August 8, 2012
Private Residence
Attention:
Subject:
Dear Merwin;
wIr tai (6904,044. a;te
Mr. Merwin Dela Cruz
HVAC Project
Pursuant to our recent discussions and on site survey, Crystal Comfort would like to offer this
proposal for upgrades to the existing HVAC equipment located at this residence. Specifically, we
will replace the existing cooling tower, then change the old Carrier electric chiller to a
Multistack module. In addition we will be adding a sand filter to the condenser water loop.
Statement of Work:
•
Disconnect the two fan sections of the BAC cooling tower on the roof. Remove sections
by crane. Then rig new sections into place.
•
Re-connect piping & electrical. Redo insulation where necessary.
•
Install new variable frequency drives for the tower fans.
•
Provide full site protection in the hallways, elevator and MER during the course of all
indoor work.
•
Remove and replace the cooling tower sump located in the basement.
•
Perform a complete demolition of the existing Carrier chiller in basement. Remove all oil
& refrigerant as per EPA standards.
•
Deliver and install a new Multistack MS030-407c module which will be a part of the
existing two modules.
1
EFTA01180140
Mr. Merwin Dela Cruz
•
Make necessary piping & electrical connections. Insulate as required.
•
Install a new PEP sand filter in the basement. Tie into the condenser water loop. Run
power feed to unit.
•
Start and commission all equipment.
•
Clean off job site.
•
Provide warranty on all work for a period of one year. The Multistack compressors will
have a five year warranty (parts only).
•
Provide a DOB filing and equipment use permit.
For this work we quote $219,000.00 (Two Hundred Nineteen Thousand Dollars) as a Capital
Improvement Project.
Payment terms shall be as per AIA contract and schedule of values.
CONDITIONS
•
Performance or capacity testing is excluded.
•
All work is to be performed on a straight time basis.
•
Customer is to provide safe and unobstructed access to the work area.
•
Any ASHRAE-15 upgrades or ventilation upgrades required to comply with local and
current building code are not included.
•
Owner must make available a spare circuit breaker for sand filter power.
Should you have any questions or concerns, feel free to contact me at your convenience.
Regards,
' inetcOuvut):).
Joseph DeMaio
Vice President
2
EFTA01180141
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refrigerantRelated Documents (6)
DOJ Data Set 11OtherUnknown
EFTA02585986
2p
DOJ Data Set 9OtherUnknown
From: Austin Hill <I
1p
DOJ Data Set 11OtherUnknown
EFTA02615598
1p
DOJ Data Set 11OtherUnknown
EFTA Document EFTA02213696
To: Merwin Dela Cruz r Cc: From: Lesley Groff Sent: Thur 6/1/2017 3:34:00 PM Subject: Do not Change 3M's code says she was in her apartment yesterday to grab some personal items—she does not need the code changed to her apartment, but she does want you to get a new lock for her personal closet... Thank you IIII for letting me know the apt looked a bit `used' I think may have thrown some items on the bed as she was determine what to take with her...the lock broke on her personal closet when
1p
DOJ Data Set 11OtherUnknown
EFTA02328690
1p
DOJ Data Set 11OtherUnknown
EFTA02237320
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.