Skip to main content
Skip to content
Case File
efta-02014411DOJ Data Set 10Other

EFTA02014411

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02014411
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: 'eevacation mail.com 'eevacation©gmail.com]; Je vacation[[email protected]] Cc: From: on ass Sent Fri 12/23/2011 5:52:06 PM Subject Boeing 727 Jeffrey, I thought that it would be wise to go in steps. The attached only reflects a reduction on your part by 75K. I understand that you are willing to potentially offer another 75K. Let's see what their response is to this. Best Regards, Don Bass Dear Tarck, As you may know, I received an email from Mohammed on Wednesday regarding the Boeing. The C check inspection is currently underway and we arc anticipating completion of the inspection and the return to service of the aircraft on approximately February In. A contemporaneous pre-purchase inspection can still be accomplished from a timing standpoint. In the interest of reducing the total cost associated with your acquisition and refurbishment of the aircraft, I believe that you will be able to reduce the total cost of the improvements referenced previously on Exhibit A from 500K to 425K. Larry has pointed out that the installation of Satellite AFIS is redundant with the installation of High Speed Data in the aircraft. The same real time weather information will be available to the pilots via the broadband internet and thus the 75K cost for Satellite AFIS is an unnecessary expense. EFTA_R1_00517075 EFTA02014411 If I can convince the seller to reduce the price by 75K as well — this would reduce the total, completed purchase price of the aircraft by 150K and still provide you with an aircraft that has all of the capabilities and modifications that you and the Sheikh require. I am concerned that if we are unable to reach an agreement in the near future, the ability to complete the pre-purchase inspection in conjunction with the C inspection would be lost, resulting in increased cost and time for both parties. I feel that this is a reasonable and fair approach to resolving the differences between the parties. Yours Sincerely, Don Bass EFTA_R1_00517076 EFTA02014412

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreferenced
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.