Case File
efta-efta01194779DOJ Data Set 9OtherLabonte
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01194779
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Labonte
Construction Services, LLC
4165 Linden Ave.
Palm Beach Gardens, F1.33410
PROPOSAL
5126/2015
Proposal Submitted to:
Mr,. Jeffery Epstein
CGC1514471
Proposal #15-173
El Brillia Way
Palm Beach, Florida
STAFF HOUSE
Description
Extension
PAINTING: Sand. prep and paint all interior walls and ceiling with 2 coats of Benjamin Moore paint Sand and
$
13.950 00
paint all doors and tnm with 2 coats of acrylic satin paint.
Sand and stain the existing wood floor area under
the office desk ( refinishing of entire office wood floor not included )
GUEST BATHROOM. Repair the water damaged drywall behind the Guest bathroom #1 toilet Replace the
$
2.975 00
guest bathroom water damaged vanity cab ,net ( counter top and faucet to remain ) supply a new glass bypass
shower door.
LAUNDRY ROOM: Remove existing waterheater, laundry equpment and deteriorated floor tile, rebuild the
$
6.19500
waterheater pedistal with new 3/4 inch painted plywood. Float and level laundry room floor. supply and instal
new 12 x 12 white / grey fleck vinyl VCT flooring with moisture inhibitor glue.
( excessive floor leveling or
subfloor repairs at additional fee )
Replace laundry room faucets ( 2 ) Reinstall
the existing water heater on the new closet pedistal.
AIR CONDITIONINGS Replace all existing HVAC supply I return grills ( 21 ) and exhaust fans ( 3 ) in all
$
1,850.00
rooms.
SUBTOTAL $
24.970 00
Labonte Construction Overhead and Profit
$
3,93000
TOTAL
$
28,900.00
Exclusions: All unforseen rotted wall and floor framing and rough plumbing. window treatment and
reinstaltaiton, appliances. HVAC equipment and systems, water heater, additional drywall repairs.
"This Contract" by and between Labonte Construction Services LLC and property Owner Mr. Jeffery Epstein
of date of owners signature on this proposal. Owner agrees to payment terms below per the scope of work identified
description. Starting on the Commencement Date of
and within thirty (30) days of permit isenance
furniture removal or
become effective as
on the work
and readiness
listed above. All
change order plus
of the jobsite. Labonte Construction Services LLC agrees to provide the labor and materials per the description
additional or changes in work by owner, architect or building dept is to be impbmented per an owner approved
15% over cost.
Pay schedule: .
50% due at contract signing for scheduling and material order.
40% of contract amount due at painting completion
Remaining 10% of contract at completion.
This proposal is valid for 30 days.
Acceptance of Proposal
Owner:
Date
EFTA01194779
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refinishingForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.