New LSJ-GSJ Mandatory Punchlist 5-17-19
1
No.
Area
Items
"" MANDATORY ""
LSJ/GSJ Punchlist
smartsheet
1
LSJ/GSJ
Daphne & Anna
Seth Ettinger - Restore
& More LLC
2
LSJ MC Kitchen
Karyna & JE
Banquette
3
Master Bedroom
Karyna
JE Pillow
4
Emergency Room
Anna & JE
EKG Machine
9
5
Theater Room
Anna & JE
Blackout Curtains
10
6
Housekeeping
Anna
Washers
11
7
_
Housekeeping
Anna
Dryers
12
8
Gym
Anna
Flooded
13
9
Sam's Place
Anna
Furniture
14
10
LSJ/GSJ
Anna & Daphne
Solar Lights
15
11
LSJ/GSJ
Anna & Daphne
Sun Umbrellas
16
12
Theater Room
Anna & Daphne
Drapes/Curtains
17
13
LSJ Salt Pond
Anna
Fountain Light
18
14
LSJ Helipad
Anna
Medical Kit
19
15
Chillax Room
Anna
Chillax
Exported on June 20. 2019 7:02:54 AM BOT
Page 1 of 27
EFTA01222499
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Purchasing, Shipments & Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tropical FL 6/5, sail
6/7 - EDA on STT 6/11. Clear, pickup equipment 6/12 - Seth a
(2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1.
Room, 2. Living Room, 3. Office,4. Twin Bedroom, 5. Master Be room.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym.
5/6/2019
6/12/2019
6/13/2019
Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas.
5/17/2019
Should know more after our trip on June 3rd.
5/17/2020
Order EKG Machine. JE to advise.
5/17/2021
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the door openings. Awaiting quote
from TJ "Home Theater Market" for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
4 Panels of lift 3M Long (135in), All 12 Panels are 4ft Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/30).
5/17/2022
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
5/17/2019
5/17/2019
5/28/2019
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ.
5/17/2019
5/17/2019
5/28/2019
Gym flooded on 5/30. all equipment moved to R/O Storage on 5/30.
Floor removal began 5/31/2019.
5/21/2019
Order Living room furniture & Kitchen Table
5/17/2019
Solar lights from China - departed from China 5/21 - 45 days to MIA -
EDA FL 7/3.
12/13/2018
12/20/2018
7/27/2019
Order 15 Cream Colored Sun Umbrellas. JE will choose.
5/17/2019
Wrinkle out the Drapes/ Curtains in the Theater. St. Thomas Dry
cleaners do not have a portable steam iron. Myla asked if she can
purchase to do the Job. She knows of a really good steam iron brand.
6/5/2019
5/25/2019
Order lighting for the Saltpond water fountain. Arriving to the Palm
Beach house on 5/30. Arriving on plane 6/3
5/16/2020
5/23/2018
6/3/2019
Purchase Medical items for Helipad Office
5/16/2020
5/23/2018
6/3/2019
Deep Clean Chillax room. Smells funny
6/4/2019
Exported on June 20. 2019 7:02:54 AM BOT
Page 2 of 27
EFTA01222500
Tentative
Completion
Completion Date
Date
6/4/2019
6/4/2019
Exposed on June 20. 2019 7:0234 AM BOT
Page 3 of 27
EFTA01222501
No.
Area
Who
Items
21
22
17
Michael & Custom
Welding - Terrance Philip
Welding
23
18
Welder
Ave Palms
Sylvester & Boniface
Large Windows
24
19
Grotto
Peter Elie
'?
25
20
New Road
Michael & Jeffers
Road Project
26
21
LSJ Generator Room
Michael & Contractors
Hurricane Shutters
27
22
GSJ Cottage
Michael & Contractors
Expert Builders
28
23
GSJ Helipad
Peter Elie
Helipad
29
24
LSJ Tunnel
Michael & Bill Terry
Skin it
30
25
Wreckshon
Michael & Bill Terry
40x60 Bld.
31
26
HM Storage
Michael & Contractors
00x00 Bld. ?
