Case File
efta-efta01221493DOJ Data Set 9OtherSubbase Drydock Inc.
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01221493
Pages
4
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Subbase Drydock Inc.
T:(340) 776-2078 Fax:(340)779-8426
PO Box 4429/ Parcel 162 Subbase
Invoice
Date
Invoice #
4/23/2015
6812
Bill To:
Customer Phone
LSJ,LLC
Customer Fax
Customer E-mail
P.O. No.
Project
Terms
We accept cash,
checks. major erect cards. travelers
checks and wires funds. More into
available regarding wired monies.
Ann/Boscoe
Big N/LSJ Barge
Upon Completion
•
Qty/Hrs
Description
Rate
Amount
I
45
I
45
I
REVISED 05/04,2015
Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list"
this morning. I will list all projects that I can with a quote for each repair but first I would
like to comment on the condition of the I.S1 Barge.
This vessel was hauled out at our yard three years ago . During that haul out Subbase
quoted on most of the items you have in this current list. It was surprising to see that our
recommendations were not completed and as a result the current condition of the vessel is
not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs
that were essential were cobbled together in an effort to get by.
The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended
service life
Subbase in not interested in making any repairs that will not be done properly; nor arc we
interested in patching anything together for a temporary fix.
I understand that some projects may be more important then others so I will try to list each
project individually.
Drydock hauling fees
Laydays: Approx 45
Electricity fee: Hook Up
Electricity Fee: per day
5000 psi pressure wash
1,500.00
250.00
75.00
60.00
327.00
1.500.00
I 1,250.00
75.00
2,700.00
327.00
Thank you for your business.
Total
Please note Subbase Drydock Inc. reserves the right to not release
part/parts, projects or vessels for which/on which the above detailed
has been performed until payment in full is received.
any
work
Payments/Credits
Balance Due
EFTA01221493
Subbase Drydock Inc.
T:(340) 776-2078 Fax:(340)779-8426
PO Box 4429/ Parcel 162 Subbase
Invoice
Date
Invoice #
4/23/2015
6812
Bill To:
Customer Phone
LSJ,LLC
Customer Fax
Customer E-mail
P.O. No.
Project
Terms
we accept cash.
checks. motor cred't cards. travelers
checks and wired funds. More info
available regarding weed monies.
Ann/Roscoe
Big N/LSJ Barge
Upon Completion
. :,:atst,A,./.•
QtylHrs
Description
Rate
Amount
I
I
I
1 & 2. )Rudders: Subbase personnel examined the rudder room and we were able see major
corrosion on the transom. The hull plating has holes where sea water is seeping into the
vessel. The steering
components need to be removed and cleaned, the rudders need to be removed and serviced.
The lower Pienk and gudgeons need service as well as the rudder stuffing box. Upon
removing the rudders Subbase Drydock has determined that the bolt holes on each of the
flanges on the rudders have been severely worn and have to be cropped out and replaced
with new. In addition the tiller arm quadrants arc completely rusted and not salvageable
these have to be replaced. We have cut out the corroded plating on the stem and in doing so
we had to remove the stem rubrail. All the hardware for the rub rail i.e....bolts and nuts...
have to be replaced and new hardware used to reinstall rub rail. 545.000 includes labor and
material
3-A.) Install two cylinders with stainless steel shafts: including allhoses back to engine
room, with stainless steel ends on all hoses. Upon inspecting the engine room all the
hydraulic lines have to be replaced this includes the steering hydraulics and pump. Labor
and Materials will be 595.000 Please contact Island Rigging and Hydraulics for a mote
detailed estimate.
3-B.) The steel boxes that secure the cylinders to the hull arc deteriorated and will need
replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three
years ago we quoted S16.000.00 for both boxes and we will still honor this quote.
45.000.00
95.000.00
I 6.00it 00
45.000 00
95.000 00
16.000 00
Thank you for your business.
Tota I
Please note Subbase Drydock Inc. reserves the right to not release
part/parts, projects or vessels for which/on which the above detailed
has been performed until payment in full is received.
any
work
Payments/Credits
Balance Due
Mgr. 2
EFTA01221494
Subbase Drydock Inc.
T:(340) 776-2078 Fax:(340)779-8426
PO Box 44291 Parcel 162 Subbase
Invoice
Date
Invoice #
4/23/2015
6812
Bill To:
Customer Phone
LSJ,I,E.0
Customer Fax
Customer E-mail
P.O. No.
