Skip to main content
Skip to content
Case File
efta-efta01173170DOJ Data Set 9Other

DS9 Document EFTA01173170

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01173170
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
I o: .Attention: From: Freedom Air International Larry fisnski PremlAIr Commercial Department Email:• Fax No: Fax No: -1- 44 (0)1252 1354:229 ESTIMATE No_ PA E/IFI EI/1 0001 227,1 -1C dated 1 8-01 -201 2 Aircraft Feeigistration:N901RL PremiAir Aircraft Engineering Ltd is pleased to provide an estimate as follows: - Work order: TEIC I asks: (Description: To Carry out Maintenance regarired hrinorrin toe nimratt l in to a flying condition. Labour: 321 hrs ti„) £75.00/hr 1. To Perform b0/100/160/300/000 Hour and 12/24 fkilc-Inth insp. 2. To Provide and install x1 -rail Rotor Blade. 3. To Overhaul Autopilot servos, to remove/refit 4. To Refurbish Wheels and Brakes. Repaint sliver. 5. To Replace x3 Tyros, 0. To Remove Existing Particle separator arid Install II5F System, 7. To Replace Pilots I legated Windscreen, 8. To Carry Out Sample Testing of Cngines and Gearbox oils, 0_ To Carry out Main Rotor Track and Balance (Inc in item 1.) 10. To Inspect the Main Rotor Hub for Corrosion (Inc in itom 1.) 11. To Replace x3 TROS bearings, 12. To Carry out Main Oriveshaft Strip/Inspect/Rebuild and Dynamic balance. Part costs as above 2. To Provide and install x1 Tail Rotor Blade, $34, 643. 70" 3 To Overhaul Autopilot servos, to remove/refit $ 86. 250. 00" 4. To Refurbish Wheels and Ftral-cenx. itepaint salvor, $5,080.70 5. To Replace x3 Tyres. $2,000_00 .S5 f, /CPU. 00"r" G. To Remove Existing Particle separator and Install IBF System, 7. To Replace Pilots Heated Windscreen, $61,4913 55" 8. To Carry Out Sample Testing of Errstiries and Gearbox oils. £200.00 11. To Replace x3 TROS bearings, $8,414.55 Total $255,5137.50 £24,275_00 £24,075.00 Should you have any technical queries pleas contact the Commercial department. Should you wish to proceed, please return a fax number: 4-44(011262 864229 or email: e contact Engineering, and for Commerci -al issues please duly signed and datod copy of this estimate by return to naecommercialCa)rsrennlair cresaincorino.com ONLY TERMS a CONDITIONS - Labour charges are not inclurded in this estimate unless • PrerniAir Standard Conditions of Trading for the otherwise stated above. snue rat a- cods and services apply - Valid rat 30 days, subject to prior sale or withdrawal • Overhaul prices are for Standard Overhaul only • Price quoted exclusive of VAT al current rate • Errors and Omissions Fxrepferf - price quoted exclusive of freight/import/exporL & duties • Exchange items subject to supplementary billing • Payment Terms: SO% on signing of Estimate, Prior to work aaaaaa enciou, Balance on completion. Note: Items marked with ("46) in accordance with ForesniAir policy ally items over $30,000.00 payment ire Advance on signing of astrimatc", prior to work commencing. PrerniAir Aircraft Etwatacrirsa nes Fleasalnnnta AvIntleset centre Slacichtishe Airport Camberley Stnrruy OU17 9L0 United Kingdom Tel: .44 (0) 1 l'aff,7 ASICIORA Far 144 (0) 1262 8C54:399 email: intoaprerniair-anoineerinp.corn Web: %An...eve-pram.° ill MN sUitb•• mgrinri. corn Ftsauimil•orrni ^rich -eases: Sixth Floor, 90 Fetter Lana, Lensele-an Ce4A1 No. 1128280 EFTA01173170

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaincresaincorino.com
Tail #N901RL
Wire RefRefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.