Case File
efta-efta01141652DOJ Data Set 9OtherAAAAAAAAA
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01141652
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
AAAAAAAAA
A
V
A
T
I
0
N
Work Scope Agreement
Stambaugh Aviation and JEGE
1.0
Introduction
1.1
The purpose of the following proposal is to offer pricing for out of phase
work to extend C check induction on aircraft N908JE, per supplied
maintenance tally.
2.0
Maintenance
2.1
Labor pricing
4A check Routine Inspections
Associated Non-routine defect correction
100 hour cap per item
$12,500.00
$12,500.00
Battery deep cycles and replacements
$ 3,000.00
2013-18-09
2005-05-19
2006-13-16
2008-11-09
2008-04-10
Honeywell ELT
wing spars
aileron tabs
cockpit windows
over center wing wire insp.
Pitot Static/Transponder 91.411 and 91.413 (RVSM)
APU requirements
$
200.00
$ 8,500.00
$ 2,000.00
$
800.00
$15,000.00
$ 6,500.00
$ 1,000.00
Total labor
$62,000.00
2.2
The Labor rate set for this program is $50.00 per man hour and $68.50 for
premium time as authorized by the customer for work over and above the
fixed labor pricing
2.3
SAI warrants all workmanship for 1000 flight hours or 1 year
2.4
The fixed labor costs include all labor to perform the duties of the work
cards listed in the supplied work scope. SAI supplied materials and
outside services will be invoiced per section 3.0 materials.
1000 Jetport Rd. Brunswick, Ga. 31525 912-265-7244
FAA Repair Station Certificate EB I RIO7K
EFTA01141652
STAMBAUGH
3.0
Materials
A
V
I
A
T
I
0
N
3.1
All Materials and outside services (NDT, complex machining, welding)
for this program will be invoiced at cost, plus a 15% markup, plus freight.
3.2
All Materials supplied by the customers will be handled at no cost
3.3
Consumable materials which include rags, paper towels, lubricants,
common washers, nuts, rivets, screws of less than $1.00 per are billable at
3% of the total labor costs.
4.0
Scheduling
4.1
The scheduling for the proposed work scope is 10 calendar days. SAI is
not responsible for vendor delays on kits, parts, or components. SAI will
put forth a maximum effort to ensure a timely delivery.
5.0
Payment Terms
5.1
The payment terms will be in accordance with the following:
50% of labor costs upon induction
Balance of labor and materials at delivery
JEGE
Stambaugh Aviation
Title
Title
Date
Date
1000 Jetport Rd. Brunswick, Ga. 31525 912-265-7244
FAA Repair Station Certificate EB I RIO7K
EFTA01141653
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
912-265-7244Tail #
N908JEForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.