Skip to main content
Skip to content
Case File
efta-01788373DOJ Data Set 10Other

EFTA01788373

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01788373
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: emad hann Sent: Monday, May 16, 2011 9:27 PM To: Gary Kemey Cc: Jeffrey Epstein Subject: Re: Gary, Other items that I have not seen you respond =o are (unless you responded to JE and did not include me on the e =ail) Ion =chedule Dock House More People Tile =ayer Nursery Floor Mooring Fire Fuel =esalination Mechanical done by 4/17 Thank =ou Emad Hanna Project Controller HBRK Associates 301 East 66th St Suite 10F New York NY 10065 Cell LSJ Office St. Thomas Office = NY Office Fax On May 16, 2011, at 2:38 PM, Gary Kerney wrote: schedule for the =th Main pool the building slab will =e poured and block going up the pool equipment =ill be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes =fter the building is stoned) EFTA_R1_00112782 EFTA01788373 still on target for 10/3 Flag pole pool the building will be framed in and plastering =nderway the pool equipment will be in and water in the pool =assumes we get tile selection) the deck will be concrete(tile happens after shelter =nd plaster) walls will be underway still on target for =/15 2 EFTA_R1_00112783 EFTA01788374

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.