Skip to main content
Skip to content
Case File
efta-efta01454621DOJ Data Set 10Correspondence

EFTA Document EFTA01454621

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01454621
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
RRP72 - Southern Financial Team Experience Certain Team members have advised Deutsche Bank with respect to over 800 non-ESA energy efficiency retrofit projects involving more than 175 Deutsche Bank-occupied buildings' Boiler Plant Improvements Chiller Plant Improvements Heating, Ventilation, and Air Conditioning (HVAC) Chilled Water, Hot Water, and Steam Distribution Systems Building Automation Systems Electric Motors and Drives Lighting Improvements Building Envelope Improvements Renewable Energy Energy and Utility Distribution Systems Water Energy Cost Reduction Through Rate Adjustments Retro Commissioning Advanced Metering Systems Replacement of existing boilers with high efficiency units. Includes boiler plant pumping, piping, as well as controls retrofits and replacements. Chiller retrofits or replacements. Includes chiller plant pumping, piping, as well as controls retrofits and replacements. Comprehensive package of air conditioning and heat pump unit replacement. Addressed elements can include HVAC damper repair and replacement; cooling tower retrofits or replacements; outside air economizers; air-to-air heat recovery; and variable air volume retrofits. Repair and replacement of hot water, chilled water and steam distribution systems. Upgrade or replacement of existing building automation system and install additional HVAC controls. Motor replacement with high efficiency units and variable speed motors or drives replacements. Interior and exterior lighting retrofits and replacements, occupancy sensor controls, LED retrofits, and day lighting controls. Building insulation, weatherization, window replacements, reflective solar window tinting, cool roofs. Installation of solar hot water and photovoltaic units. Transformer or power distribution unit replacement and associated power factor correction. Low-flow faucets and showerheads, low-flow plumbing equipment, cooling tower and boiler makeup water controls, grey water and rainwater recovery. Utility rate and tariff optimization combined with historical bill and meter auditing. Optimize recommissioning schedules, set points, and process controls. Test and repair control devices. Introduced monitored or enhanced commissioning. Meter and report tenant energy consumption. Add meters to ensure tenant billing accuracy. ft of Completed Projects3 4 17 40 7 18 9 213 4 5 13 57 5 351 2 Appliance/Plug-Load Reductions Replace refrigeration and kitchen appliances, vending machine controls, plug timers and controls with Energy Star^ products. 17 Other Green building refurbishments, demand response programs, other. 69 Total: 831 ' The Team believes this prior retrofit experience. although different in certain important respects from the type of projects being targeted by the PartnersNp. is relevant in evaluating the Team's overall level of experience in the retrofit market Team members collaborated with. and were assisted by. certain employees of Deutsche Bank affiliates and certain third parties in completing these projects See Appendix F. Note 8 for additional important information :Based on U.S. Department of Energy. Federal Energy Management Program (FEMP) project categories Team members were also involved in an additional 229 projects not included in the table above because the Team concluded they did not invoke certain key elements associated with the Partnership's retrofit strategy These projects include new building fit-outs, real estate consolidations, data center optimization. desktop technology deployment, managed pnnt services. coffee Mater appliance upgrades. and 11.8monitor upgrades Covers 2009 - 2012 time period Does not include projects still in process or not yet validated as of year-end 2012 Deutsche Asset RREEF Retrofit Partners, L.P. For U.S. Person Clients of the U.S /Americas Key Client Partners Desk Only -• June 2014 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112866 CONFIDENTIAL SDNY_GM_00259050 EFTA01454621

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreflective
Wire Refrefrigeration
Wire Refrefurbishments

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.