32
27
LSJ Fuel Room
Reefco
Vents
33
28
Engineering
Michael & Contractors
Doors
34
29
GSJ Staff Cottage
Jeffrey Boschulte
Permits
35
30
GSJ Barn
Jeffrey Boschulte
Permits
36
31
GSJ Terrace
Jeffrey Boschulte
Permit
37
32
GSJ Pool Extension
Jeffrey Boschulte
Permit
38
33
Waterfall (Tiki or
Park)
Peter Elie
Slab
39
34
Gym
Michael & Contractors
Doors
40
35
Flagpole Pool
Michael & Contractors
Shade Structure
41
36
flagpole Pool
Michael & Contractors
Freezer
Exported on June 20. 2019 7:02:54 AM BOT
Page 4 of 27
EFTA01222502
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Hell pad and tunnel gates are installed and ready for wood skin.
engineering and jurassic gates are due to be brought out to LSJ on
Wed., the 12th and installed. the wood skins will start as a carpenter
becomes available, likely mid week next week.
05/28/19
The two side windows are installed, just needing finish plaster. The
large opening door panels are being built.
05/21/19
5/28/19
Ismail scheduled to deliver and begin install by 5/31; will work around
weather. The installation will take around 10-14 work days.
5/31/19
Completion Date ? (6-8 weeks)
8/1/19
Forms and lighting installation complete by 5/25. Concrete pour TBD.
JE advise "H" to be Bigger. JE to review 6/5
5/17/2019
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
Recommend going with Allied.
5/17/2019
JB reviewed and approved drawings 5/22. MG approval and sign off of
the plans will be sent to Buck Steel 5/24.
5/17/2019
Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied.
5/17/2019
Install Vents in Fuel storage room. Dave reduced initial quote by 4500;
ordered 5/24; EDA on STT by June 15th and will then schedule install.
5/17/2019
Install Engineering doors. John Bedminster has estimate forthcoming.
5/17/2019
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out; JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK will notify JB once tax clearance letters back; JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to EK, who will submit the completed application on behalf of the owner. 5/17/2019
Permits: Barn - JB awaiting selection of supplier and specs.
5/17/2019
Build 75 foot round terrace.
5/17/2019
Extend current pool to 80 feet from 15 feet.
5/17/2019
5/17/2019
Bid coming from John Bedminster
5/17/2019
Waiting for three bids: John Bedminster, EB, Mr. Gumbs
JE advised not to order a freezer.
Exported on June 20, 2019 7:02:54 AM BOT
Page 5 of 27
EFTA01222503
Tentative
Completion Date
5/24/2019
6/21/19
Completion
Date
Exported on June 20. 2019 7:02:54 AM BOT
Page 6 of 27
EFTA01222504
No.
Area
Who
Items
42
37
LSJ TiId Hut
Michael & Contractors
Freezer
43
39
Dock GSJ
Amy Dempsey
Permits
44
39
Dock LSJ
Amy Dempsey
Permits
45
40
Christmas Cove Moorings
Patrick
Moorings
46
41
Old Generators
Michael & Bill Terry
Old Generators
47
42
Flagpole Pool
Michael & Contractors
Shade Structure
48
43
Five Palms
Franks Electric
'?
49
44
Five Palms
Peter Elie
Concrete
50
45
GSJ R/O
Michael & Contractors
2nd RIO Intake
51
46
GSJ New Dock
Michael & Jules
Dock Expansion
52
47
GSJ New Dock
Michael & Jules
Water Sport Ramp
53
48
Michael & Paul "Global
LSJ/GSJ Cables
Tech"
Underwater Cable
54
49
Permit
Amy Dempsey
Underwater Cable
55
50
Heavy Machinery Trencher
Michael
50
51
LSJ Library
Michael
Roofing & Trim
57
52
LSJ Tild Hut
Michael
Kitchen
58
59
BO
53
LSJ MB Bath
'7
Shower Tiles
61
54
LSJ Main Compound
Sylvester & James
Gazebo
62
55
Tunnel Entrance
Sylvester & James
Tunnel Gate
63
56
LSJ Helipad
Sylvester & James
Heli Service Gate
64
57
LSJ Dock
Mike & Brian Bates
Water Sport Dock Box
65
58
GSJ Tiki Terrace
Brian Bates
Wooden Furniture
Exported on June 20. 2019 7:02:54 AM BOT
Page 7 of 27
EFTA01222505
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
awaiting pickup for transport to LSJ.
