Skip to main content
Skip to content
Case File
efta-01792414DOJ Data Set 10Other

EFTA01792414

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01792414
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Sent: Saturday, January 15, 2011 9:50 PM To: Jeffrey Epstein Subject: RE: up date Hi Mr.Epstein the house cleaning andnization of all closet areas are g=ing as planed all electronic rubbish was picked up e=cept for some cpu's that wants to clean up. The server room will be =he next on the list when— integrates the server to apple. The ladies =ave been going floor to floor cleaning every inch of the house all closets=included. We left all storage items laid out in the catering kitch=n area on C-level for you to view, to decide what=is garbage , or what can be sold and what can be used in other h=mes. I am also putting a list together with pictures of all all oth=r items that Was requester to be shipped to LS1 . I would like=to have all shipping items picked up this coming week of 1/17/11 i= possible, I have called Oa and we will get pri=ing for shipping when we have a complete list that you approve .1 =ave also been working on a hot water heating problem that I discove=ed when the colder weather came in last week. The heating system upper re =eat Zones being supplied by AC-3 fan & the 5=h floor fan units heating was loosing water pressure effecting room temper=tures on the 4th & 5th floors. After various trouble shooting tests = found the shell & tube Heat exchanger #2 has a tube =eak and the re heat hot water was leaking out water pressure throug= the steam condensate line. This was causing the Re heat h=t water system pressure to drop and the re heat coils to get air b=und on the 5th & 6th floors. I have isolated heat exc=anger #2 until the tube bundle can be replaced ,we are operating off of =eat exchanger#1 with an extra steam bypass supply to make up the d=fferencein capacity all rooms are now making set points. I replaced=Heat exchanger #1 tube bundle about 2 years ago, #2 tube bundle which is=leaking is original to the house .The Source One project is =lso moving forward the full energy report and recommendations for system u= grades will be complete by 1/25/11 i am also waiting on Pricing fo= up grades that AD Winston is working on for free coo=ing & removal of the old Carrier Chiller and adding the additional 2= tons of compressors to the new Air stack Chiller. I am als= in the process of setting up meetings with and the various mech=nical maintenance contractors. See you soon Date: Sat, 15 Jan 2011 09:05:09 -0400 Subject: From: jeevacation@g=ail.com To: how s our project coming. The information contained in this communication is confident=al, may be attorney-client privileged, may constitute inside inform=tion, and is intended only for the use of the addressee. It is the pr=perty of Jeffrey Epstein Unauthorized use, disclosure or copying =f this communication or any part thereof is strictly prohibited and =ay be unlawful. If you have received this communication in error, ple=se notify us immediately by return e-mail or by e-mail to [email protected], and destroy thi= communication and all copies thereof, including all attachments. cop=right -all rights reserved EFTA_R1_00123232 EFTA01792414

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.