Skip to main content
Skip to content
Case File
efta-01799708DOJ Data Set 10Other

EFTA01799708

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01799708
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Gary Kerney Sent: Thursday, January 13, 2011 9:09 PM To: Jeffrey Epstein Cc: William Rowles; Subject: Schedule =BODY> =DIV>CONSTRUCTION Schedule Status =an.l3th =01W =DIV>Kitchen =01W inside ready by Feb.5 =DIV> Exceptions =DIV> =anquette =DIV> =rawers =DIV> outside =DIV> =xceptions =DIV> wall =conces on columns =DIV> handrails =n progress =DIV> exterior =ainting being finished up =DIV> =DIV>Master suite =DIV> bedroom =eady for furniture by Jan.21 =DIV> =/FONT> =DIV> Bath =eady for Feb.5 =DIV> =xceptions =DIV> =nbsp; temp tops and sinks on vanities =DIV> =nbsp; glass walls =DIV> =DIV>pair of arched doors should be =elivered about the 5th =DIV> =DIV>the outside tub will take til the =0th =DIV> =DIV>the stair walls will be very close to =one =DIV> =DIV> bedroom road should start by the =th =DIV> =DIV>little office floors,material will =rrive week of the 20th.will try to get in by the 5th pending labor to =et it down =DIV> =DIV>Mechinical buildings will be in =peration April 7 =DIV> =xceptions =DIV> =ecomminisioning of old plant area =DIV> site work =s part of the new and old complex =DIV> work =ssioated with the roof function =DIV> ready =or decorative painting =DIV> =DIV> =DIV> =DIV> =nbsp; =DIV> EFTA_R1_00138585 EFTA01799708

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.