Case File
efta-01878253DOJ Data Set 10OtherEFTA01878253
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01878253
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
To:
[email protected][
i
Cc:
Jeffrey [email protected]]
From:
brice gordon
Sent:
Tue 6/12/2012 9:32:58 PM
Subject: Re: hanger door paint
sorry i disagree, it will require 2 coats of paint, rolled on not sprayed, doors will need to be
washed down and prep since the top coat is a finish coat
2 guys 5 days weather dependant
On Tuc, Jun 12, 2012 at 5:10 PM,
wrote:
Jeffrey,
I believe it should take two painters one long day (max two days) to paint the exterior only of hanger
doors. The project does not require any prep since the base coat is white and no sanding or taping is
required, except for color change in middle of hanger doors to match the existing exterior. We'll need
to rent a high lift also.
If there is supervision this project could be completed fast. There tends to be a lot of standing around
and long breaks without supervision on remote projects in my opinion.
thx,
Larry
Brice Gordon
Little Saint James
USVI
Phone:
EFTA_R1_00289253
EFTA01878253
Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01912699
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01904473
0p
DOJ Data Set 10OtherUnknown
EFTA01761670
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01861123
0p
DOJ Data Set 10OtherUnknown
EFTA02002390
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01833943
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.