5/10/2019
5/28/2019
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
under review by CZM.
Request moorings for Christmas Cove
Sell old Generators: Bill Terry to coordinate sale of the old generators,
Rich to speak with Bill.
Shade structure is replacing need for awning.
Electrical work to be done at Five Palms
5/28/19
Need more direction from JE. He was not pleased with current layout.
Bob Peterson coming 5/23
5/23/19
JE said stop work on 5/21
JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday, June 2, AA Flight 1391
2:57PM. depart Tuesday, June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment
and an operator.
6/5/19
Order Cohan countertop for Tiki Hut Kitchen
6/5/19
Awaiting quote from John Bedminster, this project involves new shower
hardware, plumbing, and tile work
Build 2 Gazebos at the MC. Mockup design given to Sylvester by JE. 4ft
on each side of the centered 3ft wide door.
5/15/2019
Materials needed to skin the gate frame
5/17/2019
Materials needed to skin the gate frame
5/17/2019
Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5/31 of completion date.
5/17/2019
Chest is complete. Lighting to be installed by 5/25.
5/17/2019
Exported on June 20. 2019 7:02:54 AM BOT
Page 8 of 27
EFTA01222506
Tentative
Completion Date
5125119
Completion
Date
Exported on June 20. 2019 7:02:54 AM BOT
Page 9 of 27
EFTA01222507
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
89
90
91
92
94
95
No.
Area
Who
Items
59
LSJ/GSJ Tiki sheds
Brian Bates
Thatch
60
Barn ?
'?
Barn
61
GSJ Terrace
'?
Chandelier
62
Sam's Place
Danny & Keshaun
Bedroom
63
Holy Shit Point
Brian & Ron
Structure
64
LSJ TildHut
Maurice & Boniface
Coral Stone
65
Cabana 1
Maurice
Shower Tile
66
Flagpole Pool
Sylvester
Kickplate
67
GSJ
Maurice
Tiki Bar
68
GSJ Guest BR
Sylvester
Carpet
69
GSJ Pool
Wooden Steps
70
Tiki Terrace
TJ & Oriole
Brown Paint
71
LSJ Dock
TJ & Oriole
Polyurethane
72
Tunnel
TJ & Oriole
Roof
73
Christmas Cove
TJ & Oriole
Structure
74
Sam's Place
TJ & Oriole
Bedroom
75
Main Compound
TJ & Oriole
Theater Root
GSJ Entrance
TJ & Oriole
Staircase
77
Grotto
TJ & Oriole
Steps
78
Main Compound
TJ & Oriole
Ceiling
79
Emergency Room
Jermaine & Liston
Fax
80
LSJ Island
Jermaine & Liston
Emergency PA System
81
GSJ Island
Jermaine & Liston
Emergency PA System
82
Chillax
Jermaine & Liston
82" TV
83
Chillax
Jermaine & Liston
82" TV Wall mount
Chillax
Jermaine & Listion
Sound Bar
Exported on June 20. 2019 7:02:54 AM BOT
Page I 0 of 27
EFTA01222508
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Order thatch to be installed after Hurricane Season. (70) rolls ordered,
on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT.
5/17/2019
5/22/2019
Supplier to be awarded
5/17/2019
5/17/2019
Repair Ceiling. Lighting socket needed
6/5/2019
Build Dock structure same as LSJ
5/17/2019
Maurice began tile work today 5/31.
5/17/2019
Shower floor is not draining properly in Cabana 1
6/5/2019
Install Kickplate
6/5/2019
Fix Cabinet & Drawers
6/5/2019
Cut Carpet to size. Carpet to long. Need to be centered under both
beds
5/17/2019
Demo and rebuild new steps. Steps to match existing stairs at the MC
6/6/2019
5/17/2019
Deck to be stained
Polyurathane Boardwalk
5/17/2019
In progress. Repair holes on tunnel roof
5/17/2019
Material to arrive 5/28; work to start 5/28.
