1W
Palm Beach, Florida
PLAN
PROJECT NO. 17352.1
EFTA01113414
REPORT OF
GEOTECHNICAL EXPLORATION
PROPOSED RESIDENCE ADDITIONS AND RENOVATIONS
358 EL BRILLO WAY
PALM BEACH, FLORIDA
FOR
LABONTE CONSTRUCTION
4165 LINDEN AVENUE
PALM BEACH GARDENS, FLORIDA 33410
PREPARED BY
NUTTING ENGINEERS OF FLORIDA, INC.
1310 NEPTUNE DRIVE
BOYNTON BEACH, FLORIDA 33426
ORDER NO. 17025.2
AUGUST 2015
Nutting
Engineers
of Florida Inc.! Established 1967
Your Project is Our Commitment
Geotechnical & Construction Materials
Engineering, Testing & Inspection
Environmental Services
Offices throughout the state of Florida
EFTA01113415
Nutting
Engineers
of Florida Inc.' Established 1967
Your Project Is Our Commitment
1310 Neptune Drive
Boynton Beach, Florida 33426
Toll Fret:
Fax:
Etrowara.
St. Lucie
Miami-Dade
tata
August 21, 2015
:35
76
Mr. Daniel Labonte
Labonte Construction
E
4165 Linden Avenue
o
Palm Beach Gardens, Florida 33410
3
Phone
Email:
Subject:
Report of Geotechnical Exploration
o
Proposed Residence Additions and Renovations
358 El Brillo Way
a
Palm Beach, Florida
Dear Mr. Labonte:
57)
Nutting Engineers of Florida, Inc. (NE), has performed a Geotechnical Exploration for the
proposed residence additions and renovations at the above referenced site in Palm Beach,
ch
Florida. This exploration was performed in accordance with the verbal authorization to proceed
provided by Labonte Construction dated August 13, 2015. This evaluation was performed to
r..
develop information regarding subsurface conditions at specific test locations which along with
proposed construction information provided was used to develop opinions regarding earthwork
c
procedures and foundations for support of the proposed construction. This report presents our
findings and recommendations based upon the information examined at the time of this
76
evaluation.
r,
PROJECT INFORMATION
We understand that plans include the construction of various additions and renovations to the
existing residence. These may include some new interior and exterior footings along with some
load increases on some existing foundations. We also understand that some settlement has been
observed on some existing foundations; therefore some remediation to existing foundations will
also be performed. We understand that other engineers have reviewed this condition to provide
remediation recommendations. Plans pertaining to the proposed construction were not provided
at the time of this report. It is not known the type of foundation system that was used to support
the existing residence; however it has been brought to our attention that recent construction in the
.c
area has required deep foundation support.
O
L9
OFFICES
Palm Beach
Miami-Dade
St. Lucie
EFTA01113416
NE should be notified in writing by the client of any changes in the proposed construction along
with a request to amend our foundation analysis and/or recommendations within this report as
appropriate.
GENERAL SUBSURFACE CONDITIONS
Soil Survey Maps
As part of the geotechnical exploration, we have reviewed available Soil Conservation Service
(SCS) survey maps for Palm Beach County. These SCS maps provide qualitative information
about potential general shallow soil conditions in the project vicinity. This information was
derived from approximately 6 ft. deep manual auger borings, aerial photo and surface feature
interpretation at some point in the past (mid 1980's to early 1970's). The SCS data may or may
not reflect actual current site conditions. A review of the Soil Survey for Palm Beach County
revealed that at the time the survey was conducted, the soils at the site were described as Arents-
Urban land complex. These soils are described as nearly level, somewhat poorly drained sandy
soils that were either dredged from nearby waterways or imported from other areas and used for
fill material. The areas could have possibly been previous organic marshes and swamps that were
filled with a heterogeneous overburden material for urban land use. We note that the soil surveys
were typically penetrated to a depth of approximately six feet.
