Skip to main content
Skip to content
Case File
efta-01857583DOJ Data Set 10Other

EFTA01857583

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01857583
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey epstein[jeevacation©gmail.com] From: Gary Kerney Sent: Tue 8/9/2011 1:27:01 PM Subject: RE: 5 palms not yet, need following to layout slab I need new engineering of the foundation footings and steel supporting the high walls comfirmation on the door openings size and locations confirmation on size 16x32 From: Jeffrey epstein [[email protected]] Sent: Tue 8/9/2011 8:44 AM To: Gary Kerney Subject: Re: 5 palms Have we done anything to site? Sorry for all the typos .Sent from my iPhonc On Aug 8, 2011, at 10:07 PM, "Gary Kerney" wrote: latest plan attached ,the changes inside prompt revisiting the concept ceiling apply canvas install big bookcase any doors on east or west walls? what is the roof copy flagpole building? plaster exterior? image for doors?transom? I'm showing all walls to be 12"block,if we thicken the door wall it robs floor area or maks building bigger(comment?) I am forwarding this plan to the engineer to do preliminary structual ,won't go far tit floor size is agreed to. we are assembling the cabinet in the warehouse <110808134937-001.pdf> EFTA_R1_00255522 EFTA01857583

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone8134937

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.