5/17/2019
Paint after repairs are made
5/17/2019
Top Coat
5/17/2019
Paint steps in epoxy grey
5/17/2019
Paint steps in white
5/17/2019
Stain ceiling above the White Table
6/5/2019
IM
Ilowimmerarnmih
Pending setup of Efax account
5/17/19
Island wide system for intruders
5/17/19
5/23/19
Island wide system for intruders
5/17/19
5/23/19
Order 82" TV for Chillax Room and proper wall mount " 1'5/29/19 -
Pricesmart will have the 82" Samsung in stock
5/16/19
5/23/19
Order a Heavy Duty Wall Bracket to hold the 82" Samsung TV in the
Chillax
6/9/2019
New sound bar for the Chillax
6/17/19
6/18/19
6/18/19
6/19/19
Exposed on June 20. 2019 7:0234 AM BOT
Page 11 of 27
EFTA01222509
Tentative
Completion Date
Completion
Date
5/24119
619/19
6/7/19
6112/19
6/19/19
Exported on June 20. 2019 7:02:54 AM BOT
Page 12 of 27
EFTA01222510
No.
Area
Who
Items
Jermaine & Liston
LSJ/GSJ WIFI
New WIFI System
Jermaine & Liston
85
GSJ
Cameras
98
99
too
86
LSJ Cistern 1
Michael & JCH
Cistern Pump
101
87
GSJ R/O
Michael & Gemini
Seawater Systems
R/O Container
102
88
GSJ Ft/O parts
Michael & Gemini
Seawater Systems
RIO Parts
103
89
R/O Water
Michael & Smiley
Water Testing
104
105
106
90
Cabanas 1-4
Danny & Keshawn
Dimmers
91
flagpole Pool
Danny & Keshawn
Dimmers
92
MC New Planter
Danny & Keshawn
MC Planter & Palm
Tree Lighting
93
Tikl Waterfall
Anna, Danny & Keshawn
Pond Fountain
113
94
Flagpole Pool
Danny & Keshawn
Kitchen
111
95
GSJ Peters Point
Danny & Keshawn
Solar Lights/Other
112
96
Cabana 1
Danny & Keshawn
Rope Light
113
97
Master Bedroom
Danny & Keshawn
Wall Sconce
114
98
GYM
Michael & Liston
Equipment & Audio
115
99
Chillax
Danny & Keshawn
Phone Plug
116
100
Sam's Place
Danny & Keshaun
Bedroom
117
118
Exported on June 20. 2019 7:02:54 AM BOT
Page 13 of 27
EFTA01222511
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Completion date. [5-29-19 All Will, Access Points and switches and
currently waiting on 5 addition switches to handle the distribution of
existing phone services] [5-29-19] GSJ Wifi is in progress this week]
5/17119
5/23/19
Camera setup at Christmas Cove— Pending Mike to order Yeti Solar
Units and Panels as per email 5/24/19 [5/29/19 GSJ Dock Nest
Camera is active] [6-14-19 - Yeti's arrived at Palm Beach to be shipped
via Tropical]
5/22/19
6/4/19
6/11/19
5/23/19
RIO & Engineering
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
placed the order for the pump 5/24. Production time is 6 weeks - the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7/21
5/17/2019
5/24/2019
7/21/2019
On Island on GSJ
5/17/2019
On Island
5/17/2019
5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
Install Dimmers
5/17/2019
Dimmers not working properly
5/17/2019
In progress
5/17/2019
Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at
the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane.
5/17/2019
5/23/2019
Run wires and plugs properly. Make hole in cabinets if needed. Plugs
and wires should not be seen
5/17/2019
Lighting facing Peters Point for Safety
5/17/2019
Test in place. JE advise that we order more. Brighter than what's
installed at the moment.
5/17/2019
Wall sconce does not come on around the Master. Timer to be set
6:30pm -5am ?
