Skip to main content
Skip to content
Case File
efta-01754012DOJ Data Set 10Other

EFTA01754012

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01754012
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: Cc: effrey Epstein [email protected]> Subject: Installing Electrical & Refrigeration lines in Elevator Shaft Sent: Wednesday, November 6, 2013 6:34:52 PM Hi Katie the owner of 9 East 71 street would like to install one electric pipe and one refrigeration line in the main passenger car elevator shaft from the 3rd floor up to the over head out to the roof for a air conditioning unit can you please check if this is possible. We are listed as a single family residence on the C of O for the building if that helps with the building department. Please advise if this is possible and what is needed to make this happen.Thanks Richard Barnettil EFTA_R1_00053978 EFTA01754012

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefrigeration
Wire Refrefrigeration

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.