Skip to main content
Skip to content
Case File
efta-efta01194768DOJ Data Set 9Other

DS9 Document EFTA01194768

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01194768
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
E D C B A 2 EXISTING BUILDING HEAVY DUTY ROLL UP DOOR ASSEMBLY 3 NEW PRE-FINISHED METAL ROOFING SYSTEM WITH VINYL INSULATION 4 0 0 PRE-FINSHED METAL SIDING 5 6 0 0 0 0 7 I I I I I I I PRE-FINSHED METAL SIDING EXPANSION JOINT I I I I I 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 ( I I I 1 1 1 1 1 1 I I I EAST ELEVATION A2.1 A2.1 SCALE: 1 /8"=1 NEW PRE-FINISHED METAL ROOFING SYSTEM WITH VINYL INSULATION 0 0 0 0 0 1 1 1 1 1 I I I I 1 I I I I I EXISTING BUILDING I I I 1 I I I I I I I I II I I I 2 WEST ELEVATION SCALE: 1 /8"=11-0" A2.1 I A2.1 2 4 5 6 7 E D C B A Na DAR PESIARKS 1 6.17.16 SHEET REVISED (.O1..r.I.L. TANIS Jac laredian Design Group no 33 Dronraws Gado • Ousters Ouarter PouCmco Sax 6218 SI. Maas. U.S. wry. iamb Neat leleptvene: einait 'toss rum me fie sena ElartiS WWI se no .O.11.nr.stO•MSCPW. 1.01, 40.1 metet lea= *MOS be allintliMalt4-010 amnia ow winsome ni irau MIS !UM .0101••••••11,4 De UR Il• shined Po C. 1142. Plana a Den "Ai lel elf an %San araw Mon You. Sean CM CRONWIS ••• an Inannarlan ISOM LITTLE ST. JAMES MAINTENANCE AND WORKSHOP BUILDING PROJECT PARCELS ABC LITTLE ST JANES US V.I DATE: 5-29.15 on/meow K.R.B. OCKED BY. K.R.B. *MOW(' re NIB PROJECT No: 15-001 CONTACT Na: SOIESTNO: A2.1 BUILDING ELEVATIONS EFTA01194768

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.