Skip to main content
Skip to content
Case File
efta-01884116DOJ Data Set 10Other

EFTA01884116

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01884116
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epsteinheevacation©gmail.comj Cc: Richard Kahn Fm: Sent Ur iiWZ6i2 9:45:05 PM Subject Re: Pricing on Engineering Building Pad Wee gordon We had discussed trying to get the building permitted. In the future if you want to erect the building we would need a stamped pad plan by govt. We can skip that if you want. Tom had said there are drafting services in STT that could draw a simple plan. The labor figure is using Tom's construction crew, plus a few more workers that they need on the days they pour cement. I will get Tom to give a breakdown. Craig From: Jeffrey Epstein <*eevacation mail.com> To: Craig Martin Cc: Richard Kahn Sent: Thursday, May 10, 2012 4:06 PM Subject: Re: Pricing on Engineering Building Pad what does site drawings mean . who is doing. this makes no sense, who is doing earthwork and for how long. i want now to see details , rich follow up On Thu, May 10, 2012 at 3:55 PM, Craig Martin wrote: Here is the quote on the engineering building pad. This is for the pad only. Please see exceptions below. This pad is designed to hold a future building. Bolts for building, minor drainage is included. If only a pad is needed without provisions for a building the price could be reduced slightly. Craig Ncw Engineering Building Pad Outside Material Labor Shipping Trucking Tax Vendor Temp Enclosure/safety 200 200 Material Handling 600 Equipment Rental 1500 Misc Expenses 1000 1000 Layout/Survey 200 800 E FTA_R1_00298626 EFTA01884116 Earthwork and Demo Site Drawings Pest Control Site Dranage 1000 Pipes/Utilities 500 Concrete 9350 Vapor Barrier 200 2800 2500 1000 1000 2000 8000 200 2000 2500 Ties/Accessories/boltsI500 1000 Rebar 2400 1200 Saw Cutting 250 400 Curing/Protection 300 400 Fine Grade 1000 Wood/Formwork 1200 1400 Fasmers 400 Sub Totals 18500 4300 22700 4500 Total 50000 Note; This is a basic pad No Utilities, septic sysyem, electrical, wall, or engineering yard work The pad will have 3 gray water drains. The pad will not have sanitary drains Includes min work on electrical vault E FTA_R1_00298627 EFTA01884117 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return c-mail or by c-mail to jeevacafi n mail.cam, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved E FTA_R1_00298628 EFTA01884118

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainmail.com
Phone1200 1400
Phone400 1200
Phone500 1000
Phone500 4300
Phone700 4500

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.