Skip to main content
Skip to content
Case File
efta-01977455DOJ Data Set 10Other

EFTA01977455

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01977455
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — October 29 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - Red Polaris Bike - Power Steering Module — incorrect unit arrived, correct unit resent due on site 10/27 - Lull — replacement parts ordered 10/19 — per Jack to Tropical by 11/1 - Kawasaki back and bottom cushions ordered 10/3 — per Jack to Tropical by 10/30 3. Five Palms - Outside furniture — tie down cushions to resolved wind issues - COMPLETE - Picture frame — on site, 86 x 70 — Sarah to forward selected picture, will frame locally - Mirrored siding — reglued S more section 10/24, will continue to reglue as sections fall off - 17 new sections and glue purchased — on STT 10/27 - Piano re-tuning — COMPLETE 4. Grotto - Mattress cover — completion expected 10/30 5. Berm/Top of Hill - Hydroseed all top of hill/berm — COMPLETE - rain continues to wash away seed in areas 6. Triangle - Must design triangle — awaiting JE direction - Palms will be relocated once Lull is repaired 7. Flagpole Pool Cabana - Furniture — desk from Paris — Sue arranging shipping to STT - Pace clock — unit rusted — ordered 2 new units - 1 for backup — due on site 11/8 - Auto closer on toilet door — David (carpenter) - COMPLETE - Add some lights near steps — COMPLETE — JE to review when on site 8. Floating Dock - Jet ski bumpers — complete — this installation has not resolved the issues of protecting the jet skis - Sea-Do Jet Ski — will need to review how this unit will be secured at dock - Dock box top — one final attempt to refinish — David (carpenter) — due to be completed 10/27 — struts to be replaced — David (carpenter) — will review when JE on site - "Walk the plank" — review material on this & floating dock — "rubberized material" — will review when JE on site - Dock carpet — at Tropical, sailing 10/31 9. Chillax Room — Requires furniture piece for electrical/media equipment - Sarah forwarded a selection 9/28 & 10/1 —awaiting direction 10. Chillax Bathroom - Blue rugs for bathroom & vanity area — please note attached photo showing existing rug which has softened & flattened out since its installation. Would suggest review when on site before purchasing 11. Mechanical Building Transformer — changed out - COMPLETE 12. Boats - Lady G — sell — will remain at Nanny Cay until sold - Big N — repair at AYH dock in progress — boxes to be installed 10/30, painting to be begin 10/29 — cylinders to be installed on LSJ — will discuss timing when JE on site — hydraulic hoses ordered 10/2 — per Jack to Tropical by 10/30 13. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List 1011,cda - — t tte_Atliiiiiir - High road waterfall — rocks to be installed EFTA_R1_00463980 EFTA01977455 - Line all roads with stones — require deer protection — Larry will bring electric fencing on plane - Shade cloth — adjustments made, have shade cloth to the ground, reviewing propagation of seeds which were planted 10/16 - Peter to clean the sides of the road — work in progress - Black Heli Under Pads — install at top of bike path at MC —1,206 sq. ft — Geoblock 5150 purchased — on STT 10/27 - Review growth of sea grape - engineering area — transplanting has not worked — review purchasing small plants - Take down the ropes at the end of the month on the trees — COMPLETE 16. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym NOLpgallatial - installation of the speed bag - David (carpenter) — old unit removed awaiting direction from JE - New front & back doors installation — David (carpenter) —COMPLETE — painting of doors to be completed 10/27 20. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood — David (carpenter) — will begin 10/26 21. LSJ Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP 22. Hangar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU dixPti' Tindoe r - (3) Terex RL-4000 6kW Light Tower systems — at Tropical, sailing 10/31 - (1) Skid steer forks —per Jack to Tropical by 10/30 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — delivered to Tropical 10/25 — will sail as soon as space is available - (1) 2003 Genie Z60/34 Boom lift — delivery to Tropical by 11/9 - (2) 2013 S4-Express electric golf cars purchased — on STT 10/27 - (1) 2012 Ford F450 Dump truck— on site - (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 10/22 — awaiting buckets from UK 11/2 - delivery to Tropical 11/5 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Interviewing 2 others on 10/27 via contact in Botany Bay. Employment Company Anna found was unable to provide anyone. 29. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ordered by Larry awaiting ETA to LS1 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 10/30 31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via email 10/22 32. Master Bedroom — door sliders require waxing and alignment — David (carpenter) - COMPLETE EFTA_R1_00463981 EFTA01977456

Related Documents (6)

Dept. of JusticeAug 22, 2017

11 MAY 25-MAY 27 901_Redacted.pdf

Kristen M. Simkins From: Irons, Janet Sent: Wednesday, May 25, 2016 11-29 AM To: Richard C. Smith Cc: Jeffrey T. We Subject: Meeting with Prison Society tomorrow Hello Warden Smith, I'm writing in preparation for our meeting with you and Director Hite tomorrow at 9:30 to talk about the Law Library. We have been in touch with Kim Kelmor, Assistant Director ofthe Law Library at Penn State, who has experience with prison libraries. She has helpfully provided us with some questions and guida

186p
Court UnsealedDec 11, 2018

Sentencing Memorandum

Sentencing Memorandum , USA v. WOLFE, No. 1:18-cr-00170-1 (D.D.C. Dec 11, 2018)

66p
Dept. of JusticeAug 22, 2017

15 July 7 2016 - July 17 2016 working progress_Redacted.pdf

Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith     Hello Warden Smith,     mother is anxious to hear the results of your inquiry into her daughter's health.   I'd be grateful if you could  email or call me at your earliest convenience.  I'm free today after 2 p.m.  Alternatively, we could meet after the Prison  Board of Inspectors Meeting this coming Thursday.    Best wishes,    Janet Irons    1 Kristen M. Simkins From: Sent:

1196p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA01655731

0p
DOJ Data Set 10OtherUnknown

EFTA01655772

16p
DOJ Data Set 10CorrespondenceUnknown

EFTA Document EFTA01656108

0p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.