Case File
efta-01975944DOJ Data Set 10OtherEFTA01975944
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01975944
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
Jeffrey EpsteinUeevacation
mail.com
Cc:
Cecile de Jongh
From:
Jeanne Brennan
Sent
Tue 11/20/2012 7:46:57 PM
Subject Toshiba solar
Jeffrey,
We(Brice and I) spoke with Erika's contacts at Toshiba(Mark Lonkevych and Jeffery Ottaviano)
and Bostonian-Toshiba's reps in the I. ( Mark White and Tom Donney) this afternoon. They will
be emailing me this afternoon with items they will need from us to start the process of working up
what they referred to as an' energy generating plant with a diverse distribution system'.
Over view:
1. They look at the system at a very high level - provide a financial model with high level
budgeting.
2.They will design a solar system sized for LSJ load - after reviewing 24 months of bills.
3. Diverse distribution. WAPA has a max net metering systems size of 100K. Based on prelim
on LSJ needs - requirement would be a 'self-sufficient' system - battery backup not net metering.
Batteries would take up a size space as a 40ft container. Spoke about utilizing the existing
generators currently on the Island as the backup.
4. First take is LSJ would be better suited economically with a ground mount system. Talked
about needing 4-5 acres. A solar farm. Permitting will be a requirement.
5. Rough estimate of line loss based on a 480 watt cable - $5 to $10k a year.
Jeanne
EFTA_R1_00461798
EFTA01975944
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
mail.comRelated Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.