Subsurface Exploration
NUTTING ENGINEERS OF FLORIDA, INC. performed one Standard Penetration Test (SPT) boring
(ASTM D-1586) to a depth of twenty feet, the limits of portable tripod equipment. We note that
additional test borings were proposed; however per the homeowner's specification and to greatly
limit the potential for damage to the existing landscaping, our office could only complete one test
boring. We note that this can affect our recommendations; therefore additional borings arc
recommended. The location of the test boring is indicated on the boring location plan presented
in the Appendix of this report. The boring location was identified in the field using approximate
methods; namely, a measuring wheel and available surface controls. As such the soil boring
location should be considered to be approximate.
We note that due to the potential for underground utilities at the test boring location the upper
four feet of the soil profile was manually cleared. Because of this, the relative density (N-Value)
of the upper four feet was not obtained.
Test Boring Results
In general, the test borings recorded a surface layer of topsoil underlain by loose to medium
dense gray to tan sand to a depth of ten feet. From ten to thirteen feet soft brown peat was
encountered. Below thirteen feet medium dense gray sand was encountered to a depth of twenty
feet, the maximum depth explored.
113
Engineers
Nutting
of Fbrlda Inc.' Estabisbed 1967
2
EFTA01113417
Note: Substantially different subsurface conditions may exist at other areas of the site. Buried
debris may or may not be identified or adequately delineated by soil borings. Test pit excavation
can provide more insight into such conditions and rock lithology if present. Such conditions may
be revealed during site development activities (e.g. proof rolling, utility & foundation excavation
activities) or other related activities. Should additional assurance be desired by the client, further
subsurface investigation could be performed.
Groundwater Information
The immediate groundwater level was measured at the boring locations at the time of drilling.
The groundwater level was encountered at approximately five feet below the existing ground
surface.
The immediate depth to groundwater measurements presented in this report may not provide a
reliable indication of stabilized or a more long term depth to groundwater at this site. Water
table elevations can vary dramatically with time through rainfall, droughts, storm events, flood
control activities, nearby surface water bodies, tidal activity, pumping and many other factors.
For these reasons, this immediate depth to water data should not be relied upon alone for project
design considerations.
ANALYSIS AND RECOMMENDATIONS
The limited test boring performed for the project suggests that a three foot stratum of son peat
soils is present at depths of ten to thirteen feet below the existing ground surface. Due to the
high compressive nature of the organic soils and limited information pertaining to the existing
residence and new construction, it is our recommendation that the new addition, and any other
new foundation construction be supported upon a deep foundation system.
Demucking/refilling was considered however, due to the dcpth of removal, the location of the
addition to existing foundations, and the level of the water table, this method does not appear to
be economically feasible. Driven, precast concrete piles were also considered however, the
vibrations transmitted during the installation of this type of pile could distress the existing
residence and nearby structures.
Due to the limited space available for construction equipment to access the areas, we have
provided recommendations for helical piers for support of the proposed construction. Other
alternatives are available including augercast piles or pin piles; however it is our opinion that
helical piers are the best alternative for this project.
The decision as to which foundation type will be best for this project will depend on
accessibility, cost, structural loading conditions, and other factors.
We recommend that
discussions be held with us and other interested parties to determine the best alternative for this
project. The following sections present our recommendations for the foundation.
e
3e
NuttingI
Engineers
oi
aintitStabhihed1967
3
EFTA01113418
Helical Piers: Helical Piers consist of a galvanized steel shaft with an eight-inch (can be
variable) plate on the bottom, called a helix. The shaft and helix are hydraulically augured into
the ground with a measured amount of torque. The torque used to install the helix can be
converted to the amount of weight that the pier can hold. Helical anchors can provide an
allowable compressive capacity of up to 15 tons when installed to competent material. Based on
the test boring performed and due to the soft peat layer, helical piers will need to be installed to
depths of approximately twenty feet or more below the existing ground surface. Due to the
limited amount and depth of test borings performed at the site, more accuratc pier depth
estimates cannot be provided at this time. If more accurate estimates are needed than our office
needs to be allowed to perform a test boring with truck mounted drilling equipment to a depth of
thirty to thirty-five feet.
