Punch List — May 4 2012
1. Flagpole Pool Cabana -
- Recovering of sofa/chairs - to be completed via JE direction in May
- Furniture - review another piece of furniture — Sarah
- Lighting - more down lights outside
2. Main Compound -
- Landscaping — purchase goat's foot vine on hillside —investigating options/price forwarded 5/4
- purchase Bougainvillea (bright red) for Basket; fill in front of basket with more dirt
- repairing of coral stone deck areas
- coral stone thresholds in guest rooms need to be cut
3. Five Palms —
- Electrical/Phone/Data — reviewing in house option — pull boxes
- Exterior Door Shutters - require JE approval
- Interior Doors — due on site 5/21
- Painting — final outside coat to be completed once all work is finished
- Waterproofing
- Furniture — X 2 cannonball lamps, bronze lamp — on site
- Sofa — purchase
- Built in Cabinets/shelves — to be completed by Bill — hinges due NYC 4/30 (Karen will bring down)
- Landscaping — level dirt - continuing
— relocate grasses— continuing
- Lights — outside light boxes on back and front walls to be covered over
- Light parrots and building —from roof line (rectangular 24 X10)
- Mirrored siding — sailing from FL 5/4, due on STT 5/8
- Framed Photos —JE to review 4/30
4. Grotto -
- Pavilion — painting to begin 5/1 - white
- Landscaping — more dirt required on left hand side as you look down, then hydroseed
- Shutters/generator doors/storage doors — ???
5. Hangar —
- Concrete Floor - grinding ongoing
- Painting — interior paint selected
- painting floor — completion 5/3 — delayed due to power issues
- Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ
6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process
7. Triangle — needs to be reconfigured, with more dirt on top and less around base
- more concrete required around edge
- additional road
8. Entry Tree Lights — lights on site
9. Solutions for Generators — Sound proofing solution forwarded to JE, require direction
10. Top of hill — CLEAN UP — remove rocks - ongoing, and hydroseed
12. Sunken Garden Berm — crusher runs - place inside berm area
- 4 large planter boxes with small planter inside require construction — size to be
determined by JE
13. Engineering —Clean Up —area needs to be leveled and metal shed to be laid out
- Landscaping — planting Sea grape
EFTA_R1_00298768
EFTA01884207
14. New vehicles — two more Polaris bikes (800's) — Larry/Brice
15. Dock —
- Entry — redo entry — Brice to source dock wood locally
- Decking - discuss pressure treated timber/carpeting
- Floating Dock — design required
- Jet ski Docking - review
- Table — final size/design to be determined — coral stone top — Bill
- Old floating dock — moved to engineering, requires redesigning
16. Mooring Permit — estimate to place anchors forwarded to JE 4/10 - awaiting direction
17. Telephone system — remove/add speed dial - programming disc on LS.15/1
18. Gates - Thatch needs to be applied to lower gates — both to be painted
19. Guest House at Beach 3 — sited, needs to be roughed out — start 4/21
20. Kite House — review of wooden outside furniture - Sarah
21. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
22. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
- put weather stripping at a minimum on bathroom door (as it is flooded) or change swing
with threshold
23. Mechanical Building
- Replacement Transformer — approved to purchase, forwarded to Rich K, who has requested an E Mail from JE
with approval
24. Boats
- Midnight Express — 4/2 approved to purchase Yamaha 300 motors, to be installed by Offshore Marine
- ship existing motors to FL, LV to sell — shipping 5/10
- PRD — sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
25. Sundial —
26. Hydro seeding —as much as possible especially when it rains
27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues
28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30
- bedroom door to outside to be adjusted and lock added
29. Entry basket — bougainvillea to be purchased for Basket and dirt added in the front
30. Nautilus (Main courtyard) area - requires cement band to continue
31. Relocate Tom's Trailer — area to be used for employee bathrooms
32. Move beach trees
33. Compass — hydroseed — 4/30
34. Sombrero ramp
35. Landscaping— bananas and bougainvillea
36. Timers — review installing timers on air conditioners, irrigation water systems, and lights
37. Life vests — new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not 4 in
unisex size so they can be exchanged - Sarah
38. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
- fix large broken light
*6ft grader - Jules
EFTA_R1_00298769
EFTA01884208
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.