isl • Island
Punch Ust/Project Ust
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
taborets I Hours
tabor Cost
eknenoicea Total Estimated cost
Stan Date
End Date I
Notes
1. Equipment and Vehicles
Brakes Black Bikes
11
1/3/2013 — reviewed & adjusted 1/3
Excess Oil Disposal
3,000.00
- proposal forward to Rich K 12/0, refowarded to Jeanne 12/29 awaiting direction
Electric Golf Cart Damage
- forwarded photos to dealer 1/1 awaiting response
Picture Frame 036 x 70)
-2. five Palms
3. Dock Boxes
Fabricated a lighter lid, still to heavy
J— Investigating resin/plastic option, up to 0 ft high will forward 1/5
6. Roads
General re-grading of roads - ongoing
1/3/2013
1/22/20131Canyas on site- forwarded to framer 1/3 completion expected 1/22
5. Landscaping - Peter's Ust
tine all Roads with Rocks - ongoing
Removed Palm Tree on MC Hill
Black Heli Under Pads - installation to begin
to be removed
existing pads
12. Stone Walls
Repair work to replace missing loose stones & complete Heli Pad
wall - after Employee Bathroom Project
20. Stores. Areas -
MI areas to be organized & inventoried
21. AC -
Proposing that the 2" unit from Kitchen is replaced & relocated
to a Hobbits
Bps
Maintenance contract option
Paint window frames
Danny Projects
Move lights on flag pole
Chinas bathroom electrical
Beach Office • repair outside light
Relax Bathroom . rewiring
Pool Cabana • change lights parking area
Screen Room • repair lamp
S Palms - repairs 2 floor Lamps
5 Palms - review exposed wires around coconut palms
berm - cover Electrical box
Info Center - review outside electrical box area
1/10/2013
- replacement lEE to advise
Brice to request proposal from Island Marine
1 of 5
EFTA_R1_00345144
EFTA01909617
LSI • Island
Punch Ust/Project Ust
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
I Laborersl Hours
Labor Cost
ram*, am Total Estimated cost
Start Date
End Date
Note
Kite House & Pebble Beach - review solar, relocate solar panel to roof of Pebble Beach House
Tiki House - Instant hot water system to be installed'
Tikl House - reinstall light cover in kitchen
Captains Office - installation new AC (on site)
Under Master Bedroom - repair AC unit
Lightbulb Replacement -
Office. Library Blackboard & Coiling, Master Closet Area,
Beach Lighting - section out
Water Proof Covers - for all outside electrical areas - hanger, flag polo pool
Jennaino Projects
Beach Office - no Internet/phone
Phones Down - master bathroom, room 4, 5 Palms,
Various maintenance
'horde Sculpture - base painted same as wall color
Gym/Bathroom/Roof - repainted
Hanger Area - door resurface & stain
• paint concrete block supporting wind sock
TN, Kitchen Roof - replacement
Flag Pole Pool. resurface & finish outside table & benches
• fridge need to be bolted down
MC - replasteripaint rising lawn edging
• Nista°, upper ceiling St John 8 Courtyard
Office - repaint air vent
Wooden Planters (new & old) • seal
Captains Office - plaster/paint interior
Thatch - all locations require new sections
Fans • Rust
Info Center - review drainage in parking area
5. Landscaping
Loading Dock - requires redesign
Sea Grape/Citrus Fenillter/Mukh/Plant Material -
Sunflower seeds
Caribbean Plants with color
Crave_protects
1/9/2013
13.000.00
$
13,000.00
1
Staff bathrooms
$9,500.00 5
9,500.00
Porta potty
$ 1.000.00
1,000.00
2
Pops garden
$3,730.00 $
3,730.00
Barge window frames
$1,000.00 $
1,000.00
Beach Equipment/Toy Rack
3
Planter boxes
Barge chocks
Bronze sculpture gym
1/8/2013
1/8/201
Peter 3 days
ordered - nursery reopens 1/7 awaiting ETA
-ordered -John Deere reopens 1/7 awaiting ETA
17/28/2012
Ingrid -Change jasmine qty to SO plants 100 bright red bougainvillea to order, 3 gal.
