Skip to main content
Skip to content
Case File
efta-01934469DOJ Data Set 10Other

EFTA01934469

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01934469
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: [email protected][[email protected]] From: MIE Sent: Wed 2/19/2014 7:59:03 PM Subject: Fwd: JEGE 908JE JEGE C check 2-19-14.xls Jeffrey,. this is the quote I fwd to Rich to review,. I wanted to share with you also,. this does not include cost for #1 and #3 engine inspection,. that estimate will follow later this week for Miami Gas Turbines,. Gary is working a buyer with AS IS quote before we start inspection,. long shot, but its possible,. should hear back by end of week,. thx larry From: Scott Stambaugh To: Cc: Sent: Wed, Feb 19, 2014 10:23 am Subject: RE: JEGE 908JE Attached is the pricing for the c check and all ADs. I will put together the pricing for the additional items Glenn sent and forward that on. Below is the pricing for the SB kit for compliance with AD 2009-05-03 (SB 727-28A-0128 fuel boost pump GFI relays). These materials for the GFI kit are not in the C check number in the bid. We have completed about 13 of these modifications already and have the long lead time parts in stock. So we won't have any lead time issues. Part Number Description Cost per QTY Total 65C38468-15 TOP KIT $25,900.00 1 $25,900.00 KDAG-X4F- GFI RELAYS $2,880.00 8 $23,040.00 001 61-12905-51 SUPP.HARDWARE $225.00 1 $ 225.00 KIT BACC45FN24- CONNECTOR $69.00 3 $207.00 43P6 BACC45FN24- CONNECTOR $72.03 3 $216.09 43P9 BACC45FN24- CONNECTOR $72.03 3 43P10 $216.09 EFTA_R1_00388426 EFTA01934469 From: Sent: Monday, February 17, 2014 10:22 AM To: Subject: Fwd: JEGE 908JE mailto: Scott, Please see Glen's additional items to get 908JE through to it's next "C" check after this one. Larry ---Original Message— From: Glen Webb To: Sent: Thu, Feb 13, 2014 1:03 pm Subject: RE: JEGE 908JE Hi Larry, I've attached a report listing those items that will not make it to the next check in Feb 2016. These are items that can be done during the 2A next year or done at Stambaugh as an AWR. Everything else is in the package I already put together. Glen From: mailto Sent: Thursda Februa 13 2014 10:14 AM To: Subjec : Hi Glen, Can you please build me an updated maintenance package for 908JE. Let's look at cleaning it up for24 months if we don't get into anything additional major. We are going to do the no.1 and 3 engines at this time as well. Mike Miejer will be contact you for engine information on the 1&3 . It is OK to forward whatever he requests. Looks like the Boss is willing to dump some money back into the Ole girl. Call me with any questions or to discuss the package. The aircraft will be going to Stambaugh within the next week. Larry EFTA_R1_00388427 EFTA01934470

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.