Skip to main content
Skip to content
Case File
efta-efta01854928DOJ Data Set 10Correspondence

EFTA Document EFTA01854928

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01854928
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
VIRGIN ISLAND GUNITE POOLS St. Thomas • U.S. Vi in Islands October 24, 2011 Change Order #11 Proposal submitted to: Work to be performed at: Name: LSJ, LLC Little St. James Street: 6100 Red Hook Quarter Ste. B3 Main Compound Pool #10Il City: St. Thomas State: U.S.V.I. Zip: 00802 Phone: We hereby propose to supply all the labor for the installation of all tile (1x1) to the existing pool. LSJ to furnish all materials. Below is a scope of work: - Sawcut below waterline tile Chip ofTall waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing Diamond Britc plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and Diamond Brite Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!!! All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of: 42,600.00 - Forty two thousand six hundred dollars. With payments to be made as follows: $20,000.00 due upon move-in Balance due upon completion Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes. accidents. or delays beyond our control. Homeowner to carry fire, tornado. and all other necessary insurance upon above work. Respectfully Submitted: Per. Bart Wolterman Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date Signature EFTA_R1_00251483 EFTA01854928

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.