Skip to main content
Skip to content
Case File
efta-01454627DOJ Data Set 10Other

EFTA01454627

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01454627
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Appendix B: Case Study #2: 60 Wall Street — New York td energy, water, and renewab sJnergy projects Chiller Plant Improvements Building Automation Systems & HVAC Controls Heating. Ventilating, and Air Conditioning Upgrades Lighting Improvements Chilled Water, Hot Water, and Steam Distribution Systems Electric Motors and Drives Renewable Energy Systems Water and Sewer Conservation Systems Commissioning Appliance/Plug-load reductions Other 2007 Baseline2 Percent of Baseline Projects' New high efficiency Chiller (2) Recommissioning of hydronic free cooling system Kitchen exhaust fan controls Projects 3 1 Energy efficiency upgrade of exhaust fans Energy efficient replacement of ventilation fans 3 Energy efficient upgrade of fan coils unit installation of high efficiency lamps (3) LED lighting relamping (3) Lighting circuit timers (2) Occupancy sensor control (3) 15 3,649,293 3 Reduction of light levels Replacement of indoor lighting fixtures (2) Replacement of outdoor lighting fixtures New Domestic Hot Water Pumps Steam System Repair Replacement of elevator motors & controls Retrofit AHU with VFD and controls (3) 5 Retrofit CRAC with VFD and controls Photovoltaic Array 1 146.229 Cooling Water Treatment & Controls Installation of lowflow urinals Potable Water Treatment System Reduction in distribution losses 9 Reduction from domestic and fire water losses Reduction in replacement water for steam system Water efficient appliances (3) RCx Decommissioning (7) RCx Optimization (10) RCx Rescheduling (7) Energy Efficient Kitchen & Cafeteria Appliances (4) Plug Load - Vendormiser Automated demand response Tenant awareness - Earthhour Energy Savings kWh 3,258.095 396.555 Water Savings liters 18.295 2 3,659.643 2.364.891 1.565 68.309 52,073 Building Data High Rise Commercial Office Single Tenant Commercial Office with Trading 1,625,5001t2 60 Wall Street, NYC, New York 24 5,095.197 3.783 Projects In Progress Does not include the 5 130,815 544 following projects not yet completed: BAS 2 2.376 replacement, Chilled Water 70 18,789,698 57,968 92,550,623 20.30% Pump VFD and FIX Upgrade, and (4) lighting improvements. See footnote I on page 41. Project Data records arid energy & wale' savings provided by CRES year ending 2012. Savings calculation validated by third party. Arup Engineering. 2Utility Data provided from Environmental Management System tor year ending 2012. Data verified by third party. ERM Cenification and Verification Services Deutsche Asset RREEF Retrofit Partners, L.P. For U.S. Person Clients of the U.S /Americas Key Client Partners Desk Only W.Tml?" June 2014 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) CONFIDENTIAL SDNY_GM_00259062 DB-SDNY-0112878 EFTA01454627

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.