1/8/2013 Ingrid to work on order
3/2/2013 13 week contract ending 3/2/2013
MSI • bill $5,318.55 plus S4000 estimated fit out ( no list) - material on site, demo
1/18/2013 started 12/28 rough in plumbing complete, concrete work to begin 1/4
2/15/2013 MSI - $ 3730 - Demo existing, construct new shade/planter area
Brice to provide material list wood and hinges
2/9/2013
1/10/2013 Adana 2 to go using materials on site
To be raised
2 of 5
EFTA_R1_00345145
EFTA01909618
Isl• Island
Punch Ust/Pro$ect Ust
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
I taborets Hours
labor Cost
ranwwww Total Estimated cost
Start Date
trio Date
Note
TIM House - Propane Stand
Lattice Panels Installed - tunnel
Nap House/Staff Cottage - Replacement of all Screens
4
Audio equipment kitchen
Captains Office - AC Frame
Pergola Construction - High Road Benches
Redesign & Install all new beach signs
Cleaning. Organizing & Inventory of Wood Shop
17. Pools
Installation of x 2 variable speed pumps per pool
Flag Pole Pool - steps to be installed - require JE direction
MC Pool - steps to be Installed to pool pump room
Heater
14. Wet
Solar Vendors - Toshiba reps on site I/1. Toshiba have
postponed on site visit. Awaiting final proposal
1/12/201
1/10/2013
1/2/2013
7. Inseam
• Chiller - estimate forwarded //24 to lE for review. 12 week
lead time for equipment. 2 to 3 weeks Installation
130,000.00
9 Steel Shed
Structure
Shipping and trucking
Fit out
Tools
Accommodations
Alr
Food
Existing shed
Reskin
Fit Out lights
13. Cisterns
8. Hangar
Fuel Containment Pad
18. Roads -
$
43,140.00
$
7,554.55
$
6300.00
TBA
$
7,92000
2,401.90
TBA
1/18/2013
2/28/2013
- require design details/numbers from It
Question Toshiba on new meter to measure line loss and solar batter life in salt air
BM from Atlanta refrimratIon ( contact Kent) alternative bids to be obtained
Paid in advance Buck steal; 2nd building shipped 1.2.2013 ETA 1.5.2013 on STT ; Roll up
door ETA at Tropical 1.4.2013 sailing 1.9.2013 ETA STT 1.12.2013
12/19/2012 -ex.... cwitennnnewdonum ittaduntIl Imtammummuur. tweniniwiumna Nis
1/18/2013
1/29/2013
• UgMs, Switches, Electrical Equipment order - Danny to finalize 1/5
$ 200/nt 3 units 11 ins plus @20%
Paid In advance spirit
12,008.00
1/18/2013
2/28/2013 - Refit Existing Shed- sheeting etc ETA 1/5 roll up door to sail
1,500.00
13,200.00
1/11/2013
2/13/2013
Bid approved 11/8 Material on site. Start to empty dsterns 1/3. Walt to start 1/11
Expected completion by 2/13 $11,500 deposit made - All furniture in rooms I & 2 needs
to be removed or covered before work begins . After repair complete . laundry,
Hobbits, Bathroom, Pump Rm, Tech Rm all require repair/plaster/paint
- Plan ready for submission Plans sent out for new bid
3 ofS
EFTA_R1_00345146
EFTA01909619
Isl • Island
Punch List/Project Ust
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
I taborets I Hours
labor Cost
MA'AM ova Total Estimated cost
Start Date
End Date
- Other solutions to be Investigated
22. Fire System -
- Pipe that feeds the 300,000 gal system needs to be replaced.
Draining of tank started 1; I Will forward complete costing once
Pipe is inspected & scope of work determined
1/3/2013
Derust and Paint equipment
4. Boats
Lady G - sell - will remain at Nanny Ca`/ until sold.
Midnight Express . sell
1/15/2012
Purchase Yacht Tender
Purchase New Boat to replace Midnight 1.46
Repower Little C
10. Equipment/Household Purchase and Delivery
Italian Deck Chain
12/20/2012
1/23/2013
Pool Towels
Pace Clocks x 2 units
Ride on Mower - with bag option.
$
9.500.00
Fuel Truck
Tool Boxes - will forward options MAP
Pool Ladders - ETA VII
1/11/2013
Outside lanterns
Media Center - Relax Room -
Desk . Flagpole Pool Cabana
Rug - Flagpole Pool Cabana
Portable Electric Oven
12/26/2012
1/8/2013
Small Refigerator ( 4 to 8 bottles) five palms
11. Containers - RO & Generators in remaining container
1/5/2013
15. Media -
Stewart Screen
15,500.00
Blue Ray DUD Played Screen Rm)
Sub and Mini System (Kitchen)
16. Cell Repeater & Broadband -
YAGI and repeater
$
2,200.00
1/8/2013
Hangers for Lice Jackets
I
Notes
Hire individual to paint equipment - one month time
- buyer on site 12/21 will make contact by 1/15
- options forwarded to JE awaiting direction
- require budget
4- Jeanne investigating
- shipped from Italy 12/20 ETA STT 1/23
- on site - JE not happy with leer prefers previous towels.= investigating other op
- shipped to incorrect address - reordered - again delivered 12/28 to incorrect address.
Daphne trying to track down awaiting ETA
Brice to provide commercial invoice JE approved. Rick K to finalize
- repair work estimate 515K. Larry to get quote Review purchasing new unit.
- unable to get replacements, investigating other options
Copenhagen unit selected,
will forward options
- still in Paris awaiting ETA
- ordered ETA mid Feb
- shipped to FL 12/26 ETA FL 1/8
- possible offer due 1/5
Larry investigating purchase
Move exsisting system to NY
HE approved lermaine to order
Carlos to purchase 8
4 of 5
EFTA_R1_00345147
EFTA01909620
Ui • Island
Punch Ust/Project Ust
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
I laborers I Hours
tabor Con rants ova Total Estimated cost
Start Date
End Date I
Notes
a
I. Equipment and Vehicles
Dempsey had requested Inspection - Hodge preparing letter to DPNR(JP Oriel) and is
form
- No equipment or vehicles etc off the Island unless approved
19. Mos
gs
rin
—
inspection from
- Request
USCG - Darren
8. It n rfu
gafel
le
Fuel Containment Pad - Plan ready bar submission,
Permit status
i
Bolke and fuel availability
_
tease
_
completing army corp certification
Permit has been reviewed awaiting P. Smiths signature
I.V to discuss with Bolke
tease to be submitted on Tuesday. Jan 8, 2013
Draft letter for review with DM re ATT real estate division requesting tower
Option to install Broadband VI at one location I S99) a month 10 meges Continual . 5 up
.
1/8/2013
Cell_tosvers
Internetservice
full time house keeper
IT Support
Big N Barge Captain
I
i
land scene supervisor • once a week
S of S
EFTA_R1_00345148
EFTA01909621
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
RefigeratorWire Ref
refowardedWire Ref
refrimratIonForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.