Skip to main content
Skip to content
Case File
efta-01752054DOJ Data Set 10Other

EFTA01752054

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01752054
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Brice Gordon Sent: Thursday, July 17, 2014 3:49 AM To: Jeffrey Epstein Cc: John Christensen Subject: ZDC-MH Distribution Pumps Jeffrey Update MH Distributi=n Pumps The Motor on Pump One is grounding out, causin= both control and pump issues. This was probably caused by water=from pressure valve failure. The PLC ( control module) appears to be OK at this time JCH =ave removed motor and will determine if the motor can be repaired. Estimated Lead time for new motor 2 to 3 weeks We do have a sp.re motor, but require new pump gaskets, JCH have ordered gaskets and are s=heduled to repair by Monday next week at the latest. When spare motor and gaskets are installed, system should be fully ope=ational JCH will forward their recommendati=ns for a new pump skid and controls. any concerns=please let know regards =b>Brice Gordon 1 EFTA_R1_00050513 EFTA01752054

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.