Well B 50gpm Upgrade
Pump Upgrade
7,600.00
3 Phase Converter
5,000.00
Tough Shed
2,500.00
Electrical Relocation to
Shed and Well
S
7,000.00
Well 4 Refurbishment
Metal Building
$
40,000.00
Permiting
$
500.00
Booster Pumps
$
38,000.00
10,000 Gallon Tank
$
10,000.00
Pipping
5,000.00
Electrical
25,000.00
Project Total
140,600.00
EFTA01172578
Water Distribution and D.evelopromit Plan
The proposed changes & upgrades to the Ranch's Water Distribution System are
recommended to maximize the Existing Well pumping capacities, storage capacities
& Permitted Water Rights, which total 83.5 AM
As of date Combined Well production levels are Estimated at 119 gpm
Combined Storage Capacity is 40,000 gallons
Reminder:
When calculating usage, the Ranch does not operate it's Well Fields 24/7 and the
irrigation season is approx. 8 mths of the year
Development Plan
Phasel
This is re_quiredto, meet Existing Demand
Add a 6" pipeline from Well 4, B & K storage tanks (15000 gallons) to RC.
This will increase pumping capacity to RC & Mli Reservoir without the initial need
to replace existing pump skid at Wells 4, B & K
Downsize the Well Pump at Well 6 from 75gpm to a 30gpm Pump, connect via 4"
pipeline to the Dakota storage tank (10.000 gallons) & pump skid
Downsizing the Well Pump is necessary due to the decreased pumping levels at
Well 6
Connecting Well 6 to Dakota storage & pumps will increase the Ranch's storage
capacity to 50.000 gallons.
Estimated Cost for Phase 1 is/36,966,13-_Revisecl cost now 27,678.91
This does not include trenching, which will be performed with Ranch equipment &
personnel or legal/administrative fees
Phase 2
This is required to meet 50% of permitted allotment under Permit E-7871
It will be necessary to have the infrastructure completed by Nov 1 2015 to meet
Beneficial Use requirements, under the Settlement Agreement for E-7871
There will be a need for Administrative changes to Well B's Permit
Increasing pumping capacity of Well B to SOgpm, this will give a combined Well
rapacity of 150 gpm
Increase storage capacity with a new 10.000 gallon [ant
New Well Controller, pump skid and power upgrade to deliver water to RC, MIL IN,
Lodge, Log Cabin & Ranch related uses
New storage Facility to house pump skids, storage & power. Similar to the Metal
Shed located at Dakota Well.
Breakout ground & irrigate under Permitted conditions for E-7871
Estimated Cost for Phase 2, TBA
This does not include Hydrology, Legal or Administrative Fees.
EFTA01172579
Phase 3
The Principle has elected to proceed with applying for the full 68 afa, under permit
E-7871.
Addition ground will need to be irrigated to achieve the 68 afa.
A New Well maybe required to replace the existing E-7871 Dakota Well
There will Administrative and Hydrology costs involved
The Estimated cost for Phase 3, TBA
EFTA01172580
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
RefurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.