Well B 50gpm Upgrade

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01172578
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Well B 50gpm Upgrade Pump Upgrade 7,600.00 3 Phase Converter 5,000.00 Tough Shed 2,500.00 Electrical Relocation to Shed and Well S 7,000.00 Well 4 Refurbishment Metal Building $ 40,000.00 Permiting $ 500.00 Booster Pumps $ 38,000.00 10,000 Gallon Tank $ 10,000.00 Pipping 5,000.00 Electrical 25,000.00 Project Total 140,600.00 EFTA01172578 Water Distribution and D.evelopromit Plan The proposed changes & upgrades to the Ranch's Water Distribution System are recommended to maximize the Existing Well pumping capacities, storage capacities & Permitted Water Rights, which total 83.5 AM As of date Combined Well production levels are Estimated at 119 gpm Combined Storage Capacity is 40,000 gallons Reminder: When calculating usage, the Ranch does not operate it's Well Fields 24/7 and the irrigation season is approx. 8 mths of the year Development Plan Phasel This is re_quiredto, meet Existing Demand Add a 6" pipeline from Well 4, B & K storage tanks (15000 gallons) to RC. This will increase pumping capacity to RC & Mli Reservoir without the initial need to replace existing pump skid at Wells 4, B & K Downsize the Well Pump at Well 6 from 75gpm to a 30gpm Pump, connect via 4" pipeline to the Dakota storage tank (10.000 gallons) & pump skid Downsizing the Well Pump is necessary due to the decreased pumping levels at Well 6 Connecting Well 6 to Dakota storage & pumps will increase the Ranch's storage capacity to 50.000 gallons. Estimated Cost for Phase 1 is/36,966,13-_Revisecl cost now 27,678.91 This does not include trenching, which will be performed with Ranch equipment & personnel or legal/administrative fees Phase 2 This is required to meet 50% of permitted allotment under Permit E-7871 It will be necessary to have the infrastructure completed by Nov 1 2015 to meet Beneficial Use requirements, under the Settlement Agreement for E-7871 There will be a need for Administrative changes to Well B's Permit Increasing pumping capacity of Well B to SOgpm, this will give a combined Well rapacity of 150 gpm Increase storage capacity with a new 10.000 gallon [ant New Well Controller, pump skid and power upgrade to deliver water to RC, MIL IN, Lodge, Log Cabin & Ranch related uses New storage Facility to house pump skids, storage & power. Similar to the Metal Shed located at Dakota Well. Breakout ground & irrigate under Permitted conditions for E-7871 Estimated Cost for Phase 2, TBA This does not include Hydrology, Legal or Administrative Fees. EFTA01172579 Phase 3 The Principle has elected to proceed with applying for the full 68 afa, under permit E-7871. Addition ground will need to be irrigated to achieve the 68 afa. A New Well maybe required to replace the existing E-7871 Dakota Well There will Administrative and Hydrology costs involved The Estimated cost for Phase 3, TBA EFTA01172580

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.