Skip to main content
Skip to content
Case File
efta-01792369DOJ Data Set 10Other

EFTA01792369

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01792369
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Sent: To: Subject: Send photos of thongs in kitchen On Jan 15, 2011,=at 5:50 PM, jeffrey epstein <[email protected]> Saturday, January 15, 2011 10:32 PM e: up date > wrote: =Hi Mr.Epstein the house cleaning ganization of all closet areas are go=ng as planed all electronic rubbish was picked up except fo= some cpu's that avants to clean up. The server room will be the next o= the list when integrates the server to apple. The ladies have been g=ing floor to floor cleaning every inch of the house all closets included. W= left all storage items laid out in the catering kitchen area on C-le=el for you to view, to decide what is garbage , or w=at can be sold and what can be used in other homes. I am also putting a=list together with pictures of all all other items that •has requester t= be shipped to LSJ . I would like to have all shipping items picked up=this coming week of 1/17/11 if possible, I have called &nbs=;and we will get pricing for shipping when we have a complete 1=st that you approve .1 have also been working on a hot water heating p=oblem that I discovered when the colder weather came in last week. The heat=ng system upper re heat Zones being supplied by AC-3 fan &=mp; the 5th floor fan units heating was loosing water pressure effecting ro=m temperatures on the 4th & 5th floors. After various trouble shooting t=sts I found the shell & tube Heat exchanger #2 has a tube le=k and the re heat hot water was leaking out water pressure through the=steam condensate line. This was causing the Re heat hot water s=stem pressure to drop and the re heat coils to get air bound on the 5=h & 6th floors. I have isolated heat exchanger #2 until the t=be bundle can be replaced ,we are operating off of Heat exchanger#1 with&nb=p; an extra steam bypass supply to make up the differencein capacity a=l rooms are now making set points. I replaced Heat exchanger #1 tube bundle=about 2 years ago, #2 tube bundle which is leaking is original to the h=use .The Source One project is also moving forward the full energy rep=rt and recommendations for system up grades will be complete by 1/25/1= i am also waiting on Pricing for up grades that AD Winston is wo=king on for free cooling & removal of the old Carrier Chiller and a=ding the additional 25 tons of compressors to the new Air stack C=iller. I am also in the rocess of setting up meetings with and t=e various mechanical maintenance contractors. See you soon &nbs=; Date: Sat, 15 Jan 2011 09:05:09 -0400 Subject: From: [email protected] <mailto:[email protected]> To: <mailto how s our project coming. &=bsp; The information contained in this communication is c=nfidential, may be attorney-client privileged, may EFTA_R1_00123132 EFTA01792369 constitute inside inf=rmation, and is intended only for the use of the addressee. It is the pr=perty of Jeffrey Epstein Unauthorized use, disclosure or copying of t=is communication or any part thereof is strictly prohibited and may b= unlawful. If you have received this communication in error, please noti=y us immediately by return e-mail or by e-mail to <mailto:[email protected]> jeevacation@gmai=.com <mailto:[email protected]> , and destroy this communication and all copies thereof, =ncluding all attachments. copyright -all rights reserved 2 EFTA_R1_00123133 EFTA01792370

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.