Skip to main content
Skip to content
Case File
efta-01740794DOJ Data Set 10Other

EFTA01740794

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01740794
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Sent: Thursday, November 3 2011 2:28:12 PM From: "Annabelle Neilson" Subject: annabelle To: Jeffrey Epstein <[email protected]> To get up the mountain: One can use a rolling gantry that would be pulled along by a tractor and winch set-up for correct weight capacity. The sculpture could be positioned and then lowered to the base. Roll the gantry away. All the equipment could be rented. For base: Cubic yardage or meters of cement is how base material quantity is measured. lcubic ft is roughly 100 lbs. Concrete load bearing is 2500-5000 lbs per square inch. Hope this helps big kiss honey, love the A EFTA_R1_00030344 EFTA01740794

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone500-5000

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.