Skip to main content
Skip to content
Case File
efta-01769604DOJ Data Set 10Other

EFTA01769604

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01769604
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Craig Martin Sent: Monday, April 23, 2012 9:30 PM To: Jeffrey Epstein Cc: Craig Martin Subject: Staffing Guide Here is a =roposed draw down of staffing. As construction ends we will have to retrai= staff to fit into their new roles. This does not t=ke into account retraining the boat captains to preform other duties as ye=. =OA Proposed Staffing Guide <=d height="13"› =/td> May 5 Island Managers = 2 =OA </=d> EFTA_R1_00080360 EFTA01769604 Head Engineer/ Mai=tenance 1 1 1 =OA Boat Captains <=d align="right">2 2 =OA 2 Engineering 4 =OA 2 2=/td> <=r> Maintenanceq=d> 5 As discussed most of the islands staffing is now i=volved in construction not on island maintenance. As the construction wi=ds down the staff in engineering, maintenance and marine services should=have more time to perform their permanent jobs. If we can teach them to =span id="misspell-1" class="">multi-task we should be able to=shrink the staff. <=div> Between engineering and ma=ntenance there are currently 9 people. Marine services has 3pp plus the =ead engineer position (Arran=, makes the total support staff 13pp. This is an extremely large support=staff for the island. &=bsp; Management is curren=ly looking at the staffing by who is there and how they fit into the cur=ent/new staffing structure. We need a new structure. If you look at the =taffing from a larger/different prospective, though, you would have a sm=ller staff that is trained in multi=/span> areas. We need more out of the box thinking. To get to this point=the current staff might have to be retrained or replaced. This may take =everal months to accomplish but could be done. We need a new org chart i= this area. Examples;<=b> May=e there is a marine mechanic that is the second boat driver who also run= the RO plant and is the i=land mechanic. When the island stops maintaining construction equipment =nd much of the equipment leaves the island and there is fewer boats to m=intain, this may be possible. Head Engine=r that is also a carpenter or a plant operator. Painter/ Carpenter/maintenance combined. 2 EFTA_R1_00080361 EFTA01769605 Structure; Cu=rently engineering reports to Aaran=/span>, maintenance to Brice, marine to both. Future; There should be one person to handle all. Th=y can then supervise all support staff and deploy them as needed. Landsc=ping might want to fall here also. Area= of work/Buildings. Although this may sound trivial I do not believe=the staff should be spread out in 3 or 4 different buildings. This makes=is very difficult to supervise them and to have them multi task . Currently, carpentry is in the building by the dock, electr=cians in the RO building, me=hanics in the shed and management in a separate building. It is almost i=possible to manage and supervise the staff that way. All the work spaces are over sized and could =e smaller and more efficient if redesigned correctly. I would also avoid=walls and use more fencing/windows where possible. You need to be able t= see the staff working. &=bsp; Example (for discuss=on) In the RO building have a carpenter shop, paint, e=ectrical, plumbing and a glass enclosed managers office. I believe this =ay fit. To accomplish thi=; Quads would go to dock =ide building. Storage to =ock side building. Electr=cal shop to shrink. Engin=ering storage to the two empty generator bays. The proposed new metal building would be a great asset but if you do n=t want to spend $250,000 on the building you could; Clean up current mechanics building. =OA Throw out much of the material the=e. Keep sensitive equipme=t/machinery in dockside building. There are 3 more containers in that bu=lding using valuable space as well as a large carpenter shop, large mari=e services shop that would have to be re purposed/moved/reconfigured. Larger equipment would be kept in current engin=ering shed/structure. &=bsp; These are just some =deas for discussion. &nb=p; The point is the way t=e support staff is currently structured will lead to a larger staff than=you want. I believe we should start with making the physical plant more =fficient and then reducing the staff. &n &n=sp; Craig =OA =******* ******* *** ******** **** ***** ***** The information contained in=this communication is confidential, may be attorney-client privileged, =ay constitute inside information, and is intended only for the use o= the addressee. It is the property of Jeffrey Epstein Unauthoriz=d use, disclosure or copying of this communication or any part thereof =s strictly prohibited and may be unlawful. If you have received this return e-mail o= by e-mail to jeevacation@gmail.=om <mailto:[email protected]> , and destroy this communication and all copies thereof, in=luding all attachments. copyright -all rights reserved 3 EFTA_R1_00080362 EFTA01769606 4 EFTA_R1_00080363 EFTA01769607

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.