Technical Overview of Desalination Plant Requirements and Waste Disposal
Summary
The passage provides generic operational details about a desalination plant with no mention of specific officials, agencies, financial transactions, or controversial actions. It lacks actionable leads Facility size: 25 mgd capacity to produce 10 mgd potable water Land requirement: ~10 acres for infrastructure Complex treatment processes required
This document is from the House Oversight Committee Releases.
View Source CollectionPersons Referenced (1)
Tags
Related Documents (6)
Town of Palm Beach Water Committee documents and water quality reports (2008‑2009)
The material consists of routine municipal water‑supply planning, cost estimates for desalination and Floridan‑aquifer plants, and independent water‑quality testing. It mentions local officials (town Town is evaluating four water‑supply options, including a $160 M desalination plant and an $80 M Flo Independent testing by HSA Engineers found all water‑quality parameters below regulatory limits, w
Desalination Waste Solids Handling and Disposal Procedures
The document details operational aspects of solid waste disposal from desalination, with no mention of influential actors, financial misconduct, or controversial actions. It offers no actionable inves Desalination produces waste streams requiring landfill disposal. Solids are thickened, dewatered, and transported to landfills. Transportation adds operational costs and carbon footprint.
House Oversight Agenda Items on Water Plant Regulations
The document only lists generic agenda headings without any names, dates, transactions, or substantive allegations. It provides no actionable leads, novel information, or connections to powerful actor Mentions competing regulations for desalination and Floridan water plants References town's status as equal customer vs bulk customer Includes a 'Next Steps' item
Desalination Plant Cost Estimate – $160.5M Conceptual Budget
The passage provides a straightforward cost breakdown for a municipal desalination plant with no mention of individuals, agencies, financial flows, or misconduct. It lacks investigative leads, controv Total conceptual cost estimated at $160.5 million. Breakdown includes site work, intake, treatment processes, and contingency. Assumes plant is on city property with no land acquisition costs.
Desalination Process Flow Diagram – No Evident Investigative Leads
The document is a technical schematic of a desalination plant with no mention of individuals, agencies, financial transactions, or controversial actions. It provides no actionable leads for investigat Describes stages: pre‑treatment, membranes, post‑treatment, residual handling. Lists chemicals and equipment (calcite, chlorine, UV, RO passes). Contains internal reference code HOUSE_OVERSIGHT_01664
Tampa Bay Desalination Facility Overview
The passage merely describes technical specifications and funding for a desalination plant, with no mention of influential actors, financial flows, or controversial actions. It offers no actionable in 25 mgd plant co-located with power plant 8.5 acres for work in progress Provides 10% of regional water demand
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.