Skip to main content
Skip to content
Case File
efta-01832815DOJ Data Set 10Other

EFTA01832815

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01832815
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epsteinueeyacationagmail.comj From: ion nicola Sent Wed 12/22/2010 11:39:25 PM Subject: RE: hi jeffrey, sorry about i wanted to go in new york and stay tiil after christmas eve.. i thought nobody is going to be here until beginning of january. i thought you know about this... a few days ago karren asked me when do we want to leave for christmas because she wanted to book our tickets, and then yesterday brice asked me when do i want to come back..so i told him begining of january..i didnt know that you dont know about it. sorry. sincerely talking, i would like to take a brake..i was here for a month. if i would have had one more person working in the master bedroom beside my girlfriend, it would have been done by now the room and the vestibule but i couldnt find someone else available for this period. and i didnt concentrate into master bedroom because they told me that is going to take more time for finishing the master bathroom, and even i would have finished with venetian plaster, you wouldnt be able to use the master bedroom untill the bathroom will be done. thats why i worked in cabana no 1, to be done and then you can use that. anyway, i finished today the bathroom in cabana no 1 and looks very good with the white counter top.. you will see. so now if the painters will paint the doors and the crown molding white, that will be done. cabana no 2 is done too after the painters will paint the ceiling. so no 1 and no 2 arc almost done. cabana no 3..sarah is giung to show me the design tomorrow morning. for master bedroom i think to finish the room and the vestibule i need like 5 days, and 3-4 days for the other 2 small rooms. my girlfriend put three coats of venetian plaster in the big room in master bedroom and two coats in vestibule, so the room needs one more coat maybe two here and there , and the vestibule 2-3 coats, then the design, and after that two coats of wax and then burnishing, then there are those two small rooms needs the entire process. sorry my girlfriend cant stay longer, she has schedule a grafic design job ..she has to be in new york next week and shes going to be busy for a while with that. maybe i can bring another friend in january, so he can work in master bedroom while ?m doing the cabana no 3., so then we can finish before january 15th both. so now i ask you because nobody asked you before.can i take a brake until beginning of january? even i go for christmas and come back monday, then will be only three days of work, tuesday, wed, and thursday. karren told me that friday nobody is going to be at the island. thank you, ion EFTA_R1_00210807 EFTA01832815

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.