To:
jeevacationepgmaitcompeevacation©gmail.cont J EpsteinUeevacation©gmail.com]
From:
BMG
Sent
Mon 4/23/2012 1:15:40 PM
Subject: Fwd: Re:
Sent from my iPhone
Begin forwarded message:
From:
To:
Cc: Arran Mc Ginnis <[email protected]>, TOM MELNICK
<I tjmelnickagmail.com>, Daphne Wallace <dlbwallaceegmail.com>
Subject: Re:
Good Morning to All,
Please note below - changes/additionshtpdates. Daphne could you please update
the Punch List to reflect these points, please call if you require more details
isiregards
always
On Sun, Apr 22, 2012 at 10:14 AM,
wrote:
On Sat, Apr 21, 2012 at 4:35 PM,
wrote:
5 Palms - Desk to be sent from NYC - Sarah will make arrangements
Outside Light Boxes on back & front walls to be covered over
Lights - light Parrots and building - from roof line (retangler 24 x 10)
lighting to be installed in ceiling - 4/23
Outside Coral stone seat - Brice will forward changes to Tom
Retaining Wall requires layout
Concrete Benches need placement
Grade require flatten/building up
Relocate grasses from Beach - JE will select location
Generator Pad - 24th
Mirrored Siding due on site 4/24
EFTA_R1_00513204
EFTA02011523
Cabinets/Shelves - to be completed by Bill
Doors - will confirm delivery date 4/23
Fire Box - requires construction with Mexician Tile on floor area
Painting - Final outside coat to be completed once all work as
finished
Level Dirt/Trees - 30th
Grotto - Road to mimic Starfish Market
Concrete pour 23th - complete 25th
More dirt required on left hand side as you look down, then
hydroseed
Shutters/Generator Doors/Storage Doors - to be completed by John
Flagpole Pool - Palm lighting starts 4/23
Bern - Crusher Runs, place inside Berm Area
50 Planter Boxes require construction - size to be determined by JE
Relocate Tie Downs to Engineering
Main Compound - Plant Goats Foot Vine on hillside
Repairing of coral stone deck areas
Coral Stone Threshold's in guests rooms need to be cut
Table on dock - final size to be determined - to be completed by John
coral stone top
Dock - Redo entry. Brice to source dock wood locally
Enginerring - Area needs to be leveled and metal shed to be laid out
Old Floating Dock - move to high road
EFTA_R1_00513205
EFTA02011524
Hanger - 2 x Queen Beds/Frames - purchase 4/26
Coconut Drawers, relocate to Hanger 4/26
LSJ, LLC
6100 Red Hook Quarters Suite B3
St Thomas
USVI 00802
LSJ, LLC
6100 Red Hook Quarters Suite B3
St Thomas
USVI 00802
LSJ, LLC
6100 Red Hook Quarters Suite B3
St Thomas
USVI 00802
EFTA_R1_00513206
EFTA02011525
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.