5/17/2019
Wiring need to be done for GYM Equipment & Audio
6/4/2019
Replace or fix phone/Internet plug in Chillax
6/4/2019
Repair Ceiling. Lighting socket needed
6/5/2019
Plumbing & Reefco
Exported on June 20. 2019 7:02:54 AM BOT
Page 14 of 27
EFTA01222512
Tentative
Completion Date
Completion
Date
6/29/19
6/29/19
Exported on June 20. 2019 7:02:54 AM BOT
Page 15 of 27
EFTA01222513
No.
Area
Who
Items
1 10
101
GSJ Master BR
Michael & Charlie
Master Bath
12
102
Library
Reefco
Air Handler
izi
103
IT Server Room
Reefco
A/C Unit
.r
105
Cabana 1-4 Air Conditioning Units
Reefco
A/C Unit
122
106
GSJ
Reefco
A/C Unit
107
LSJ Laundry
Reefco
NC Unit
121-
ize
12
108
LSJ Landscaping
Cristobal & Fabian
Irrigation
12'
109
GSJ Stones
Danny & Renol
Stones
Chemicals &
12U
110
LSJ / GSJ Landscaping
Dupson & Daphne
Landscaping
Equipment
130
111
Island Wide
Landscapers
Orange Vines
131
112
LSJ Main Compound
Danny & Philimon
Pillars
132
133
Exported on June 20. 2019 7:0234 AM BOT
Page 16 of 27
EFTA01222514
Description
Initiation Date
Order Date
Projected Arrival
Date
No Hot water
5/17/2019
Replace air handler for the Library. Dave ordered 5/27; current lead
time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
Temp a/c installed. Board ordered. Waiting on schedule.
Shipping next week and hopes to have by May 31st. Goal is to install
week of June 3rd. PM already on routine schedule for Cabana 4.
PM already on routine schedule. Bedroom, Kitchen & Living Room
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Housekeeping NC is not working
6/4/2019
a_
Landscaping, irrigation & Stone walla
Install irrigation for new palms
5/17/2019
Stones from GSJ to LSJ to create and fix all Stone walls
5/17/2019
Order Pesticides & Fertilizer for all plants and palms: Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
Lawnmower Headquarters quote for Stihl and Silky equipment
approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
Remove all Orange Vines from plants on Island. Main Compound &
Island wide. Orange vines will kill the plants
Build 10ft. Pillars by the MC new planter
5/17/2019
6/5/2019
Wreckshop & Heavy Machinery Operators
6/5/2019
Exported on June 20. 2019 7:0234 AM BOT
Page 17 of 27
EFTA01222515
Tentative
Completion Date
Completion
Date
Exported on June 20. 2019 7:02:54 AM BOT
Page 18 of 27
EFTA01222516
No.
Area
Who
Items
134
113
HM Equipment
Tap & Dale
Quadski
135
114
HM Equipment
Tap & Dale
Fuel Truck / Flatbed
136
115
HM Equipment
Tap & Dale
Electric Carts
137
117
HM Equipment
Tap & Dale
Roller
138
118
Old Heavy Machinery
Tap & Jules
Removal
139
119
GSJ Engineering Shed
Jules & Buck
Berm
140
117
HM Equipment
Tap & Dale
Old Roller
141
117
HM Equipment
Tap & Dale
307 CAT
142
117
HM Equipment
Tap & Dale
JE Bike
120
JE Bike
Tap
Bike Handle
144
121
GSJ Hydroseeder
Tap
Hydroseeder
145
123
GSJ
Jules
Trenching
146
124
LSJ Tiki Hut
Jules or Peter
Tiki Parking
147
125
Wreckshop
Rychie
Office
148
149
150
126
GSJ Water Front
Patrick & Randy
Sail Boat
Exported on June 20. 2019 7:02:54 AM BOT
Page 19 of 27
EFTA01222517
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
We are working On the Quadski, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Blipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seat/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week - If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval
4/2/2019
Turn Fuel truck into Flatbed
5/17/2019
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
sent for undercoating (Rust proofing process) 5/31.
5/17/2019
5/10/2019
6/11/2019
Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
MG will schedule barge to pick up directly from Tropical Shipping STT.
5/17/2019
awaiting Barge
Create Berm to block LSJ view across from the RIO Containers
Need to order Solenoids & Alternator.
