Case File
efta-efta01454630DOJ Data Set 10CorrespondenceEFTA Document EFTA01454630
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01454630
Pages
0
Persons
0
Integrity
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
RRP72 - Southern Financial
Appendix B: Case Study #7:
Frankfurt, Germany
12 energy and water projects
Projects'
Projects
Energy
Savings
(kWh)
Water
Savings
(liters
Water and Sewer
Conservation Systems
EcoLab Conveyer Dishwasher (2)
2
959,501
RCx Optimization - HVAC System
Commissioning
RCx Optimization - Pumping Controls
RCx Rescheduling - Cooling Equipment
10
449,847
1,069
RCx Rescheduling - HVAC System (7)
Total
12
1,409,348
1,069
2007 Baseline2
8,540,894
Percent of Baseline
16.50%
Projects in Progress
Does not include following projects not yet completed: (2) HVAC control upgrades (4) lighting improvements, (1)
metering upgrade, and (20) re-commissioning projects.
Building Data
Single Tenant
Mid-Rise Commercial Office
514,900 sq.ft.
Frankfurt, Germany
See footnote 1 on page 41.
' Project Data records and energy & water savings provided by ORES year ending 2012 Savings calctiation vakdated by third party, Arup Engineering
2 Uukty Data provided from Environmental Management System for year endirp 2012. Data verified by third party. ERM Certification and Verification Services.
Deutsche Asset
RREEF Retrofit Partners. L.P.
For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.mith Mana;rt-
June 2014
CONFIDENTIAL — PURSUANT TO FED. R. CRIM. P. 6(e)
DB-SDNY-0112883
CONFIDENTIAL
SDNY_GM_00259067
EFTA01454630
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.