This type of pile is generally used where accessibility is limited, and in small addition areas,
where only a few piles are needed. The shaft size and number of helices are variable and are
designed to meet the needs of each individual project, therefore, the structural loads, and
preliminary layout will need to be accomplished prior to determining the helical pier
configuration.
The installation of the pile system must be monitored by a representative of Nutting Engineers
on a full-time basis to verify that the engineering intent is accomplished.
GENERAL INFORMATION
Our client for this geotechnical evaluation was:
Mr. Daniel Labonte
Labonte Construction
4165 Linden Avenue
Palm Beach Gardens, Florida 33410
The contents of this report are for the exclusive use of the client and the client's design team for
this specific project exclusively. Information conveyed in this report shall not be used or relied
upon by other parties or for other projects without the expressed written consent of Nutting
Engineers of Florida, Inc. This report discusses geotechnical considerations for this site based
upon observed conditions and our understanding of proposed construction for foundation
support. Environmental issues including (but not limited to), soil and/or groundwater
contamination are beyond our scope of service for this project. As such, this report should not be
used or relied upon for evaluation of environmental issues.
ri
t
3E
of Florida Inc. I Established 7967
Nulling
Engineers
4
EFTA01113419
No pile shall have a tip elevation higher than the recommended elevation without first contacting
Nutting Engineers of Florida, Inc. in writing so that they may analyze any proposed changes. If
Nutting Engineers of Florida, Inc. is not contacted regarding a change in pile tip elevations (or
pile diameters) as indicated in this report, the geotechnical engineer/ piling contractor initiating
this change will be responsible for the redesigned pile capacity and performance.
Furthermore, if the tip elevation is raised, a pile load test shall be performed at that location
where the test borings indicate the least favorable conditions. If the pile design is changed
without our knowledge, Nutting Engineers of Florida, Inc. is no longer the geotechnical engineer
of record.
If conditions are encountered which are not consistent with the findings presented in this report,
or if proposed construction is moved from the location investigated, this office shall be notified
immediately so that the condition or change can be evaluated and appropriate action taken.
Excavations of five feet or more in depth should be sloped or shored in accordance with OSHA
and State of Florida requirements.
The Geotechnical Engineer warrants that the findings, recommendations, specifications, or
professional advice contained herein, have been presented after being prepared in accordance
with general accepted professional practice in the field of foundation engineering, soil mechanics
and engineering geology. No other warranties are implied or expressed.
We appreciate the opportunity to be of service on this project. If we can be of any further
assistance, or if you need additional information, please contact us at your convenience.
Sincerely,
NUTTING ENGINEERS OF FLORIDA, INC.
tar-
Christopher E. Gworek, P.E.
Senior Engineer
Director of Engineering
Appendix:
Boring Location Plan
Test Boring Result
Limitations of Liability
Soil Classification Criteria
REP IABONTE CONSTRUCTION 358 EL BRILLO WAY PB PIERS CEG
li
lt
iimmig)
of Florida Inc. ' Established 1967
Nutting
e Engineers
$
n
Richard C. Wohlfarth, P.E. 050858
EFTA01113420
S0I1. AND ROCK CLASSIFICA'I'I0N CRITERIA
113
SAND/SILT
II -VALUE
f 0PD
RELATIVE
DENSITY
0-4
Very Loose
5
10
Loose
II - 29
Medium
30 - 49
Dense
>50
Vay dense
100
IleNISal
ROCK
CLAY/SILTY CIA\
N -VALUE
MED
UNCONFINED COMP.
STRENGTH 010
CONSISTENCY
<2
<0.25
v. Soft
2 - 4
0_25 - 0.50
Soft
5 - 8
0 50 - 1.00
Medium
9 - 15
1.00
2.00
Soft
16 -30
100 - 4.00
v. Stiff
>30
>4.00
Hard
N -VALUE
(bPD
RELATIVE
HARDNESS
ROCK CHARACTERISTICS
N:- 100
Hard to v. bold
Local !Oa( lOtllUlliCMS vary in Ilan:loess from soft to rely hard within short vet li.
cal and hotirental distances ard often contain vatic-al solution boles of 3 to 36
inch diameter to varying depths and honzotital solution fratmes
Rock may be
brittle to split spoon impact, but more resistant to excavation.