6/10/20019
Need to order Shanks for the bucket
6/10/2019
12 Rotors (each bike uses (6) 4 in the front and 2 in the back)
6/10/2019
Replace Bike handle
6/6/2019
Axle to be purchased asap
6/6/2019
Trenching Area & Description needed
6/5/2019
Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5
5/17/2019
Clean office immediately 6/5
6/4/2019
Marine, Barge & Water Sports
Remove damaged sail boat
5/17/2019
Exported on June 20. 2019 7:02.54 AM COT
Page 20 of 27
EFTA01222518
Tentative
Completion Date
Completion
Date
Exported on June 20. 2019 7:02:54 AM BOT
Page 21 of 27
EFTA01222519
No.
Area
Who
Items
151
127
Christmas Cove
Patrick & Randy
Boat debris
152
128
New Crew Boat
Patrick & Randy
Crew Boat
153
129
AYH / Big N
Boscoe & David
Fenders
154
130
- AYH / Big N
Boscoe & David
Cleats
155
131
AYH/Big N
Boscoe & Robert Lemire
Blankets
156
132
PR /Big N
Boscoe & David
PR Repairs
157
133
Nana
Randy
Offshore
158
134
Nautica Boat - NC, Tubes, Structure
Carlos, Patrick & Randy
NC
159
135
Spats Boat
Patrick & Randy
NC
160
161
162
138
GYM
Kevin, Garth, & Mike
GYM
163
164
165
137
JE Denali
Carlos & Caribbean Auto
Mart
NC
Exported on June 20. 2019 7:02.54 AM BOT
Page 22 of 27
EFTA01222520
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Remove boat debris
5/17/2019
5/17/2019
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
5124. Production lead time is 10 weeks. EDA to production completion
8/2.
5/17/2019
5/24/19
Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3
5/17/2019
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5 " I'm sorry, I don't have an answer as yet" He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic.
Take Nana to Offshore to get the Engines Checked. Per Randy on 6/10
Nana is scheduled to go down to Offshore on 6/18 for Engine Service &
Trim and tilt
Nautica delivered 5/18/19. Fiberglass modifications in progress on
starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be
shipped off. requested estimate for bow thruster replacement @ $3400
before shippingijust need okay from JEE and Rich to proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
Per Randy on 6110 Tube was removed on 6/8 and ready to ship out to
FL. Will follow up once its delivered to FL. Randy will send photos on
6/11.
5/17/2019
05/18/19
4/23/2019
6/5/2019
6/4 offshore scheduled maintenance replace both timing belts. sportis
dropped off 830am.... 6/4 work completed at 130pm picked up by PC
6/4. Per Randy on 6/10 Completed.
6/4/19
Cleaning, Organizing & DEMO
Demo Flooring in the GYM
6/3/2019
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
5/17/2019
Exported on June 20. 2019 7:02:54 AM BOT
Page 23 of 27
EFTA01222521
Tentative
Completion Date
Completion
Date
8/2/2019
6/15/2019
6/20/2019
6/4/19
614/19
6/6/2019
Exported on June 20. 2019 7:02:54 AM BOT
Page 24 of 27
EFTA01222522
No.
Area
Who
Items
166
138
LSJ Suburban
Carlos & Cliffs Auto
Repairs
Accident
167
168
169
170
171
172
173
174
175
176
Exported on June 20. 2019 7:02:54 AM BOT
Page 25 of 27
EFTA01222523
Description
Initiation Date
Order Date
Projected Arrival
Date
Start Date
Insurance Coverage & Repairs to be made. Carlos awaiting estimate
from Cliffs Auto Repair - by 5/31. Carlos will take the vehicle to
Guardian 5/30 for adjusters inspection. Per Carlos, Suburban estimate
is ready for pickup 6110.
5/20/2019
Pools & Power Washing
Exported on June 20. 2019 7:0234 AM BOT
Page 26 of 27
EFTA01222524
Tentative
Completion Date
Completion
Date
Exported on June 20. 2019 7:02:54 AM BOT
Page 27 of 27
EFTA01222525
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
5125119Wire Ref
wire harnessWire Ref
wire pulledRelated Documents (6)