Project
Terms
We aCeept Can.
elseeks major ete0 I eagle, traeoleis
checks and wired funds. More info
available (cowling weed monies
A tin/Bosco('
Big N/LSJ Barge
Upon Completion
._ ,.
Qty/HrS
Description
Rate
Amount
1
I
1
I
1
I
4.) The exhaust system is in a non-repairable condition and needs replacement from the
main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust
mixers, and new exterior
aluminum outlet. When system is complete it will be wrapped with a removable wire mesh
hi-temp blanket. The new system will be much quieter than the existing exhaust system.
Labor and material $24,500
5.) Engine mounts need to be de-sealed of rust. Dohs holding mounts need to be cleaned or
renewed and alignment from coupling to shaft needs to be checked and adjusted for proper
tolerances. An extensive review was completed of this drive train back in 2012 with repair
recommendations made at that time. (before exhaust system is finalized this alignment must
be done). 7000 Labor and Material
6.) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be
owner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal
the condition of shaft log. I would reserve 5k for this project.
7.) Gutless bearings require removal of main shafts and propellers: After removal of
coupling. shafts and props a condition report will follow if drive train is serviceable the
routine maintenance for renewing cutlets bearing will only need attention. Labor and
material for this is (both port and starboard) $4,150.00.
8.) engine Cooling Grid: Pressure test system and issue report for this service. Reserve
$1,200.00
9.) Bottom paint and bather coat: Labor and material S7,500.00.
24.500.00
7,000.00
5,000.00
4.150.00
1.200.00
7.500.00
24.500 00
7,000.00
5.000 00
4.150.00
1.200.00
7,500.00
Thank you for your business.
Total
Please note Subbase Drydock Inc. reserves the right to not release
port/parts, projects or vessels for which/on which the above detailed
has been performed until payment in full is received.
any
work
Payments/Credits
Balance Due
I lye 3
EFTA01221495
Subbase Drydock Inc.
T:(340) 776-2078 Fax:(340)779-8426
PO Box 4429/ Parcel 162 Subbase
Invoice
Date
Invoice #
4/23/2015
6812
Bill To:
Customer Phone
1,S.1,LIC
Customer Fax
Customer E-mail
P.O. No.
Project
Terms
we eeeerm Cash,
checks, maker cod t cards. travelers
checks and weed funds. More Info
evadable regarding wired monies.
AnniBoscoe
Big N/1.SJ Barge
Upon Completion
.
- _,..a..11ILIEGel..ittl:
t
Qtyll-Irs
Description
Rate
Amount
I
I
I
I
I
10.) Engine and marine gear - Review upon haul out -- QUOTE WILL BE ISSUED ---
I I.) Fuel tank: Cleaning and disposal
19.) Clean engine room: Before any repairs arc started clean and degrease entire engine
room, dispose or oily water. After repairs are complete clean and paint engines and any
other areas that were painted.
Remove engine hatch covers and assess condition. Make necessary repairs and reinstall
after all. Labor and material 55.500.00
20.) Hydraulic Tank: Due to severe corrosion of the steel hydraulic tank, Subbase
reccomends replacing tank with new marine grade aluminum tank complete with all
necessary fittings and sight glass to view
levels. Labor and Materials.
21.) Engine Room Wiring: Upon an inspection of the engine room. Subbase Drydock has
determined that all of the engine room wiring is compromised. We will strip all the wiring
and renew all bilge pumps, engien room blowers, lighting and batteries. This also includes
running new gauges to pilot house and all new wiring to instrument control panel.
Repairing 24 volt alternator and adding second one to port engine. Labor and Materials.
Shipping and Freight Charges
•"One-third due at mobilization, one-third at 50% completion and balance at
completion"'
0.00
2,800.00
5.500.00
5,000.00
37.000.00
2.500.00
0.00
2,800.00
5,500.00
5,000.00
37,000.00
2,500.00
Thank you for your business.
Total
S274,002.00
Please note Subbase Drydock Inc. reserves the right to not release
part/parts, projects or vessels for which/ on which the above detailed
has been performed until payment in full is received.
any
work
Payments/Credits -$201,157.00
Balance Due
$72,845.00
EFTA01221496
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Fax
Fax:(340)779-8426Phone
(340) 776-2078Phone
(340)779-8426Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.