25<N< 100
Medium hard to hard
5<N <25
Soft to medium hard
PARTICLE SIZE
DESCRIPTION MODIFIERS
Boulder
>12 as.
0 - 5%
Slight trace
Cobble
3 to 12 in.
6
10%
Trace
Gravel
4.76 tam to 3 in.
II - 20%
Little
Sand
0.074 nun to 4.76 min
21 35%
Some
Silt
0.005 mm to 0.074 nun
>35%
And
Clay
<D005 rams
Mai..0lvbon,
Group
Symbol.
Typical Range.
tabs/Glory claniticelbin 41,64:0
.0
7
-
u
; `
8 2
Gw
w.....uodo. as../.. 9....040'd
...int
Wee a •4 liewi
4
-
(D..)1
C. • .—.0 realer Ulna 4:c w
helmeted and3
D,„
D,,,ID,
•
• • ..
i b
i ;
V .i
or
o•••ty reeled Waal. r•••Ilond
nibe•rob stilt p.m lbw
f •
a ;
*
Het se•gro. all rodeskesnquinamanis la GW
2
° II
i
OW' I
Sky gong; oraniscrebsIN
:4 8
"
Alledwrg Fin 1*w 'A'
1
k
...
1
'6
Agana°
1; I
N X g
I
tea el win...a
More 'A' ie. ..i.• PA
*Wrenn
.4 7 ... meek.
I I
; t
a 3
_
it
-- i
1
a
4
GC
<Non 'moo; ......-....3.cso
" ' kn.
S g
%kg
i 9 6. si
a
g
Aa•4044 0 liWils oboit W
,,,,, _,,,,
II snow. Mon 7
... It OHM ,..".4,A, .... of
Sa l "....h.
i l
f li
wusgooemil ono., cant/ lands.
WV or eo lims
I
I
I
1 .-it,
f
4
D
C,, = --Monona. ilon 6;C,
13"
(D f
.. S
&ninon I and3
MoD,
1
... p
9 .1
•
as
u iti.
V
Poorly goebd meas. Agee.*,
....N. ion. od so b.a.
slip ,
11 .1
i
I
II
NV meetly ell rolled.. ro4pborosols In SW
I
i U.
Jai
‘S.
...., neko. d al I V
ill
iii
Moser° Aga. bil.ove 'A"
it
1 l
i
tee oe PI Ins mhos 4
Limits plesail h
[Aga
wit Pt Irsertet.4 4 nu] 7 two
;
I 1 i
SC
Geri wed; wat-itoralancl
IS i A .5,r
.? a.
forte° limn obairW
. WA Pa -w. *aril
bee* IlUr ttttt enta..... •••
of thel
o-pa
n
t
g
inbrgosk alien/ n•r fr. onto.
J.. Ow. soy of dOY•T h” Kr,
3
71
a dent Sal Mt tlIght platikly
Ag
1
3 q
deo of bye lo ...on
F,
b
A i
C.
otaincar.araver dal% nada.
Ain dkr den Seniar.
a.
;
ri ,0
3
ot
Goipmst an end nag. sit oar
of •••• plossirk,
i
l
Inoroot..
Y3
slis. 44e4446•1 44 illblebts•
cows floe bbulp a lay nab r
'
:nn
1 13
• .1
a
i t
I
CH
144...14 den or wk plostgisy. la
t
tk
t
SI k
4071
to'
..
OTIVek Sit
...a.... W
o
Mt ••4 C.I.
k
On
el
•
oh
**lit
no* an
•
••
•
•o
so
0.'"*" .
••
i.
•11
ft
I*
ill
I I
Pads amlapbw kV.? work io•
PloOkil Chad
lulling
mincers
6.0.4•4
EFTA01113421
LIMITATIONS OF LIABLILITY
WARRANTY
We warranty that the services performed by Nutting
Engineers of Florida, Inc. are conducted in a manner
consistent with that level of care and skill ordinarily
exercised by members of the profession in our area
currently practicing under similar conditions at the time our
services
were
performed.
