Case File
efta-01782677DOJ Data Set 10OtherEFTA01782677
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01782677
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Cecile de Jongh <
Sent:
Tuesday, September 1, 2015 7:46 PM
To:
JEE; Rich Kahn
Subject:
Work in the Office
Attachments:
IMG_3870.1PG; Untitled attachment 00584.txt; IMG_3867JPG; Untitled attachment
00587.txt; IMG_3866JPG; Untitled attachment 00590.txt
The dry wall and ceiling have been installed in our offices. Tomorrow they w=ll sand in preparation for painting. The
estimate did not include painting=and I asked the contractor to give us a quote to paint both offices.
The new AC unit which sits above the kitchen (see first picture) is larger t=an the last one and therefore sits 2" lower.
Because of this, we have to p=t in a new, lower ceiling in the kitchen which will not line up with the ce=ling in the
hallway. An arch had to be added to square off the kitchen so t=at the lower ceiling tiles can be installed. This was not
part of the quot= either so I'm getting an estimate for that as well.
1
EFTA_R1_00102645
EFTA01782677
Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.