Skip to main content
Skip to content
Case File
efta-01454605DOJ Data Set 10Other

EFTA01454605

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01454605
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
RRP73 - Elysium Appendix B: Case Study #7: Wilhelm-Fey Strasse - Frankfurt, Germany 12 energy and water projects Projects' Projects Energy Savings (kWh) Water Savings (liters Water and Sewer Conservation Systems EcoLab Conveyer Dishwasher (2) 2 959,501 RCx Optimization - HVAC System Commissioning RCx Optimization - Pumping Controls RCx Rescheduling - Cooling Equipment 10 449,847 1,069 RCx Rescheduling - HVAC System (7) Total 12 1,409,348 1,069 2007 Baseline2 8,540,894 Percent of Baseline 16.50% Projects in Progress Does not include following projects not yet completed: (2) HVAC control upgrades (4) fighting improvements, (1) metering upgrade, and (20) re-commissioning projects. Building Data Single Tenant Mid-Rise Commercial Office 514,900 sq.ft. Wilhelm-Fay-strasse 31-37 Frankfurt, Germany See footnote 1 on page 41. ' Project Data records and energy & water savings provided by ORES year ending 2012 Savings calctiation vakdated by third party, Arup Engineering 2 Uukty Data provided from Environmental Management System for year endirp 2012. Data verified by third party. ERM Certification and Verification Services. Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only t W.mith Mana;rt- June 2014 CONFIDENTIAL — PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112824 CONFIDENTIAL SDNY_GM_00259008 EFTA01454605

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.