No
other
warranties,
expressed or implied, aro made. While the services of
Nutting Engineers of Florida, Inc. are a valuable and
integral part of the design and construction teams, we do
not
warrant,
guarantee
or
insure
the
quality,
completeness, or satisfactory performance of designs,
construction plans, specifications we have not prepared,
nor the ultimate performance of building site materials or
assembly/construction.
SUBSURFACE EXPLORATION
Subsurface exploration is normally accomplished by test
borings; test pits are sometimes employed. The method of
determining the boring location and the surface elevation
at the boring is noted in the report. This Information is
represented In the soil boring logs and/or a drawing. The
location and elevation of the borings should be considered
accurate only to the degree inherent with the method used
and may be approximate.
The soil boring log includes sampling information,
description of the materials recovered, approximate
depths of boundaries between soil and rock strata as
encountered and immediate depth to water data. The log
represents conditions recorded specifically at the location
where and when the boring was made. Site conditions
may vary through time as will subsurface conditions. The
boundaries between different soil strata as encountered
are indicated at specific depths; however, these depths
are in fact approximate and dependent upon the frequency
of sampling, nature and consistency of the respective
strata. Substantial variation between soil borings may
commonly exist in subsurface conditions. Water level
readings are made at the time and under conditions stated
on the boring logs. Water levels change with time,
precipitation, canal level, local well drawdown and other
factors. Water level data provided on soil boring logs shall
not be relied upon for groundwater based design of
construction considerations.
LABORATORY AND FIELD TESTS
Tests are performed in general accordance with specific
ASTM Standards unless otherwise indicated. All criteria
included in a given ASTM Standard are not always
required and performed. Each test boring report Indicates
the measurements and data developed at each specific
test location.
iNutting
utt
n ears
KIX PSI !IOW CariallUi
ANALYSIS AND RECOMMENDATIONS
The geotechnical report is prepared primarily to aid in the
design of site work and structural foundations. Although
the information in the report is expected to be sufficient for
these purposes, it shall not be utilized to determine the
cost of construction nor to stand alone as a construction
specification.
Contractors
shall
verify
subsurface
conditions as may be appropriate prior to undertaking
subsurface work.
Report recommendations are based primarily on data from
test borings made at the locations shown on the test
boring reports. Soil variations commonly exist between
boring locations. Such variations may not become evident
until construction. Test pits sometimes provide valuable
supplemental information that derived from soil borings. If
variations are then noted, the geotechnical engineer shall
be contacted in writing immediately so that field conditions
can be examined and recommendations revised if
necessary.
The geotechnical report states our understanding as to the
location, dimensions and structural features proposed for
the site. Any significant changes of the site
improvements
or
site
conditions
must
be
communicated in writing to the geotechnical engineer
immediately so
that
the
geotechnical
analysis,
conclusions, and recommendations can be reviewed and
appropriately adjusted as necessary.
CONSTRUCTION OBSERVATION
Construction observation and testing is an important
element of geotechnical services. The geotechnical
engineer's field representative (G.E.F.R.) is the 'owner's
representative" observing the work of the contractor,
performing tests and reporting data from such tests and
observations.
The
geotechnical engineer's
field
representative does not direct the contractor's
construction
means,
methods,
operations
or
personnel. The G.E.F.R. does not interfere with the
relationship between the owner and the contractor and,
except as an observer, does not become a substitute
owner on site. The G.E.F.R. is responsible for his/her
safety, but has no responsibility for the safety of other
personnel at the site. The G.E.F.R. is an important
member of a team whose responsibility is to observe and
test the work being done and report to the owner whether
that work is being carried out in general conformance with
the plans and specifications. The endosed report may be
relied upon solely by the named client.
EFTA01113422
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
8119115Wire Ref
REFERENCEWire Ref
referencedWire Ref
refillingForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.