Case File
efta-01808962DOJ Data Set 10OtherEFTA01808962
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01808962
Pages
2
Persons
0
Integrity
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
From:
Ann Rodrique
Sent:
Sunday, June 30, 2019 10:19 AM
To:
Jeffrey Epstein; Lesley Groff; Rich Kahn; Daphne Wallace; Michael Glidden; MYLA
TRESTIZA
Subject:
June 24th- June 28th (Work Completed or in-progress)
Hi all,
Main Compound Vulkem Roof: Completed
Theater Iron drapes: Completed
Cabana 1 New A/C installation: Completed Cabana 1 deep clean: Completed Main compound Stone Pillars: Completed
Library Roof Vulkem: Completed Flagpole Pool UV water light: Completed Main Compound UV water light: Completed
Master Bedroom UV light: Completed Main Compound Flood Lights: Completed Main compound Step lighting:
Completed Tiki Hut appliances: Completed JE bike Brakes & Rotor: Completed JE bike full maintenance: Completed GSJ
EMT Medical bag: Completed GSJ Guest bedroom carpet: Completed Main compound stone pillars: Completed Tunnel
electrical: Completed GSJ storage deep cleaning: Completed Tiki hut kitchen plumbing: Completed Theater lighting:
Completed Library window cabinet: Completed Chillax bath lighting: Completed Flag pole pool Cistern cleaning:
Completed Flag pole pool intake pipe: Completed GSJ kitchen deep cleaning: Completed Jeffers Road project sample:
Completed Lanscaping Cleanup: Completed Helipad Irrigation: Completed GSJ Main Compound Lighting: Completed MC
Power Washing roads: Completed Fiber pulled from Five Palms to GYM: Completed Cottage Hurricane Shutter:
Completed PRD New engines: Completed Nana New Steering wheel: Completed
Five Palms Plexi Door installation: Completed Plexi Door Notes: Re-painting needed from Sanding.
Tiki Hut Brown stain: 80% Completed
Notes: Tiki tiling to be completed before final portion is stained.
AYH Dock cleats: in-progress
Cabana 2 A/C: in-progress
GSJ Pool Painting: in-progress
GSJ Helipad: in-progress
Grotto Pool: in-progress
GSJ Cottage: in-progress
Tiki Hut tiling: in-progress
Sportis A \ C: in-progress
Pebble Beach: in-progress
Franks electric: in-progress
Holy shit beach: in-progress
Flagpole Shade Structure: in-progress
LSJ Dock Stain boardwalk: in-progress
GSJ Main Compound Painting: in-progress
Gym stone walls: in-progress
Ann R.
340.642-2587
c?xml version="1.0" encoding="UTF-8"?>
1
EFTA_R1_00162494
EFTA01808962
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd">
<plist version="1.0">
<dict>
<key>conversation-id</key>
<integer>11241</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1561889926</integer>
<key>flags</key>
<integer>862375014S</integer>
<key>remote-id</key>
<string>302222</string>
</dict>
</plist>
2
EFTA_R1_00162495
EFTA01808963
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01808830
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01809144
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01809186
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01808779
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01808969
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01808846
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.